General Info

Business Logo

City of Piqua

201 W Water St Purchasing Department, Piqua, OH 45356-2235
(937) 778-3176

The City of Piqua Development Department is responsible for overseeing the planning, design, construction, inspection, and administration of public works improvement projects as well as the review and inspection of private development projects.

The Development Department’s goal is to act on behalf of the citizens of Piqua by overseeing all of the public works improvement projects to ensure the high level of quality service that the citizens of Piqua have come to expect from the City’s infrastructure and public facilities.

Standard Documents

Name * Description
Bid Form Acknowledgement.pdf (15.6 KB)
Bidder Required to Acknowledge
Bid Bond Form (Rev 2020).pdf (111 KB)
Bid Guaranty Bond Form
Business Tax Registration Form 48.pdf (379 KB)
Income-Tax-Questionnaire RITA FORM 48
W9 Blank FORM 2024.pdf (138 KB)
New Vendor form to be completed and uploaded
C700 General Conditions 2018. FINAL.pdf (635 KB)
SAMPLE to be included in the contract
C800-Supplementary-Conditions-2018 PIQUA 04.05.2023. pdf.pdf (418 KB)
SAMPLE to be included in the contract
Electronic bidding information Rev April 2025.pdf (75.5 KB)
Instructions to Bidders for Electronic Bidding
PrevailingWages_09102025 All.pdf (369 KB)
Ohio Prevailing Wage Rates (subject to updates)
8 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
IFB 2610
CITY OF PIQUA OHIO - Demolition Project IFB 2610 ESTIMATE: $190,000 In general, the work consists of the demolition of 204 & 206 N. Wayne Street, the incidental surface pavements and structures to ready the site for redevelopment. State of Ohio Prevailing Wages are required. The final completion date is September 30, 2026
05/05/2026 02:00 PM UTC
26-02
CITY OF PIQUA OHIO - PAVEMENT PROGRAM – MILL AND OVERLAY PROJECT #26-02 ENGINEER’S ESTIMATE: $1,484,000 In general, the work consists of the planning of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city. State of Ohio Prevailing Wages are required. The final completion date is October 31, 2026.
04/29/2026 02:00 PM UTC
26-01
CITY OF PIQUA OHIO - ADA CURB RAMP PROGRAM PROJECT #26-01 ENGINEER’S ESTIMATE: $402,000 In general, the work consists of the replacement of catch basins and the installation of concrete curbing, drive approaches, sidewalk, and truncated domes at radii and other miscellaneous locations along the streets having pavement work completed. State of Ohio Prevailing Wages are required. The final completion date is July 31, 2026.
04/29/2026 02:00 PM UTC
2026 City of Piqua Comprehensive Plan Update/Replacement
The City of Piqua, Ohio (“City”) is soliciting Statements of Qualifications from qualified planning consultants or firms for the update/replacement of the City’s Comprehensive Plan. The current plan, Plan It Piqua (2007), serves as the long-range planning document for the community and will be replaced through this project with a modern, implementable plan to guide development through the year 2040. The RFQ documentation may be viewed or downloaded from the City of Piqua website piquaoh.gov or here on BidExpress. Interested firms shall submit a complete qualifications package electronically following the naming and submission requirements outlined in the RFQ. Submittal Deadline: 4:00 PM EST, Friday, March 27, 2026 Late submissions will not be accepted. All questions must be submitted in writing via email to the City no later than March 13, 2026. Written responses will be provided via addendum and posted by March 20, 2026. Only written addenda issued by the City shall be considered binding. Proposals will be evaluated based on relevant experience, methodology, qualifications of key personnel, and strength of references, as detailed in the RFQ’s Selection Criteria section. The City reserves the right to reject any or all submissions, waive irregularities, and negotiate with the highest-ranked firm in the best interest of the City. The anticipated project start date is Spring 2026, with an 18 month completion timeline extending through December 2027. Chad Henry, City Planner City of Piqua 201 W. Water St. Piqua, OH 45356 email: chenry@piquaoh.gov Responses received after 4:00 PM on the response due date will not be considered.
