General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 8-1-2018
REHABILITATION OF THE KILBOURN TUNNELS
03/12/2018 03:30 PM UTC
OFFICIAL NOTICE 55-A-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project A: City-Owned Lot Area 2: Area bounded by North Avenue, west City limit, Capitol Drive, and North 27th Street.
03/09/2018 04:30 PM UTC
OFFICIAL NOTICE 55-B-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project B: City-Owned Lot Area 3: Area bounded by North Avenue, North 27th Street, Capitol Drive, and North 20th Street.
03/09/2018 04:30 PM UTC
OFFICIAL NOTICE 37-1-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 37-2-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W Capitol Dr and W I-94
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 37-3-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 17-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180107 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice: O.N. 11-1-2018 S. 3rd St. – W. Waterford Ave. to W. Norwich St. S. 6th St. – W. Mitchell St. to W. Greenfield Ave. S. 16th St. – W. Windlake Ave. to W. Mitchell St. W. Clayton Crest Ave. – S. 14th St. to S. 15th Pl. W. Mallory Ave. – S. 13th St. to S. 15th Pl. S. Superior St. – A point South of E. Oklahoma Ave. to E Russell Ave. W. Upham Ave. – S. 14th St. to S. 15th Pl. O.N. 12-1-2018 S. 35th St. – RR Bridge South of W. Arthur Ave. to W. Lincoln Ave. S. 35th St. – W. Lincoln Ave. to W. Rogers St. S. 43rd St. – W. Forest Home Ave. to W. Cleveland Ave. W. Cleveland Ave. – S. 60th St. to City Limits (S. 72nd St.) W. Greenfield Ave. – S. 35th St. to Union Pacific Railroad Right of Way O.N. 13-1-2018 N. 4th St. – W. Wells St. to W. Kilbourn Ave. W. Cherry St. – Milwaukee River to N. 6th St. N. Jackson St. – E. Kilbourn Ave. to E. Ogden Ave. N. Milwaukee St. – E. Clybourn St. to E. Wisconsin Ave. N. Milwaukee St. – E. Wisconsin Ave. to E. Kilbourn Ave. W. North Ave. – N. 9th St. to W. Fond du Lac Ave. E. Ogden Ave. – N. Van Buren St. to N. Jackson St. N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
03/07/2018 04:30 PM UTC
OFFICIAL NOTICE 22-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211130132 - W. Juneau Ave. - N. Old World 3rd St. to N. 6th St. (also TID-48) (TD04884042) OR (TD03984000).
03/06/2018 04:30 PM UTC
OFFICIAL NOTICE 38-1-2018
WATER MAIN RELAYS at the following locations: W. Congress St. (S/S) (WT410160682), N. 40th St. to N. 41st St. (12 working days); N. 49th St. (WT410180606), W. Congress St. to 400' N/O W. Congress St. (14 working days); N. 46th St. (WT410180607), 470' N/O W. Glendale Ave. to W. Hampton Ave. (28 working days); W. Stark St. / N. 77th St. (WT410180666), W. 76th St. to W. Hampton Ave. (27 working days); W. Constance Ave. (WT410180674), W. Fond Du Lac Ave. to W. Medford Ave. (10 working days); N. 72nd St. (WT410180676), W. Leon Tr. to W. Villard Ave. (16 working days); N. 71st St. (WT410180677), W. Lancaster Ave. to W. Villard Ave. (26 working days); N. 68th St. (WT410180678), W. Stark St. to W. Villard Ave. (55 working days). (Note: Contractor to furnish and install approximately 6,316 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/05/2018 04:30 PM UTC
OFFICIAL NOTICE 33-1-2018
CONCRETE ALLEY PAVEMENT AND WATERPROOFING ATOP THE MECHANICAL SHOP AT THE POLICE ADMINISTRATION BUILDING 951 NORTH JAMES LOVELL STREET MILWAUKEE WI
03/02/2018 04:30 PM UTC
951 - 960 of 1601 Solicitations
1 2 92 93 94 96 98 99 100 160 161