General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 97-1-2025
SANITARY SEWER MAIN RELAY AND SANITARY SEWER MAIN LINING IN: N. Lincoln Memorial Dr. – 550’ SW of the Pump Station at Bradford Beach to E. Kenwood Blvd.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 97-2-2025
COMBINED SEWER MAIN LINING IN: Vacated W. Galena St. – Vacated N. 2nd St. to N. Dr. Martin Luther King Jr. Dr.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 99-1-2025
WP-346 Linnwood Window Improvement Project
11/11/2025 04:30 PM UTC
OFFICIAL NOTICE 99-2-2025
WP-346 Cameron Window Improvement Project
11/11/2025 04:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 25-1-2017
COMBINED, SANITARY AND STORM SEWER MAIN RELAY AND COMBINED AND STORM SEWER LINING AND MANHOLE REPAIR AND LINING in: N. 2nd St. – W. Garfield Ave. to W. North Ave.; N. 9th St. – W. Center St. to W. Hadley St.; N. 21st St. – W. Wright St. – 250’+/- N. of W. Wright St.; N. 22nd St. – W. Locust St. to W. Chambers St.; N. 23rd St. – W. Michigan St. to W. Wisconsin Ave.; N. 27th St. – W. Burleigh St. to 300’ +/- N. of W. Burleigh St.; N. 27th St. – W. Auer Ave. to 100’+/- N. of W. Auer Ave.; N. 60th St. – W. Wright St. to W. Center St.; W. Henry Ave. – S. 23rd St. to S. 26th St.; W. Meinecke Ave. – N. 19th St. to N. 21st St.; W. Wright St. – N. 20th St. to N. 22nd St.
05/31/2017 03:30 PM UTC
OFFICIAL NOTICE 25-2-2017
COMBINED SEWER LINING AND MANHOLE REPAIR AND LINING Located at: N. 20th St. – W. Brown St. to 115’ +/- S. of W. Garfield Ave.
05/31/2017 03:30 PM UTC
OFFICIAL NOTICE 77-1-2017
For the hauling and recycling of residential asphalt shingles from the City of Milwaukee's Drop Off Centers.
05/30/2017 03:30 PM UTC
OFFICIAL NOTICE 26-1-2017
SEWER CLEANING AND EXAMINATION Located at: Various Locations **Attendance at a Pre-Bid meeting on Wednesday, May 17, 2017 at 10:30 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
05/26/2017 03:30 PM UTC
OFFICIAL NOTICE 51-1-2017
CHIP SEAL BITUMINOUS PAVEMENT USING AN ASPHALTIC MATERIAL WITH ¼” LIMESTONE AGGREGATE COVER CONSISTING OF A MIXTURE OF BITUMINOUS SEAL COATING WITH STONE COVER AGGREGATE SPREAD EVENLY ON THE SURFACE AS SPECIFIED AND DIRECTED AND FILL CRACKS AND FOG SEALING OF CHIP SEALED PAVEMENTS, ETC.; Located at: ST211170186 - Various Street Locations Within the City of Milwaukee
05/18/2017 03:30 PM UTC
OFFICIAL NOTICE 66-1-2017
WATER MAIN RELAYS at the following locations: N. 94th St. (WT410170626), W. Capitol Dr. to 300 Ft. N/O W. Capitol Dr. (10 working days); N. 97th St. (WT410170627), W. Sarasota Pl. to W. Fiebrantz Av. (9 working days); N. 85th St. (WT410170635), 320 Ft. S/O W. Fairmount Av. to W. Villard Av. (44 working days); W. Lancaster Av. (WT410170636), N. 85th St. to N. 87th St. (24 working days); W. Hampton Av. (S/S) (WT410170665), N. 110th St. to 540 Ft. W/O N. 110th St. (17 working days); N. Holton St. (WT410170695), E. Concordia Av. to E. Townsend St. (5 working days). (Note: Contractor to furnish and install approximately 4,093 lin. ft. of 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/12/2017 03:30 PM UTC
OFFICIAL NOTICE 62-1-2017
WATER MAIN RELAYS, in the following locations: S. 60th St. (WT410170006), W. Morgan Ave. to W. Coldspring Rd. (7 working days); S. 24th Ct. (WT410170601), W. Leroy Ave. to 210’ S/O W. Leroy Ave. (11 working days); S. 6th St. (WT410170615), W. Abbott Ave. to 120’ N/O W. Grange Ave. (65 working days); S. 39th St. (WT410170642), W. Birchwood Ave. to W. Iona Tr. (10 working days); W. Iona Tr. (WT410170643), W. Parnell Ave. to S. 39th St. (11 working days); S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 5th St. (WT410170657), 600’ N/O W. Layton Ave. to W. Layton Ave. (18 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); W. Armour Ave. (WT410170668), S. 13th St. to S. 14th St. (9 working days); S. 14th St. (WT410170669), W. Armour Ave. to 550’ S/O W. Cudahy Ave. (18 working days); S. 16th St. (WT410170670), W. Bolivar Ave. to W. Whitaker Ave. (9 working days); S. 25th St. (WT410170674), W. Henry Ave. to 210’ S/O W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days) (Note: Contractor to furnish and install approx. 7099 lin. ft. of 16”, 12”, 8”, and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
05/10/2017 03:30 PM UTC
OFFICIAL NOTICE 71-1-2017
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors (100 working days). Locations will be at various sites throughout the City of Milwaukee.
05/10/2017 03:30 PM UTC
OFFICIAL NOTICE 49-1-2017
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors (100 working days). Locations will be at various sites throughout the City of Milwaukee.
05/02/2017 03:30 PM UTC
OFFICIAL NOTICE 28-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINT AND CRACKS, 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: TD4884042 - N. 5th St. - W. Juneau Ave. to W. McKinley Ave.
05/01/2017 03:30 PM UTC
951 - 960 of 1508 Solicitations
1 2 92 93 94 96 98 99 100 150 151