General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 107-1-2019
ADA UPGRADES TO FONDY MARKET AND PORT OF MILWAUKEE FONDY - 2200 W FOND DU LAC AVENUE MILWAUKEE PORT OF MILWAUKEE - 2323 S LINCOLN MEMORIAL DR MILWAUKEE
09/05/2019 03:30 PM UTC
OFFICIAL NOTICE 106-1-2019
Northwest Garage Coal and Ash Room Abandonment 3025 West Ruby Avenue Milwaukee WI 53209
08/29/2019 03:30 PM UTC
OFFICIAL NOTICE 35-1-2019
COMBINED SEWER MAIN RELAY & NEW STORM SEWER MAIN & COMBINED SEWER MAIN LINING AND MANHOLE REPAIR & LINING & PERMEABLE PAVERS IN: Located at: N. 9th St. – W. Keefe Ave. to W. Atkinson Ave. N. 10th St. – W. Chambers St. to W. Burleigh St. N. 11th St. – W. Atkinson Ave. to 160' +/- S. of W. Abert Pl. W. Atkinson Ave. – W. Keefe Av. to N. 7th St. N. Dousman St. – 150’ +/- S. of E. Keefe Ave. to E. Keefe Ave. N. Fratney St. – E. Vienna Ave. to E. Capitol Dr. W. Galena St. – N. 47th St. to N. 48th St. W. Galena St. – W/L of N. 47th St. to E/L of N. 48th St. E. Keefe Ave. – N. Humboldt Blvd. to N. Dousman St. N. Vel R. Phillips Ave. – W. Vine St. to W. Reservoir Ave.
08/28/2019 03:30 PM UTC
OFFICIAL NOTICE 35-2-2019
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING IN: S. 18th St. – W. Becher St. to W. Lincoln Ave. S. 19th St. – W. Becher St. to W. Grant St. S. 38th St. - W. Greenfield Ave. to 164'+/- South of W. Orchard St. W. Becher St. - S. 25th St. to S. 29th St. W. Grant St. – S. 18th St. to S. 20th St. S. Layton Blvd. – 200' +/- North of W. Becher St. to W. Becher St.
08/28/2019 03:30 PM UTC
OFFICIAL NOTICE 35-3-2019
SANITARY SEWER MAIN RELAY IN: S. 33rd St. - 230' N. of W. Grant St. to W. Hayes Ave. W. Lincoln Ave. – S. 32nd St. to S. 33rd St. W. Grant St. – S. 33rd St. to S. 34th St. W. Lincoln Ave. – S. 33rd St. to S. 34th St. S. 34th St. – W. Grant St. to W. Arthur Ave.
08/28/2019 03:30 PM UTC
OFFICIAL NOTICE 104-1-2019
TRANSPORTING AND RECYCLING OF WHITE GOODS CONTAINING REFRIGERANTS
08/27/2019 03:30 PM UTC
OFFICIAL NOTICE 102-1-2019
WITKOWIAK PARK RECONSTRUCTION 1648 SOUTH 4TH STREET MILWAUKEE WI 53204
08/26/2019 03:30 PM UTC
OFFICIAL NOTICE 105-1-2019
LINCOLN AVE REPAIR GARAGE HVAC SYSTEM REPLACEMENT 3921 W LINCOLN AVE MILWAUKEE WI 53215
08/23/2019 03:30 PM UTC
OFFICIAL NOTICE 88-1-2019
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” REINFORCED CONCRETE PAVEMENT, 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” TO 9” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, TRACK ZONE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: TD03784003 – N. Plankinton Ave. - Menomonee River to W. St. Paul Ave. ST212180117 – Alley Bounded By: W. Clybourn St., W. St. Paul Av., N. 28th St., & N. 29th St. RE52311225 – N. 28th St. @ W. Wells St. (Street Closure for Vacation)
08/22/2019 03:30 PM UTC
OFFICIAL NOTICE 95-1-2019
WATER MAIN RELAYS at the following locations: S. 67th St. (WT410190620), W. Fremont Pl. to W. Dakota St. (26 working days); S. 64th St. (WT410190627), W. Arthur Av. to W. Cleveland Av. (28 working days); S. Logan Av. (WT410190628), E. Howard Av. to E. Norwich St. (16 working days); S. 26th St. (WT410190639), W. Barnard Av. to 250’ S/O W. Barnard Av. (10 working days); W. Barnard Av. (WT410190641), S. 26th St. to S. 27th St. (10 working days); S. 21st St. (WT410190643), 300’ N/O W. Barnard Av. to W. Barnard Av. (11 working days); W. Barnard Av. (WT410190644), S. 20th St. to S. 21st St. (10 working days); S. 36th St. (WT410190677), W. Lakefield Dr. to W. Ruskin St. (18 working days); W. Ruskin St. (WT410190678), S. 36th St. to S. 38th St. (15 working days); S. 38th St. (WT410190679), W. Euclid Av. to W. Ruskin St. (12 working days). (Note: Contractor to furnish and install approximately 5,751 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/06/2019 03:30 PM UTC
621 - 630 of 1476 Solicitations
1 2 59 60 61 63 65 66 67 147 148