General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 97-1-2025
SANITARY SEWER MAIN RELAY AND SANITARY SEWER MAIN LINING IN: N. Lincoln Memorial Dr. – 550’ SW of the Pump Station at Bradford Beach to E. Kenwood Blvd.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 97-2-2025
COMBINED SEWER MAIN LINING IN: Vacated W. Galena St. – Vacated N. 2nd St. to N. Dr. Martin Luther King Jr. Dr.
11/05/2025 04:30 PM UTC
OFFICIAL NOTICE 99-1-2025
WP-346 Linnwood Window Improvement Project
11/11/2025 04:30 PM UTC
OFFICIAL NOTICE 99-2-2025
WP-346 Cameron Window Improvement Project
11/11/2025 04:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 53-1-2017
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC. Located at: ST211160118 - Various street locations within the City of Milwaukee
04/28/2017 03:30 PM UTC
OFFICIAL NOTICE 48-1-2017
2017 BYPASS PUMP REHABILITATION PROJECT
04/26/2017 03:30 PM UTC
OFFICIAL NOTICE 42-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150126 - N. 75th St. - W. Beckett Ave. to W. Congress St. ST211050125 - N. 69th St. - W. Capitol Dr. to W. Hope Ave.
04/26/2017 03:30 PM UTC
OFFICIAL NOTICE 11-1-2017
GREEN STREET BIOSWALE PROJECTS
04/25/2017 03:30 PM UTC
OFFICIAL NOTICE 37-1-2017
WATER MAIN RELAYS at the following locations: N. 62nd St. (WT410140631), W. Melvina St. to W. Capitol Dr. (23 working days); N. 68th St. (WT410140632), W. Capitol Dr. to W. Fiebrantz Ave. (27 working days); N. 67th St. (WT410140638), W. Vienna Ave. to 240’ N/O W. Melvina St. (38 working days); N. 61st St. (WT410140639), W. Melvina St. to W. Capitol Dr. (23 working days); W. Melvina St. (WT410170606), N. 69th St. to W. Appleton Ave. (27 working days); N. 70th St. (WT410170607), W. Vienna Ave. to W. Melvina St. (19 working days); W. Vienna Ave. (WT410170608), N. 66th St. to W. Appleton Ave. (40 working days); N. 52nd St. (WT410170611), W. Hampton Ave. to 300’ N/O W. Stark St. (29 working days); W. Potomac Ave. (WT410170658), N. 73rd St. to N. 74th St. (33 working days); N. 52nd St. (WT410170673), W. Congress St. to W. Lincoln Creek Dr. (18 working days) (Note: Contractor to furnish and install approximately 9,480 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/24/2017 03:30 PM UTC
OFFICIAL NOTICE 31-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, REPAIR PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150135 - N. 95th St. - W. Keefe Ave. to W. Nash St. ST211150135 - W. Nash St. - N. 95th St. to N. 96th St. ST211150132 - N. 81st St. - W. Courtland Ave./W. Beckett Ave. to W. Hampton Ave.
04/21/2017 03:30 PM UTC
OFFICIAL NOTICE 24-1-2017
PROJECT NO. 1: COMBINED SEWER SLIP LINING AND MANHOLE REPAIR AND LINING Located at: N. 26th St. – W. McKinley Ave. to 50’ N. of W. Cherry St.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 24-2-2017
PROJECT NO. 2: COMBINED SEWER MAIN RELAY AND SANITARY, COMBINED, AND STORM SEWER LINING AND MANHOLE REPAIR AND LINING Located at: S. 24th St. - W. Tripoli Ave. to W. Howard Ave. S. Layton Blvd./S. 27th St. - W. Grant St. to 206'+/- North of W. Harrison Ave. S. 53rd St. - W. Ohio Ave. to W. Nebraska Ave. S. 82nd St. - W. Holt Ave. to W. Morgan Ave. S. Layton Blvd. - W. Pierce St. to W. National Ave. S. Layton Blvd. - 200' N. of W. Evergreen Ln. to W. Evergreen Ln. S. Vermont Ave. - E. Oklahoma Ave. to E. Rhode Island Ave. S. Wentworth Ave. - E. Texas Ave. to E. Oklahoma Ave.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 43-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS ( 6”, 7”, & 8”) CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: ST211150162 - S. 85th St. - W. Morgan Ave. to W. Holt Ave. ST211150110 - S. 82nd St. - W. Morgan Ave. to W. Holt Ave.
04/18/2017 03:30 PM UTC
OFFICIAL NOTICE 41-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211070101 - N. 63rd St. - W. Nash St. to a pt. 450' n/o W. Nash St. ST211070102 - N. 64th St. - W. Nash St. to a pt. n/o W. Nash St. ST211080104 - W. Nash St. - N. 62nd St. to a pt. 150' w/o of N. 64th St.
04/17/2017 03:30 PM UTC
961 - 970 of 1508 Solicitations
1 2 93 94 95 97 99 100 101 150 151