General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 112-1-2019
PROJECT NO. 1: COMBINED SEWER MAIN SLIP LINING , MANHOLE REPAIR AND LINING: Located at: N. 26th St. (E/S) – W. North Ave. to W. Wright St. W. Medford Ave. – W. Wright St. / N. 26th St. to N. 27th St. N. 27th St. – W. Medford Ave. to W. Center St.
11/08/2019 04:30 PM UTC
OFFICIAL NOTICE 37-1-2019
PROJECT NO.1: STORM SEWER CLEANING AND EXAMINATION Various Locations in the City of Milwaukee
10/30/2019 03:30 PM UTC
OFFICIAL NOTICE 25-1-2019
HP-186: COAGULATION BASIN #1 FLOCCULATOR UPGRADES
10/22/2019 03:30 PM UTC
OFFICIAL NOTICE 101-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENT, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190160 - 2019 Scatter Sites Sidewalk Replacements At Various Locations City Wide
10/01/2019 03:30 PM UTC
OFFICIAL NOTICE 99-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct Asphalt Speed Humps at the Following Locations: (ST211180222) – N. 12th St. – W. Concordia Ave. to W. Keefe Ave. (2 speed humps) (ST211160164)–N. 16th St. – W. Atkinson Ave.to W. Capitol Dr. (1 speed hump) (ST211180269) – N. 21st St. – W. Nash St. to W. Vienna Ave. (1 speed hump) (ST211190113) – S. 25th St. – W. Holt Ave. to W. Ohio Ave. (1 speed hump) (ST211180273) – S. 25th St. – W. Greenfield Ave. to W. Scott St. (1 speed hump) (ST211180271) – S. 25th St. – W. Mineral St. to W. National Ave. (1 speed hump) (ST211190107) – N. 25th St. – W. Center St. to W. Hadley St. (1 speed hump) (ST211180283) – S. 31st St. – W. Hayes Ave. to W. Lincoln Ave. (1 speed hump) (ST211190139) – S. 36th St. – W. Mitchell St. to W. Lapham St. (1 speed hump) (ST211190114) – N. 41st St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211180276) – N. 45th St. – W. Concordia Ave. to W. Townsend St. (1 speed hump) (ST211190115) – N. 49th St. – W. Washington Bd. To W. Vine St. (2 speed humps) (ST211190118) – N. 62nd St. – W. Hope Ave. to W. Marion St. (1 speed hump) (ST211180249) – N. 70th St. – W. Locust St. to W. Lisbon Ave. (2 speed humps) (ST211180266) – N. 74th St. – W. Marion St. to W. Congress St. (1 speed hump) (ST211190111) – W. Mineral St. – S. 24th St. to S. 25th St. (1 speed hump) (ST211180275) – W. Mineral St. – S. 25th St. to S. 26th St. (1 speed hump) (ST211180268) – W. Rogers St. – S. 23rd St. to S. 24th St. (1 speed hump)
09/30/2019 03:30 PM UTC
OFFICIAL NOTICE 100-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190157 - Area 1 - 2019 Sidewalk Replacements Area Bounded By (ABB): E. Locust St., N. Maryland Ave., E. Kenwood Blvd., to N. Downer St.
09/27/2019 03:30 PM UTC
OFFICIAL NOTICE 36-1-2019
PAVEMENT RESTORATION & REPLACEMENT AT STORM INLETS, CATCH BASINS, MANHOLES, AND OTHER LOCATIONS Located at: VARIOUS LOCATIONS IN THE CITY OF MILWAUKEE
09/25/2019 03:30 PM UTC
OFFICIAL NOTICE 108-1-2019
MACARTHUR SQUARE ELECTRICAL MODERNIZATION 841 N JAMES LOVELL STREET MILWAUKEE WI 53233
09/24/2019 03:30 PM UTC
OFFICIAL NOTICE 111-1-2019
WITKOWIAK PARK RECONSTRUCTION 1648 SOUTH 4TH ST MILWAUKEE WI 53204
09/16/2019 03:30 PM UTC
OFFICIAL NOTICE 98-1-2019
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL BITUMINOUS/AGGREATE MIX. SEALCOATING WILL INCLUDE SURFACE CLEANING/SWEEPING OF PAVEMENT WITH MECHANICAL SWEEPERS, INSTALL/REMOVE PROTECTIVE COVER OVER, WATER BOXES, INLETS GRATES AND MANHOLE COVERS, ETC.; Located at: ST211190148 – 2019 Seal Coating by Contract @ Various Locations City Wide
09/12/2019 03:30 PM UTC
611 - 620 of 1476 Solicitations
1 2 58 59 60 62 64 65 66 147 148