General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 22-1-2020
ADA UPGRADES TO FONDY MARKET AND PORT OF MILWAUKEE FONDY-2200 W FOND DU LAC AVENUE, MILWAUKEE PORT OF MILW-2323 S LINCOLN MEMORIAL DRIVE
02/05/2020 04:30 PM UTC
OFFICIAL NOTICE 31-1-2020
2020 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
02/04/2020 04:30 PM UTC
Official Notice 1-1-2020
STORM SEWER MAIN RELAY In: N. 21st St. - W. Melvina St. to N. Teutonia Ave. N. Teutonia Ave. - W. Nash St. to N. 21st St. W. Vienna Ave. - N. 19th Pl. to N. 20th St.
01/30/2020 04:30 PM UTC
Official Notice 1-2-2020
COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: Located at: N. 26th St. – W. Walnut St. to W. Vine St. W. Walnut St. – N. 26th St. to N. 27th St.
01/30/2020 04:30 PM UTC
OFFICIAL NOTICE 1-3-2020
SANITARY AND COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 34th St. – W. Walnut St. to W. Lisbon Ave. N. 49th St. – W Galena St. to W. Vine St. N. 53rd St. – W. Chambers St. to W. Burleigh St. W. Vine St. – 160' +/- East of N. 28th St. to N. 28th St.
01/30/2020 04:30 PM UTC
Official Notice 23-1-2020
Municipal Building, 11th Floor AHU-34 Cooling Coil Replacement 841 North Broadway Milwaukee WI 53202
01/29/2020 04:30 PM UTC
Official Notice 7-1-2020
WATER MAIN RELAYS AND LEAD SERVICE RELAYS, at the following locations: W. Melvina Pl.(WT410160606), N. 30th St. to N. Hopkins St.(8 working days); W. Capitol Dr.(WT41060607), N. 29th St. to N. 30th St.(13 working days); N. 30th St.(WT410160608), W. Melvina Pl. to W. Capitol Dr.(27 working days); N. 38th St.(WT410160628), W. North Av. to W. Wright St.(36 working days); N. 16th St.(WT410160634), W. Hadley St. to W. Locust St.(28 working days); E. Belleview Pl.(WT410160687), N. Terrace Av. to N. Wahl Av.(11 working days); E. Belleview Pl.(WT410160688), N. Downer Av. to N. Lake Dr.(22 working days); N. Summit Av.(WT410160689), E. Belleview Pl. to N. Downer Av.(21 working days). (Note: Contractor to furnish and install approximately 4920 lin. ft. of 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/28/2020 04:30 PM UTC
Official Notice 26-1-2020
REMOVAL/PRUNING OF DEAD AND HAZARD TREES OR BRANCHES. Work performed under this contract shall consist of dead and hazard tree abatement throughout the City of Milwaukee. The CONTRACTOR shall furnish all labor, supervision, administration, materials, equipment, disposal, utility coordination, insurance, licenses, and permits as required for removal/hazard pruning of dead and hazard trees or branches from privately owned properties in violation of City Ordinance 116-53.
01/22/2020 04:30 PM UTC
Official Notice 24-1-2020
Witkowiak Park Reconstruction 1648 South 4th Street Milwaukee WI 53204
01/16/2020 04:30 PM UTC
OFFICIAL NOTICE 116-1-2019
WATER MAIN RELAY AND HYDRANT ALTERATION at the following locations: S. 108TH St.(WT410190008), at W. Layton Av.(4 working days); S. New York Av.(WT410190675), E. Bottsford Av. to E. Van Norman Av.(16 working days); E. Bottsford Av.(WT410190676), S. Pennsylvania Av. to 300’ E/O S. Illinois Av.(33 working days); N. Teutonia Av.(WT410200001), W. Groeling Av. to W. Capitol Dr.(13 working days); N. 60th St.(WT410200003), W. Capitol Dr. to W. Hampton Av.(4 working days) (Note: Contractor to furnish and install approximately 2537 Lin. FT. 16", 12", 8", and 6" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2019 04:30 PM UTC
611 - 620 of 1491 Solicitations
1 2 58 59 60 62 64 65 66 149 150