| Number | Deadline |
|---|---|
|
WP0706 South Shore Breakwater North Section Phase 3
Selective demolition of existing roundhead and Construction of Breakwater Repair Work between approximately Station 18+83 and Station 21+00 and roundhead as detailed in Drawings and in accordance with Specification.
Pre-Bid Meeting: February 27, 2026 at 10:30am via Microsoft Teams. See specs or contact Paul.Montalto@milwaukeecountywi.gov for invitation.
| 03/18/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
P686-187426 - Mitchell Park Domes Annex HVAC
Contract 1: Annex HVAC
Project consists of providing an HVAC system to coo the Greenhouse #7 with air cooled chiller along with two (2) AHU's as indicated on Contract bidding documents.
MANDATORY PRE-BID MEETING: September 12, 2019 at 10:00 A.M., meet at Mitchell Park Domes Annex, 524 South Layton Boulevard, Milwaukee, WI.
Bids Due: September 25, 2019 at 2:00 P.M.
BIDDERS SHALL SUBMIT SPECIAL QUALIFICATION DOCUMENTATION WITH BID. SEE DOCUMENT 00200-INSTRUCTIONS TO BIDDERS, ARTCLE 16.
| 09/25/2019 07:00 PM UTC |
|
A271-19007 - GMIA Jet Bridge Replacement 2019 - Power Racks
Contract Description: Relocate 2 existing power racks from Concourse E to Concourse D. Provide new 400amp, 480V feeds to each rack. Provide new fuses and cabling to the existing rack mounted panels and disconnects.
Pre-Bid Meeting: September 10, 2019 at 10:00 A.M. at the Administration Building Conference Room Hardie.
Bids Due: Wednesday, September 18, 2019 at 2:00 P.M.
| 09/18/2019 07:00 PM UTC |
|
5045-19024: GMIA - Elevator Cab Upgrade
Contract Description: Replacement of automatic pedestrian doors, frames and operators located between the parking structure and both skywalks, all levels.
Pre-Bidding: Friday, August 9, 2019 at 10:00 AM, Hardie Conference Room, located in GMIA Administration.
| 09/06/2019 07:00 PM UTC |
|
4046-19025 - MKE Business Park Building Demolition
The work under this contract will consist of demolition and removal of four concrete block type structures including footings and floor. Removal of a concrete support pedestal. Minor pavement removal, grading, tree removal and landscaping is included.
Pre-Bid Meeting: A Pre-Bid will be held at the MKE Business Park on August 28, 2019 at 10:00 A.M. Meet at the Business Park entrance, 300 East College Avenue, Milwaukee, WI.
| 09/04/2019 07:00 PM UTC |
|
P544-18604 - Re-Bid - McCarty Park Electrical Service Upgrade
Contract 1: Electrical Service Upgrade
Project consists of providing Electrical Service. Upgrade Work as indicated on Contract bidding documents.
Mandatory Pre-Bid Meeting: An additional Mandatory
Pre-Bid Meeting will take place on July 10, 2019 at 9:00 A.M.., meet at McCarty Park Pavilion, 8214 W. Cleveland Avenue, West Allis, WI. Contractors that attended the prior Mandatory Pre-Bid meeting are not required to attend this meeting.
FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE.
| 07/31/2019 07:00 PM UTC |
|
M037-19418 - Milwaukee Public Museum Dome Planetarium & Connecting Atriums Roof Replacement
Contract 1: Roof Replacement
Project consists of replacing existing Museum Dome and Atriums roof as indicated on Contract bidding documents.
One MANDATORY Pre-Bid meeting will take place on July 17, 2019 at 7:00 A.M., meet at the Milwaukee Public Museum Lobby, 800 W. Wells Street, Milwaukee, WI 53233.
FAILURE TO ATTEND THE MANDATORY PRE-BID CONFERENCE WILL RESULT IN BID BEING REJECTED AS NON-RESPONSIVE.
| 07/31/2019 07:00 PM UTC |
|
A264-19002 - GMIA Taxiway E & F Pavement
The project consists of pavement work on Taxiway E & F between Runway 1L-19R and Taxiway Z at General Mitchell International Airport (GMIA) in Milwaukee, WI. This project consists removing the top layer of Portland Cement Concrete (PCC) with minor base layer repair or removal. Replacement of impacted utilities such as storm sewers, manholes, airfield lighting and navigational aids including FAA control cable relocation. The existing taxiway geometry will remain essentially the same, with some minor adjustments in width to comply with current FAA standards. Minor ancillary items are landscaping, painting, joint sealing and barricading.
Pre-Bid Meeting: A Pre-Bid will be held at General Mitchell International Airport on July 24, 2019 at 10:00 a.m. in the Hardie Conference Room, in the GMIA upper Level, Concourse C, Department of Public Works Administration, 5300 S. Howell Avenue, Milwaukee, WI.
| 07/31/2019 07:00 PM UTC |
|
A279-19014 - (MKE) Milwaukee Mitchell International Airport Employee Parking Lot Pavement Rehabilitation
Contract 1: Parking Lot Paving
Work consists of removing asphalt full depth in isolated locations, mill off 2 inches of asphalt surface, and restripe parking lot as indicated in project bid documents.
| 07/31/2019 07:00 PM UTC |
|
A263-19001-02 - GMIA Howell Avenue Tunnel Rehabilitation (Landside)
This project includes a rehabilitation of the Howell Avenue Tunnel Structure at General Mitchell International Airport (MKE). Included in the scope of this project are concrete surface repairs, expansion joint repairs and replacements, concrete protective surface treatments and staining, and miscellaneous other rehabilitation to the existing ventilation and electrical components.
Pre-Bid Meeting: Wednesday, July 24, 2019 at 8:30 A.M. Meet in the Sijan Conference Room, in the MKE terminal (inside aviation museum), 5300 S Howell Ave., Milwaukee, WI.
| 07/31/2019 06:30 PM UTC |
|
5042-18509 - LJT - MWC Control Tower & Quonset Hut Roof Replacement RE-BID
Project consists of roof removal and replacement of an existing asphalt membrane on a two tiered control tower building and Quonset hut roofs including deck repairs, exhaust piping preservation, fall protection railing installation, removal/reinstallation of communication antennas and air conditioning units. Project phasing with FBO & Control Tower tenants is required.
Pre-Bid Meeting: No Pre-Bid Scheduled. Please call Airport Engineering at 414-747-5716 with questions.
| 07/10/2019 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.