General Info

Business Logo

City of Delaware, Ohio

1 S. Sandusky St., Delaware, OH 43015
(740) 203-1811

Please see Notice to Bidders for each solicitation to find contact information specific to a project.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-14 Merrick Blvd Extension Phase 1
The project work involves the extension of Merrick Blvd as a boulevard section for approximately 0.39 miles from Cambridge Road to Troy Road, including the reconstruction of 0.50 miles of Troy Road and construction of a single lane roundabout. The improvements also include full depth pavement, curb and gutter, concrete median, straight curb, sidewalk, multi-use path, drives, storm sewer, water works, traffic control, landscaping and roadway lighting.
12/18/2025 08:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
20-21 Chemicals for the Water and Wastewater Treatment Plants
The purchase of Chemicals for the Water and Wastewater Treatment Plants. All chemicals delivered Free on Board (F.O.B.) and unloaded at the Delaware Water Treatment Facility (3080 U.S. Route 23 North) or the Upper Olentangy Water Reclamation Center (225 Cherry St. Delaware, Ohio 43015).
11/01/2021 03:00 PM UTC
19-21 Bernard Avenue Phase 2 Drainage Improvements
Construction of approximately 1,807 L.F. of Storm sewer (ranging from 42”-12” in diameter) and 334 L.F. of Sanitary sewer (8” diameter). The project starts at an alley right off Sandusky St then crosses Franklin St and Washington St before proceeding to end at the junction of Liberty St and Bernard Avenue.
10/14/2021 03:00 PM UTC
18-21 US 23 Pavement Repairs
The Work for this project consists of 6-inch depth pavement repairs on US 23 within the City of Delaware between Olentangy Avenue and North Sandusky Street. The date for Substantial Completion is November 20, 2021. A Notice to Proceed is expected to be issued on approximately October 25, 2021.
09/30/2021 03:00 PM UTC
15-21 PENNSYLVANIA AVENUE WATER MAIN REPLACEMENT
Replacement of approximately 3,205 L.F. of City of Delaware water main along Pennsylvania Avenue. The water main will be 8” and will start at Euclid Avenue and end at North Sandusky street.
09/30/2021 03:00 PM UTC
17-21 2021 Sidewalk Maintenance Program
The Base Bid project includes the removal and replacement of existing concrete sidewalks, curb ramps, and curbs at various locations on E. Heffner St., N. Union St., Cottswold Dr., and Somerset Rd. The Base Bid contract time will be 45 days to Substantial Completion. An Add Alternate includes on-call sidewalk and curb repair services for the remainder of calendar year 2021.
09/28/2021 03:00 PM UTC
12-21 WESLEYAN WOODS SEWER REHABILITAION
Sanitary sewer improvements for Wesleyan Woods Sewer area. The scope of work includes the lining of existing sanitary sewer main with Cure in place pipe (CIPP). Sewer pipe preparation including light cleaning, cementitious grouting, trimming of protruding service laterals, and such other preparatory work as specified within the supplemental speciation of the contract. Also, lateral reinstatement, manhole rehabilitation, sewer videotaping and inspection, bypass pumping; and such other work as necessary to meet all contract requirements. The project has an expected duration of about 60 days.
08/03/2021 03:00 PM UTC
11-21 DEL-US36-7.87, PID 105799 Citywide Signals Upgrade Project - City of Delaware
Signal System Upgrade covering signalized intersections along Sandusky Street from Belle Avenue to Central Avenue (SR-37), William Street (US-36) from US-23 to Lehner Woods Boulevard, Central Avenue (SR-37) from US-23 to Warrensburg Road and London Road within the City of Delaware. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at https://odot.formstack.com/forms/dbe_copy . See LPA DBE Process document in the attachment list for more details and instructions.
07/23/2021 03:00 PM UTC
13-21 Central Avenue Path Pedestrian Connections
The Project will include the addition of pedestrian crossings of West Central Avenue (SR 37) at Lexington Blvd. and Chatham Lane. Work will include concrete sidewalk, curb ramps, pedestrian push buttons, traffic signal modifications, and rectangular rapid flashing beacons (RRFBs). The time to Substantial Completion will be 60 days.
07/01/2021 03:00 PM UTC
Re-Bid: 01-21 2021 Pavement Maintenance Program
The Work for the Base Bid will consist of the resurfacing of West Hull Court, West Hull Drive from Liberty Road to U.S. 23, Hawthorn Boulevard from Liberty Road to U.S. 23; this portion of the work will be partially funded with an Ohio Public Works Commission grant. The Base Bid will also include locally-funded cold-in-place recycling (CIR) with an asphalt overlay of Hillside Drive, Tarpy’s Lane, Park Lane, and Orchard Lane. The Project also includes the following locally-funded Add Alternates: The Work for Add Alternate 1 will consist of the resurfacing of Chatham Lane The Work for Add Alternate 2 will consist of cold in-place recycling (CIR) with an asphalt overlay of Hickory Lane. The Work for Add Alternate 3 will consist of cold in-place recycling (CIR) with an asphalt overlay of Westwood Avenue. The Project has a time to Substantial Completion of 60 days. The Owner will issue a Notice to Proceed after a grant agreement is issued by the Ohio Public Works Commission, which is expected to be issued on July 1, 2021.
06/17/2021 03:00 PM UTC
01-21 2021 Pavement Maintenance Program
The Work for the Base Bid will consist of the resurfacing of West Hull Court, West Hull Drive from Liberty Road to U.S. 23, Hawthorn Boulevard from Liberty Road to U.S. 23; this portion of the work will be partially funded with an Ohio Public Works Commission grant. The Base Bid will also include locally-funded cold-in-place recycling (CIR) with an asphalt overlay of Hillside Drive, Tarpy’s Lane, Park Lane, and Orchard Lane. The Project also includes the following locally-funded Add Alternates: The Work for Add Alternate 1 will consist of the resurfacing of Chatham Lane The Work for Add Alternate 2 will consist of cold in-place recycling (CIR) with an asphalt overlay of Hickory Lane. The Work for Add Alternate 3 will consist of cold in-place recycling (CIR) with an asphalt overlay of Westwood Avenue. The Project has a time to Substantial Completion of 60 days. The Owner will issue a Notice to Proceed after a grant agreement is issued by the Ohio Public Works Commission, which is expected to be issued on July 1, 2021.
05/07/2021 03:00 PM UTC
61 - 70 of 134 Solicitations
1 2 3 4 5 7 9 10 11 12 13 14