City of Delaware, Ohio
1 S. Sandusky St., Delaware, OH 43015
(740) 203-1811
Please see Notice to Bidders for each solicitation to find contact information specific to a project.
1 S. Sandusky St., Delaware, OH 43015
(740) 203-1811
Please see Notice to Bidders for each solicitation to find contact information specific to a project.
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
25-14 Merrick Blvd Extension Phase 1
The project work involves the extension of Merrick Blvd as a boulevard section for approximately 0.39 miles from Cambridge Road to Troy Road, including the reconstruction of 0.50 miles of Troy Road and construction of a single lane roundabout. The improvements also include full depth pavement, curb and gutter, concrete median, straight curb, sidewalk, multi-use path, drives, storm sewer, water works, traffic control, landscaping and roadway lighting.
| 12/18/2025 08:00 PM UTC |
| Number | Deadline |
|---|---|
|
10-21 John Street Bridge Replacement
The work for this project is to include the bridge rehabilitation of the John Street bridge. This work consists of replacement of the existing 16’ wide non-composite box beams with a 20’ wide single span concrete slab bridge. The new concrete slab will be placed on the existing concrete spread footings. The project has a time to Substantial Completion of 60 days.
| 05/06/2021 03:00 PM UTC |
|
08-21 US 42 Pavement Repairs
The work for this project is to include pavement repairs on US 42 from 1,600 feet east of Sawmill Parkway to 1,100 feet east of Fern Drive. The Project has a time to Substantial Completion of 45 days.
| 04/22/2021 03:00 PM UTC |
|
06-21 Delaware Municipal Airport Taxilane Reconstruction
Reconstruction of taxilane pavements for T-Hangers A, B, C, and D at the Delaware Municipal Airport. The project duration is 65 days from Notice to Proceed to Substantial Completion.
| 04/13/2021 07:00 PM UTC |
|
07-21 2021 Pavement Maintenance Program (CDBG)
Asphalt resurfacing of Wade Street, Rheem Street, and Flax Street. This project is funded by Community Development Block Grant funds.
| 04/08/2021 03:00 PM UTC |
|
03-21 2021 Pavement Marking Maintenance Program
2021 Pavement Marking Maintenance Program will consist of the maintenance of various auxiliary pavement markings on specified streets within the City of Delaware.
A non-mandatory pre-bid meeting will be held on Wednesday, March 17, 2021 at 10:00 am. through the online Microsoft Teams platform (see Notice to Bidders for additional information).
Bids will be opened through the Bidding Website on March 26, 2021 at 8:00 am.
| 03/26/2021 12:00 PM UTC |
|
02-21 2021 RRFB Safety Project
This project consists of a complete pedestrian crossing push button activated warning system for the shared use path crossing the east leg of the E. Central Ave. & US 23 NB on-ramp intersection. The installation will utilize a single mast arm spanning over both eastbound and westbound lanes supporting supplemental signs and beacons.
The project will also include installation of pedestrian crossing pushbutton activated rectangular rapid flashing beacons (RRFBs) at up to eight additional locations across the City.
| 02/26/2021 04:00 PM UTC |
|
04-21 Penick Avenue Extension Project
New two lane roadway to extend Penick Avenue approximately 680 ft. to the intersection of Cobblestone Drive and Rock Creek Drive. Project will include storm sewers, water main extension, raised median island, curb and gutter, sidewalk, street trees, street lighting, and other miscellaneous items. Connection will be made to a proposed school bus driveway being constructed by others at Schultz Elementary School. The Project has a Substantial Completion date of July 8, 2021 (which is expected to be 90 days after Notice to Proceed).
| 02/23/2021 04:00 PM UTC |
|
05-21
Side Load Refuse Truck - REBID
| 02/12/2021 04:00 PM UTC |
|
17-20
Side Load Refuse Truck
| 01/15/2021 04:00 PM UTC |
|
16-20 Sanitary Sewer Improvements, Grouting & CIPP Lining
Sanitary sewer improvements for West William St and Hayes Colony area. The scope of work includes the lining of existing sanitary sewer main with Cure in place pipe (CIPP) and mainline joint grouting. Sewer pipe preparation including light cleaning, cementitious grouting, trimming of protruding service laterals, and such other preparatory work as specified within the supplemental speciation of the contract. Also, lateral reinstatement, manhole rehabilitation, sewer videotaping and inspection, bypass pumping; and such other work as necessary to meet all contract requirements. The project has an expected duration of about 60 days
| 12/22/2020 04:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.