General Info

Business Logo

Ohio Department of Rehabilitation and Correction

4545 Fisher Rd, Columbus, OH 43228-8923
(614) 971-9347

Mission: Reduce Recidivism Among Those We Touch

Standard Documents

Name * Description
f110-06-equalemploymentopportunityrequirements.docx (28.6 KB)
Equal Employment Opportunity Requirements Form
m140-00_45_39-edge_affidavit_fillable.pdf (31.7 KB)
EDGE Affidavit
m140-00_45_13-bidders_qualifications.pdf (13.9 KB)
Bidder’s Qualifications
m140-00_43_13-bid_security_form.pdf (28.8 KB)
Bid Security Form
supplier_new.pdf (311 KB)
Supplier Information Form - New Supplier
irs_w-9.pdf (117 KB)
Request for Taxpayer Identification Number and Certification
eft_payment_authorization.pdf (584 KB)
Authorization Agreement for Direct Deposit of EFT Payments
m160-00_21_13.ebv0713-instructionstobidders.pdf (75.5 KB)
General Contracting Instructions to Bidders
m160-00_10_00.ebv0713-solicitation.docx (63.3 KB)
General Contracting Solicitation template
ohio_revised_code_section_153.08.pdf (33.3 KB)
Statute permitting electronic bidding in Ohio
ohio_administrative_code_section_153.1-8-01.pdf (37.2 KB)
Administrative rule on electronic bidding in Ohi
m299-03v0313-publicbidadvertisement-ebid.docx (27 KB)
Public Bid Advertisement template
12 Documents

Upcoming Solicitations

Number Deadline
DRC-25L427
DRC-25L427 - SOCF Shower & Interior Door Improvements Ohio Department of Rehabilitation & Correction Southern Ohio Correctional Facility 1724 SR 728 Lucasville, Ohio 45648 Scioto County
10/23/2025 02:00 PM UTC
DRC-24L015
DRC-24L015 - Northeast Reintegration Center (NERC) Perimeter Protection Ohio Department of Rehabilitation and Correction 2675 East 30th Street, Cleveland, Ohio 44115, Cuyahoga Co. The NERC Perimeter Protection Project includes the demolition of the existing perimeter retaining wall in the guest parking lot, demolition of the top course of asphalt of the guest parking lot, installation of a new top course of asphalt and the installation of a new retaining wall, sidewalk with bollards and landscaping. Inside the institution, the project also includes the construction of an outdoor volleyball/pickle ball court, hardscape for a therapy court between the existing Infirmary building and the Infirmary addition under construction, demolition of an existing walkway and construction of a replacement and new walkway.
10/23/2025 02:00 PM UTC
DRC-24L023
CTA AT Building Roof Replacement Corrections Training Academy 11781 St. Rt. 762 Orient, Ohio 43146 Work includes replacement of the roof with EPDM, through-wall masonry flashing replacement, joint sealant, metal wall panels, and lighting protection.
10/30/2025 02:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
DRC-15L115: NCI Exterior Stair Replacement at Housing Units
DRC-15L115: NCI Exterior Stair Replacement at Housing Units
04/09/2018 01:00 PM UTC
RE-BID: DRC-17L092 Inmate Housing Domestic Hot Water Boiler Replacement
RE-BID:DRC-17L092 Inmate Housing Domestic Hot Water Boiler Replacement
04/06/2018 07:00 PM UTC
DRC-16L026: LECI UNIT MANAGEMENT OFFICE UPGRADE
Unit Office Blocks: Work will include constructing new walls in each “block” area and painting all new and existing walls and ceilings. Plus new ductwork and air handling units for the Blocks.
04/06/2018 04:00 PM UTC
DRC-18L011 CRC SWITCHGEAR UPGRADE TRANSFORMER
DRC-18L011: CRC Switchgear Upgrade Transformer, LED lights, New Conc Pad at 2 locations, etc.
04/03/2018 02:00 PM UTC
RE-BID DRC-18L002 NEPRC
DRC-18L002NEPRC – Replacement of existing exterior and interior doors including but not limited to door slab, hinges, hardware, frame, security lite, half lite, DPS button style, louver, panic bar & kick plate. Installation of a premanufactured weapons/guard shack, including but not limited to the installation of the weapons/guard shack foundation, concrete walk area, data & power. LorCI – Removal and replacement of existing door hinges throughout the facility.
04/02/2018 07:00 PM UTC
DRC-18L022 CTA Plumbing / Piping project
The existing domestic hot water, cold water and the heating hot water lines are leaking. The leaks are attributed to old gate valves, bad unions, automatic air vents, strainers, and certain bad fittings. The VAV boxes in Parkview are to be replaced with new control valves, piping kits, but the existing DDC controls are to be re-used.
03/29/2018 03:00 PM UTC
DRC-17L079 MCI Camp Renovation
DRC-17L079 MCI Camp Renovation
03/28/2018 04:00 PM UTC
DRC-17L185 Bennett Cooper Door Replacement
DRC-17L185 Bennett Cooper Door Replacement
03/27/2018 06:00 PM UTC
DRC-17L184 Bennett Cooper HVAC Upgrade
DRC-17L184 Bennett Cooper HVAC Upgrade
03/27/2018 06:00 PM UTC
DRC-17L120 DCI Switchgear
DRC-17L120 Dayton Correctional Institute Switchgear
03/27/2018 06:00 PM UTC
191 - 200 of 238 Solicitations
1 2 16 17 18 20 22 23 24