General Info

Business Logo

Ohio Department of Rehabilitation and Correction

4545 Fisher Rd, Columbus, OH 43228-8923
(614) 971-9347

Mission: Reduce Recidivism Among Those We Touch

Standard Documents

Name * Description
f110-06-equalemploymentopportunityrequirements.docx (28.6 KB)
Equal Employment Opportunity Requirements Form
m140-00_45_39-edge_affidavit_fillable.pdf (31.7 KB)
EDGE Affidavit
m140-00_45_13-bidders_qualifications.pdf (13.9 KB)
Bidder’s Qualifications
m140-00_43_13-bid_security_form.pdf (28.8 KB)
Bid Security Form
supplier_new.pdf (311 KB)
Supplier Information Form - New Supplier
irs_w-9.pdf (117 KB)
Request for Taxpayer Identification Number and Certification
eft_payment_authorization.pdf (584 KB)
Authorization Agreement for Direct Deposit of EFT Payments
m160-00_21_13.ebv0713-instructionstobidders.pdf (75.5 KB)
General Contracting Instructions to Bidders
m160-00_10_00.ebv0713-solicitation.docx (63.3 KB)
General Contracting Solicitation template
ohio_revised_code_section_153.08.pdf (33.3 KB)
Statute permitting electronic bidding in Ohio
ohio_administrative_code_section_153.1-8-01.pdf (37.2 KB)
Administrative rule on electronic bidding in Ohi
m299-03v0313-publicbidadvertisement-ebid.docx (27 KB)
Public Bid Advertisement template
12 Documents

Upcoming Solicitations

Number Deadline
DRC-25L207
LorCI Separation Fence & Server Room HVAC 2075 South Avon Beldon Rd, Grafton, OH 44704 Lorain Co. Pre-Bid Meeting: 06/18/2025 @ 10 AM on site
07/02/2025 02:00 PM UTC
DRC-23L075-02-01
NCI Sally Port Noble Correctional Institution 15708 McConnelsville Rd, Caldwell, OH 43724 Replacement of northern vehicle gate, crash barrier, fence line and pedestrian gate from the Sally Port into the facility. Alternate #01 – Demolition of the original southern vehicle gate, crash barrier, fence line and pedestrian gate once the northern gate is operational.
07/08/2025 02:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
DRC-17L171 AOCI Sallyport Renovation
AOCI Sallyport RenovationProvide and install two (2) new detention grade crash gates, and new automatic, no climb, sliding gate systems for interior and exterior gates of drive thru sally port. Replace and relocate control box. This project will require temporary security fencing while work is taking place. All work and temporary provisions will be coordinated with the institution.
03/23/2018 05:00 PM UTC
DRC-17L024: AOCI Electrical Renovations
DRC-17L024: AOCI Electrical Renovations
03/22/2018 04:00 PM UTC
DRC-16L164 SOCF Sallyport Replacement
DRC-16L164 Sallyport Replacement Southern Ohio Correctional Facility Sallyport Replacement Ohio Department of Rehabilitation and Correction 1724 State Route 728 Lucasville, Ohio, Scioto County
03/22/2018 01:00 PM UTC
DRC-18L007 MCI Freezer/Cooler Renovation
DRC-18L007 MCI Freezer/Cooler Renovation
03/21/2018 04:00 PM UTC
DRC-17L123 SCC Roof Replacement
SCC – Roof Replacement – Southeastern Correctional Complex The Project consists of reroofing approximately 37,972-square-feet of low slope roofing.
03/20/2018 06:00 PM UTC
DRC-17L122 SCC Laundry
DRC-17L122 SCC Laundry: The Project consists of altering a portion of existing Quartermaster storage space in an existing multi-function building inside a correctional facility into facility laundry and other Work indicated in the Contract Documents
03/20/2018 04:00 PM UTC
DRC-16L079 ORW Macerator Drainage Improvements
DRC-16L079 ORW Macerator Drainage Improvements
03/19/2018 04:00 PM UTC
DRC-18L002 NEPRC
DRC-18L002NEPRC – Replacement of existing exterior and interior doors including but not limited to door slab, hinges, hardware, frame, security lite, half lite, DPS button style, louver, panic bar & kick plate. Installation of a premanufactured weapons/guard shack, including but not limited to the installation of the weapons/guard shack foundation, concrete walk area, data & power. LorCI – Removal and replacement of existing door hinges throughout the facility.
03/16/2018 07:00 PM UTC
DRC-17L189 FMC Sallyport Renovation
DRC-17L189 Replace Zone A sally port gates including the following scope: Remove two "J" Locking Systems. Reuse existing support posts and existing support posts and concrete grade beams. Furnish and install 5" locking column to accommodate new system installation. Furnish and install new gate panels with welded wire non climb mesh. PLUSS Vs-A system complete with overhead beam, locking column, chain tube, motor box and gate panel with non-climb fabric. Remove and reinstall razor wire on top of overhead beams as required. Equip with maintenance brushes for bird control. Reuse the existing underground electrical wiring. Contract will include staff training for new fence operation.
03/16/2018 06:00 PM UTC
DRC-17L172 AOCI Cooler/Freezer Replacement
DRC-17L172:AOCI Cooler/Freezer Replacement
03/15/2018 04:00 PM UTC
201 - 210 of 234 Solicitations
1 2 16 17 18 19 21 23 24