General Info

Business Logo

Ohio Department of Rehabilitation and Correction

4545 Fisher Rd, Columbus, OH 43228-8923
(614) 971-9347

Mission: Reduce Recidivism Among Those We Touch

Standard Documents

Name * Description
f110-06-equalemploymentopportunityrequirements.docx (28.6 KB)
Equal Employment Opportunity Requirements Form
m140-00_45_39-edge_affidavit_fillable.pdf (31.7 KB)
EDGE Affidavit
m140-00_45_13-bidders_qualifications.pdf (13.9 KB)
Bidder’s Qualifications
m140-00_43_13-bid_security_form.pdf (28.8 KB)
Bid Security Form
supplier_new.pdf (311 KB)
Supplier Information Form - New Supplier
irs_w-9.pdf (117 KB)
Request for Taxpayer Identification Number and Certification
eft_payment_authorization.pdf (584 KB)
Authorization Agreement for Direct Deposit of EFT Payments
m160-00_21_13.ebv0713-instructionstobidders.pdf (75.5 KB)
General Contracting Instructions to Bidders
m160-00_10_00.ebv0713-solicitation.docx (63.3 KB)
General Contracting Solicitation template
ohio_revised_code_section_153.08.pdf (33.3 KB)
Statute permitting electronic bidding in Ohio
ohio_administrative_code_section_153.1-8-01.pdf (37.2 KB)
Administrative rule on electronic bidding in Ohi
m299-03v0313-publicbidadvertisement-ebid.docx (27 KB)
Public Bid Advertisement template
12 Documents

Upcoming Solicitations

Number Deadline
DRC-25L427
DRC-25L427 - SOCF Shower & Interior Door Improvements Ohio Department of Rehabilitation & Correction Southern Ohio Correctional Facility 1724 SR 728 Lucasville, Ohio 45648 Scioto County
10/23/2025 02:00 PM UTC
DRC-24L015
DRC-24L015 - Northeast Reintegration Center (NERC) Perimeter Protection Ohio Department of Rehabilitation and Correction 2675 East 30th Street, Cleveland, Ohio 44115, Cuyahoga Co. The NERC Perimeter Protection Project includes the demolition of the existing perimeter retaining wall in the guest parking lot, demolition of the top course of asphalt of the guest parking lot, installation of a new top course of asphalt and the installation of a new retaining wall, sidewalk with bollards and landscaping. Inside the institution, the project also includes the construction of an outdoor volleyball/pickle ball court, hardscape for a therapy court between the existing Infirmary building and the Infirmary addition under construction, demolition of an existing walkway and construction of a replacement and new walkway.
10/23/2025 02:00 PM UTC
DRC-24L023
CTA AT Building Roof Replacement Corrections Training Academy 11781 St. Rt. 762 Orient, Ohio 43146 Work includes replacement of the roof with EPDM, through-wall masonry flashing replacement, joint sealant, metal wall panels, and lighting protection.
10/30/2025 02:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
DRC-16L079 ORW Macerator Drainage Improvements
DRC-16L079 ORW Macerator Drainage Improvements
03/19/2018 04:00 PM UTC
DRC-18L002 NEPRC
DRC-18L002NEPRC – Replacement of existing exterior and interior doors including but not limited to door slab, hinges, hardware, frame, security lite, half lite, DPS button style, louver, panic bar & kick plate. Installation of a premanufactured weapons/guard shack, including but not limited to the installation of the weapons/guard shack foundation, concrete walk area, data & power. LorCI – Removal and replacement of existing door hinges throughout the facility.
03/16/2018 07:00 PM UTC
DRC-17L189 FMC Sallyport Renovation
DRC-17L189 Replace Zone A sally port gates including the following scope: Remove two "J" Locking Systems. Reuse existing support posts and existing support posts and concrete grade beams. Furnish and install 5" locking column to accommodate new system installation. Furnish and install new gate panels with welded wire non climb mesh. PLUSS Vs-A system complete with overhead beam, locking column, chain tube, motor box and gate panel with non-climb fabric. Remove and reinstall razor wire on top of overhead beams as required. Equip with maintenance brushes for bird control. Reuse the existing underground electrical wiring. Contract will include staff training for new fence operation.
03/16/2018 06:00 PM UTC
DRC-17L172 AOCI Cooler/Freezer Replacement
DRC-17L172:AOCI Cooler/Freezer Replacement
03/15/2018 04:00 PM UTC
DRC-17L105 TCI Exterior Door
Project DRC-17L105 TCI Exterior Door Replacement includes refurbishment and replacement of existing doors, frames, and hardware in various locations throughout the complex. Alternates include additional refurbishments and replacements, alternate materials, and alternate installation details.
03/12/2018 07:00 PM UTC
DRC-18L015
DRC-18L015: Corrections Training Academy HVAC Renovations/Replacement for Outdoor Walk-in Cooler Replacement
02/26/2018 04:00 PM UTC
DRC-17L077 FMC
DRC-17L077 ODRC Franklin Medical Center Hood Vent Cooler Freezer.
02/23/2018 07:00 PM UTC
DRC-17L199
DRC-17L119 DCI: Replace mechanical equipment (condensers and evaporators) for the kitchen freezers and coolers. - New equipment to have controls compatible with existing building automation system (BAS) and to be connected to current BAS
02/21/2018 04:00 PM UTC
DRC-17L117
Project # DRC-17L117 Corrections Training Academy AHU-5 & VAV Boxes and DDC Controls---AT Building+ Alternate #1 HVAC for Parkview Building Room #13
02/21/2018 04:00 PM UTC
DRC-17L024
DRC-17L024: AOCI Electrical Renovations
02/15/2018 05:00 PM UTC
211 - 220 of 238 Solicitations
1 2 16 17 18 19 20 22 24