General Info

Business Logo

City of Piqua

201 W Water St Purchasing Department, Piqua, OH 45356-2235
(937) 778-3176

The City of Piqua Development Department is responsible for overseeing the planning, design, construction, inspection, and administration of public works improvement projects as well as the review and inspection of private development projects.

The Development Department’s goal is to act on behalf of the citizens of Piqua by overseeing all of the public works improvement projects to ensure the high level of quality service that the citizens of Piqua have come to expect from the City’s infrastructure and public facilities.

Standard Documents

Name * Description
Bid Form Acknowledgement.pdf (15.6 KB)
Bidder Required to Acknowledge
Bid Bond Form (Rev 2020).pdf (111 KB)
Bid Guaranty Bond Form
Business Tax Registration Form 48.pdf (379 KB)
Income-Tax-Questionnaire RITA FORM 48
W9 Blank FORM 2024.pdf (138 KB)
New Vendor form to be completed and uploaded
C700 General Conditions 2018. FINAL.pdf (635 KB)
SAMPLE to be included in the contract
C800-Supplementary-Conditions-2018 PIQUA 04.05.2023. pdf.pdf (418 KB)
SAMPLE to be included in the contract
Electronic bidding information Rev April 2025.pdf (75.5 KB)
Instructions to Bidders for Electronic Bidding
PrevailingWages_09102025 All.pdf (369 KB)
Ohio Prevailing Wage Rates (subject to updates)
8 Documents

Upcoming Solicitations

Number Deadline
2026 City of Piqua Comprehensive Plan Update/Replacement
The City of Piqua, Ohio (“City”) is soliciting Statements of Qualifications from qualified planning consultants or firms for the update/replacement of the City’s Comprehensive Plan. The current plan, Plan It Piqua (2007), serves as the long-range planning document for the community and will be replaced through this project with a modern, implementable plan to guide development through the year 2040. The RFQ documentation may be viewed or downloaded from the City of Piqua website piquaoh.gov or here on BidExpress. Interested firms shall submit a complete qualifications package electronically following the naming and submission requirements outlined in the RFQ. Submittal Deadline: 4:00 PM EST, Friday, March 27, 2026 Late submissions will not be accepted. All questions must be submitted in writing via email to the City no later than March 13, 2026. Written responses will be provided via addendum and posted by March 20, 2026. Only written addenda issued by the City shall be considered binding. Proposals will be evaluated based on relevant experience, methodology, qualifications of key personnel, and strength of references, as detailed in the RFQ’s Selection Criteria section. The City reserves the right to reject any or all submissions, waive irregularities, and negotiate with the highest-ranked firm in the best interest of the City. The anticipated project start date is Spring 2026, with an 18 month completion timeline extending through December 2027. Chad Henry, City Planner City of Piqua 201 W. Water St. Piqua, OH 45356 email: chenry@piquaoh.gov Responses received after 4:00 PM on the response due date will not be considered.
03/27/2026 08:00 PM UTC
IFB 2610
CITY OF PIQUA OHIO - Demolition Project IFB 2610 ESTIMATE: $190,000 In general, the work consists of the demolition of 204 & 206 N. Wayne Street, the incidental surface pavements and structures to ready the site for redevelopment. State of Ohio Prevailing Wages are required. The final completion date is September 30, 2026
04/06/2026 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
14-01 Street Resurfacing Program
CITY OF PIQUA, OHIO - 14-01 Street Resurfacing Program. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
07/01/2014 02:00 PM UTC
14-02 Sidewalk ADA Compliance Program
Project Number: 14-02 Sidewalk ADA Compliance Program - In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced. Final completion date September 30, 2014
06/03/2014 02:00 PM UTC
CITY OF PIQUA - CR 25A Pavement Marking Project 13-17
CITY OF PIQUA - CR 25A Pavement Marking Project 13-17. In general, the Work consists of the removal of existing pavement markings and the installation of new pavement markings. The City requires that this project be thoroughly coordinated and completed within 24 hours of the completion of the pavement marking portion of the MIA-CR25A-14.87, PID 95643 project in the City of Piqua.
04/25/2014 02:00 PM UTC
13-02 CR 25-A Resurfacing
CITY OF PIQUA - STREET RESURFACING PROJECT. MIA-CR 25A-14.87, PID 95643. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, catch basin repairs/replacements, placement of an asphalt surface course and pavement markings, and the installation of ADA compliant handicap ramps at all of the intersections within the paving limits.
04/22/2014 02:00 PM UTC
13-12 FISHER, ELLERMAN, GRANT, & DOWNING
CITY OF PIQUA - FISHER, ELLERMAN, GRANT, & DOWNING WATER DISTRIBUTION IMPROVEMENTS. In general, the Work consists of the installation of approximately 1400 LF of 8” ductile iron pipe, misc. appurtances, and 22 1” water services.
08/26/2013 02:00 PM UTC
13-07 Fountain Park Bridge Rehab
CITY OF PIQUA - FOUNTAIN PARK BRIDGE REHAB. In general, the Work consists of the raising of the existing Fountain Park pedestrian bridge superstructure, the removal and replacement of the existing concrete at the abutments and pier, and the repainting of the entire bridge after the bridge construction is complete
08/08/2013 02:00 PM UTC
13-01
CITY OF PIQUA - STREET RESURFACING PROGRAM In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
07/03/2013 02:00 PM UTC
13-09
CITY OF PIQUA - SIDEWALK ADA COMPLIANCE PROJECT In general, the Work consists of the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
06/07/2013 02:00 PM UTC
71 - 78 of 78 Solicitations
1 2 3 4 5 6 8 Next →