General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 40-1-2018
LEAD SERVICE LINE REPLACEMENT, at 60 locations, by qualified City of Milwaukee licensed and bonded contractors. All locations will be licensed childcare facilities in the City of Milwaukee.
03/02/2018 04:30 PM UTC
OFFICIAL NOTICE 9-1-2018
EPOXY OVERLAY AT THE 6TH STREET VIADUCT AND WEST VLIET STREET OVER CPRW BRIDGES
03/01/2018 04:30 PM UTC
OFFICIAL NOTICE 13-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216180103) - Asphalt Concrete Overlays Locations: N. 4th St. – W. Wells St. to W. Kilbourn Ave., W. Cherry St. – N. 6th St. to The Milwaukee River., N. Jackson St. - E. Kilbourn Ave. to E. Ogden Ave., N. Milwaukee St. - E. Clybourn St. to E. Wisconsin Ave., W. North Ave. – N. 9th St. to W. Fond Du Lac Ave., N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
02/28/2018 04:30 PM UTC
OFFICIAL NOTICE 36-1-2018
HYDRANT ALTERATIONS & WATER MAIN RELAYS at the following locations: S. 108th St. (WT410170003), W. Beloit Rd. to W. Howard Av. (7 working days), S. 108th St. (WT410170005), W. Edgerton Av. to W. College Av. (40 working days), W. Wisconsin Av. (WT410170012), N. 20th St. to N. 38th St. (12 working days), W. Greenfield Av. (WT410170013), S. Cesar Chavez E. Dr. to S. 35th St. (38 working days), W. Oklahoma Av. (WT410170015), S. 49th St. to S. 60th St. (6 working days), E. Wells St. / W. Wells St. (WT410180009), N. Broadway to N. 6th St. (6 working days) . (Note: Contractor to furnish and install approximately 2,106 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/28/2018 04:30 PM UTC
OFFICIAL NOTICE 2-1-2018
PROJECT NO. 1: NEW STORM SEWER MAIN CONSTRUCTION in: S. 6th St. – W. Dakota St. to 180’ S. of W. Dakota St. S. 7th St. – W. Montana St. to W. Dakota St. W. Dakota St. – S. 6th St. to S. 11th St.
02/27/2018 04:30 PM UTC
OFFICIAL NOTICE 2-2-2018
COMBINED SEWER RELAY in: Alley N. of W. Highland Ave. – N. Old World Third St. to 170’ W. of N. Old World Third St.
02/27/2018 04:30 PM UTC
OFFICIAL NOTICE 2-3-2018
2018 Sanitary Manhole and Sewer Structures Inspection Project in: Various areas throughout the City
02/27/2018 04:30 PM UTC
OFFICIAL NOTICE 24-1-2018
LS-35 Coating and Appurtenance Modifications to East Ground Storage Tank at Lincoln Booster Station
02/26/2018 04:30 PM UTC
OFFICIAL NOTICE 35-1-2018
WATER MAIN RELAYS at the following locations: S. 16th St. (WT410180001), 310’ N.O W. Holmes Av. to W. Holmes Av. (11 working days); N. 73rd St. (WT410180002), W. Capitol Dr. to W. Ruby Av. (93 working days); W. Beckett Av. (WT410180003), N. 73rd St. to W. Fiebrantz Av. (16 working days); W. Fiebrantz Av. (WT410180004), N. 72nd St. to W. Beckett Av. (20 working days); W. Perkins Pl. (WT410180005), W. Beckett Av. to W. Appleton Av. (13 working days); W. Locust St. (WT410160679), N. 29th St. to W. Fond du Lac Av. (21 working days). (Note: Contractor to furnish and install approximately 6,553 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/26/2018 04:30 PM UTC
OFFICIAL NOTICE 14-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216180104) - Asphalt Concrete Overlays Locations: N. Bartlett Ave. – E. Locust St. to E. Kenwood Blvd., N. Bartlett Ave. – E. Kenwood Blvd. to E. Providence Ave., E/W Burleigh St. - N. Holton St. to N. 7th St., W. Hopkin St. - N. 27th St. to W. Capitol Dr. (Incl. N. 31st St.), N. Sherman Blvd. – W. Congress St. to W. Hampton Ave.
02/23/2018 04:30 PM UTC
961 - 970 of 1601 Solicitations
1 2 93 94 95 97 99 100 101 160 161