03/27/2026 08:00 PM UTC
24-17.1
CITY OF PIQUA OHIO - WASHINGTON ROAD WATER MAIN EXTENSION - PROJECT #24-17.1 ENGINEER’S ESTIMATE: $2,644,400 In general, the work consists of installing a 16” new water main from Arrowhead Drive to Bausman Road on Washington Road. This project will include installation of water services, main, valves and hydrants along the 6,300 foot extension. A Prebid conference will be held on Thursday, February 5, 2026, 1:00 p.m. at 201 W. Water Street, Piqua, Oh 45356. State of Ohio Prevailing Wages are required. The final completion date is August 19, 2026.
02/19/2026 07:00 PM UTC
RFP 2525
The City of Piqua, Ohio is seeking sealed proposals from a qualified firm or contractor for the installation of residential water meters. Proposals will be received by the City of Piqua, 201 West Water Street, Piqua, Ohio, until 2:00 P.M., on Wednesday, September 24, 2025 at which time the proposals will be publicly opened. The Request for Proposal Document may be obtained at the City of Piqua Purchasing Department, 201 W. Water Street, Piqua, Ohio at no cost. You can also download a copy from our website www.piquaoh.gov or www.bidexpress.com . Proposals must be signed and submitted to the City in a sealed envelope and must be marked “RFP #2525 – Water Meter Replacement .” Each Proposal must contain the full name of the party or parties submitting the Proposal and all persons interested therein. Prevailing wages will apply to this work. No Proposer shall withdraw their Proposal after the actual opening thereof. The City reserves the right to reject any or all Proposals, waive irregularities in any Proposal, and to accept any Proposal that is deemed by City to be in the best interests of the City. Janelle Collier Contract and Purchasing Manager City of Piqua, Ohio Resolution No.: R-139-24
09/24/2025 06:00 PM UTC
IFB 2514-2518
CITY OF PIQUA OHIO - Demolition Projects IFB 2514-2518 ESTIMATE: $115,000 In general, the work consists of five (5) Demolition Projects located at 218 Cleveland Street, 317 Virginia Street, 420 S Downing Street, 815 Vine Street, & 1044 Caldwell Street. The purpose of these projects are to demolish the existing building and incidental improvements to ready the site for redevelopment. State of Ohio Prevailing Wages are required. The final completion date is September 30, 2025.
06/16/2025 06:00 PM UTC
25-02
CITY OF PIQUA, OHIO - PAVEMENT PROGRAM – MILL AND OVERLAY PROJECT 25-02 ENGINEER’S ESTIMATE: $1,210,000 (Base Bid) In general, the work consists of the planning of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city. State of Ohio Prevailing Wages are required. The final completion date is November 12, 2025.
05/22/2025 02:00 PM UTC
25-01
CITY OF PIQUA OHIO - ADA CURB RAMP PROGRAM PROJECT #25-01 ENGINEER’S ESTIMATE: $405,000 In general, the work consists of the replacement of catch basins and the installation of concrete curbing, drive approaches, sidewalk, and truncated domes at radii and other miscellaneous locations along the streets having pavement work completed. State of Ohio Prevailing Wages are required. The final completion date is August 22, 2025.
05/15/2025 02:00 PM UTC
23-07
CITY OF PIQUA OHIO - ROBINSON TO MAPLE ALLEY SANITARY SEWER REPLACEMENT PROJECT #23-07 ENGINEER’S ESTIMATE: $406,000 The project generally consists of replacing sanitary main and laterals throughout an alley. Additional work in other locations consist of replacing manholes and installing new storm main. State Prevailing Wages may apply.
05/16/2024 02:00 PM UTC
1 - 10 of 82 Solicitations
← Previous 1 3 4 5 6 7 8 9