General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 19-1-2017
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216160110 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2017 High Impact Paving Projects
03/08/2017 04:30 PM UTC
OFFICIAL NOTICE 17-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 17-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171107) - Asphalt Overlays located at: N. 27th St. - W. Center St. to W. Townsend St., W. Atkinson Ave. - N. 27th St. to N. 32nd St., W. Cameron Ave. - N. 32nd St. to N. 35th St., W. Keefe Ave. - N. Sherman Blvd. to N. 51st St., E. Kenwood Blvd. - N. Lake Dr. to N. Downer Ave., N. Shepard Ave. - E. Kenwood. Blvd. to E. Hartford Ave., W. Wells St. - N. 16th St. to N. 27th St.
03/07/2017 04:30 PM UTC
OFFICIAL NOTICE 44-1-2017
WATER MAIN RELAYS in the following locations: S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days) (Note: Contractor to furnish and install approx. 3004 lin. ft. of 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
03/06/2017 04:30 PM UTC
OFFICIAL NOTICE 12-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 12-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 35-1-2017
2017 BIO-RETENTION FACILITY MAINTENANCE - NORTH
03/02/2017 04:30 PM UTC
OFFICIAL NOTICE 35-2-2017
2017 BIO-RETENTION FACILITY MAINTENANCE - SOUTH
03/02/2017 04:30 PM UTC
OFFICIAL NOTICE 14-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170104) - Asphalt Overlays located at: E. Chicago St. - N. Jackson St. to N. Milwaukee St., E. Chicago St. - N. Milwaukee St. to W. Water St., N. Harbor St. - E. Summerfest Pl. to s/o E. Chicago St., S. Kinnickinnic Ave - W. Lincoln Ave. to W. Lapham St., N. Water St. - E. Kilbourn Ave. to N. Van Buren St.
03/01/2017 04:30 PM UTC
OFFICIAL NOTICE 14-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171104) - Asphalt Overlays located at: E. Chicago St. - N. Jackson St. to N. Milwaukee St., E. Chicago St. - N. Milwaukee St. to W. Water St., N. Harbor St. - E. Summerfest Pl. to s/o E. Chicago St., S. Kinnickinnic Ave - W. Lincoln Ave. to W. Lapham St., N. Water St. - E. Kilbourn Ave. to N. Van Buren St.
03/01/2017 04:30 PM UTC
961 - 970 of 1476 Solicitations
1 2 93 94 95 97 99 100 101 147 148