The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 13-3-2021
PROJECT NO. 3: SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING Located at: Area Bounded By S. 27th St. to S. 44th St. and W. Montana St. to W. Ohio Ave.
03/03/2021 04:30 PM UTC
OFFICIAL NOTICE 6-1-2021
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216210105 – High Impact Project Locations North 68th Street - West Fond Du Lac Avenue to West Villard Avenue West Brentwood Avenue - North 84th Street to North 89th Street West Calumet Road – e\o North 67th Street to North 76th Street West Grantosa Drive, West Appleton Avenue to North 92nd Street North 99th Street – West Good Hope Road to West Bradley Road (painting of bike lanes only)
03/02/2021 04:30 PM UTC
OFFICIAL NOTICE 3-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216200108 – ADA RAMPS FOR 2016 HIGH IMPACT PAVING PROJECTS @ THE FOLLOWING LOCATIONS: - West Center Street – North 20th Street to North 27th Street - West Center Street – North 43rd Street to North 60th Street - West Morgan Avenue – West Forest Home Avenue to South 68th Street - West Oklahoma Avenue – South Chase Avenue to South 6th Street - West Grange Avenue – South Howell Avenue to South 6th Street - South 16th Street – West Windlake Avenue to West Oklahoma Avenue
02/24/2021 04:30 PM UTC
OFFICIAL NOTICE 19-1-2021
ASBESTOS & HAZARDOUS MATERIALS ABATEMENT – SELECT INTERIOR DEMOLITION
02/22/2021 04:30 PM UTC
OFFICIAL NOTICE 4-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 8” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216210103 – ADA RAMPS FOR 2021 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTHSIDE PROJECTS)
02/19/2021 04:30 PM UTC
OFFICIAL NOTICE 2-1-2021
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, SEWER WORK, CUC WORK, ETC.; Located at: ST216200108 – ADA RAMPS FOR 2016 HIGH IMPACT PAVING NORTHSIDE PROJECTS @ THE FOLLOWING LOCATIONS: - West Lisbon Ave./West Walnut Street - North 20th Street to North 31st Street - 35 corners - West Atkinson Avenue - West Keefe Avenue to North Teutonia Avenue - 67 corners - Ruby Yard - West Congress Avenue to North 30th Street) - 4 corners - West Roosevelt Drive – North 36th Street to West Fond Du Lac Avenue - 38 corners - West Villard Avenue – North 43rd Street to North 51st Street - 25 corners - North 37th Street- West Townsend Avenue to West Fond Du Lac Avenue - 22 corners - North 51st Boulevard- West Fond Du Lac Avenue to West Hampton Avenue- 17 corners - North 85th Street – West Capitol Drive to West hope Avenue- 7 corners - North 87th Court – West Fiebrantz Avenue to a point North - 4 corners - North 88th Street – West Fiebrantz Avenue to West Olive Street - 10 corners - North 92nd Street – West Lisbon Avenue to West Capitol Drive - 12 corners Total Corners = 241
02/17/2021 04:30 PM UTC
OFFICIAL NOTICE 12-1-2021
PROJECT NO. 1: SANITARY SEWER MAIN REPAIR & LINING AND MANHOLE REPAIR & LINING Located at: Area Bounded By S. 27th St. to S. 44th St. and W. Montana St. to W. Ohio Ave.
02/12/2021 04:30 PM UTC
OFFICIAL NOTICE 106-1-2020
WATER MAIN RELAYS, at the following locations: S. Miner St. (WT410200617), W. Fardale Av. to W. Howard Av. (12 working days); W. Fardale Av. (WT410200618), W. Loomis Rd. to S. Miner St. (21 working days); S. 33rd St. (WT410200625), W. Paine St. to W. Verona Ct. (12 working days); W. Paine St.(WT410200626), W. Lakefield Dr. to S. 33rd St. (12 working days); S. Sunset Dr. (WT410200638), W. Morgan Av. to S. Massachusetts Av. (42 working days); W. Tripoli Av. (WT410200639), S. Massachusetts Av. to S. 73rd St. (33 working days); S. 74th St. (WT41020640), W. Van Beck Av. to W. Waterford Av. (17 working days); S. 75th St. (WT410200641), W. Van Beck Av. to W. Waterford Av. (19 working days); W. Warnimont Av. (WT410200656), S. 78th St. to S. 81st St. (17 working days); S. 95th St. (WT410200668), W. Oklahoma Av. to W. Beloit Rd. (22 working days); S. 98th St. (WT410200669), W. Oklahoma Av. to W. Beloit Rd. (37 working days). (Note: Contractor to furnish and install approximately 12,692 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/14/2021 04:30 PM UTC
OFFICIAL NOTICE 11-1-2021
CONSTRUCTION AND INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, STREET LIGHTING POLES, CONDUIT AND CABLE INSTALLATION, ELECTRICAL APPURTENANCE REMOVALS, 5” CONCRETE WALK REMOVAL AND REPLACEMENT, ETC.; Located at: TD05688016 – Historic Third Ward Pole and Fixture Installation in: East Chicago Street, North Milwaukee Street, & East Corcoran Street
01/13/2021 04:30 PM UTC
OFFICIAL NOTICE 10-1-2021
2021 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing