Milwaukee County
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
633 W Wisconsin Ave SUITE 1000, Milwaukee, WI 53203-1918
(414) 278-4861
Welcome to Milwaukee County’s online public works bidding website. Please take a moment to review upcoming solicitations.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
WU0301012 (Previously WO0643012) War Memorial Center Flood Mitigation
Work of the Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly.
MANDATORY Pre-Bid Meeting: May 12, 2025 at 10am. 750 N Lincoln Memorial Dr., Milwaukee, WI 53202 Meet at Lower-Level, North Entrance near the security desk.
Questions due: 05/19/2025
Responses due: 06/02/2025
| 06/18/2025 07:00 PM UTC |
WP037201 McKinley Park Flushing Channel
Replacement and rehabilitation of seawall along flushing channel near McKinley Marina. Includes installation of steel sheet piling, fiber reinforced polymer panels, grading, plumbing, electrical, landscaping, custom railing, and concrete seawall walkway.
Optional Pre-Bid Meeting: Wednesday, June 11th, 2025, at 10AM. Meet outside at the Milwaukee Yacht Club Gate, McKinley Park, Milwaukee, WI. This onsite walkthrough and meeting is for contractors to visualize project. This meeting is to explain requirements and ask questions.
| 06/25/2025 07:00 PM UTC |
WP077801 Bender Park Sediment Abatement
Work consists of dredging sediment from the Bender Park boat launch and relocating it within the designated area of Bender Park as indicated in the project bid documents. Additional work consists of dewatering, erosion control, grading, planting, and plant maintenance.
A similar project was bid, though not awarded, in May of 2025. This project differs from that one in that there are alternatives for less dredged volume and a longer timeframe to complete the work.
Pre-Bid Meeting (Optional): Wednesday June 18th, 2025 at 2:00PM. Meeting to be held virtually on Microsoft Teams. Please request an invite to this meeting by emailing Jack Sudar at jack.sudar@milwaukeecountywi.gov
| 07/02/2025 07:00 PM UTC |
WS0149012 Clinton Rose Senior Center Renovation
Work of the project includes predominately interior renovations to the senior center. Scope generally includes demolition of selected existing conditions and construction of new kitchen, computer lab, health rooms, activity rooms, and office space. Finish updates (flooring, walls, cabinetry, ceilings) throughout. HVAC, electrical, and plumbing updates throughout. ADA updates and reconfiguration to restrooms and entryway. The project will also include installing new curb and concrete sidewalk for accessible route from parking lot and other related infrastructure improvements as specified in the bid documents.
Optional Pre-Bid Meeting: June 17th at 10:30 - 11:30am. Meet in person at Clinton Rose Senior Center, 3045 N Dr Martin Luther King Jr Dr Milwaukee.
| 07/02/2025 07:00 PM UTC |
Number | Deadline |
---|---|
WH0260012 S. 76th Street (CTH U) S. County Line Rd. to S. Creekview Ct. Highway Reconstruction
Contract Description: The work under this contract consists of removing concrete paving, asphaltic surface milling, grading, base aggregate dense, concrete paving, HMA pavement, concrete curb & gutter, guardrail, erosion control, restoration, permanent signing, pavement marking, traffic control, replacing existing cross culverts, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. This project is part of the County Highway Improvement Discretionary (CHID) program.
| 02/05/2025 08:00 PM UTC |
WO0643012 War Memorial Center Flood Mitigation
The Project includes construction services to decouple the existing sewer connection. A new vault will be installed to house 4 stormwater pumps that will connect to an existing manhole located to the south. Project will include all associated plumbing and electrical work to ensure the new system runs properly.
A Pre-Bid Meeting will be held 12/20/2024 at 10:00 a.m. at the:
War Memorial Center
750 North Lincoln Memorial Dr.,
Milwaukee, WI 53202.
Plan to meet at Lower-Level, North Entrance near the security desk.
| 01/22/2025 08:00 PM UTC |
WY012302: Crime Prevention Through Environmental Design: Improvements For Parks: King Park Berm
Contract Description: Work of the Project includes removal and regulated disposal of all proposed excavated and tree materials associated with the King Park Berm on the northwest side of the park in accordance with the plans, specifications, and permit requirements.
Pre-Bid Meeting: October 25th, 2024 at 1pm
Non-Mandatory Teams Meeting: Join the meeting now Meeting ID: 266 857 100 773 Passcode: fmz56X
| 11/08/2024 08:00 PM UTC |
WH0281012 128th ARW College Avenue (CTH ZZ) Modifications
Construct a left turn lane and driveway on East College Avenue, County Trunk Highway (CTH ZZ) located 250 feet west of the Union Pacific railroad tracks in the City of Oak Creek, for the benefit of the Wisconsin Air National Guard 128th Air Refueling Wing (128th ARW). The work under this contract shall consist of removing pavement, grading, aggregate base, concrete pavement, concrete driveway, concrete curb and gutter, relocating existing light pole, and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
| 11/01/2024 07:00 PM UTC |
WJ0113 Disaster Recovery Back-up Power at Community Reintegration Center (CRC).
This contract involves the addition of a second electrical feeder to the Community Reintegration Center facility. Bidding document distribution will be online in Bid Express internet Bidding System at https://www.bidexpress.com/businesses/24937/home.
Mandatory Pre-Bid Meeting: Tuesday, October 1st, 2024, at 10:30 AM. Meet at the Community Reintegration Center at 8885 S. 68th Street, Franklin, WI 53132. Please plan on meeting in the lobby for expedited security protocols. Please be prompt.
Bids are due no later than Wednesday, October 23rd ,2024 at 2:00 P.M. Bids are to be completed online in Bid Express internet Bidding System at: https://www.bidexpress.com/businesses/24937/home
Project Contact: Andy Tran
Contact Email: an.tran@milwaukeecountywi.gov
| 10/23/2024 07:00 PM UTC |
WP068801 McKinley Marina Boat Launch Improvements
Improving the McKinley Marina Boat Launch includes reconstructing the boat launch, dredging, and disposal of excess material and debris next to the boat launch. Work includes 8” thick reinforced cast-in-place concrete with textured “v” grooves and 8" thick pre-cast (on-site or off-site) reinforced and textured "v" grooves concrete panels as prescribed in the plans. Other work includes dredging sediment (sand) and disposal offsite.
| 10/22/2024 07:00 PM UTC |
5045-23002 MKE South Ramp Taxi Lane Strengthening
This project includes pavement rehabilitation of the south ramp taxi lane at Milwaukee County’s General Mitchell International Airport (MKE). Included in this contract is substantial grading, concrete paving, construction of sewer and underdrains, asphalt, landscaping, pavement marking, and airfield electrical changes.
Pre-Bid Meeting: Wednesday, October 2nd, 2024 at 10:00am CST, held in the Sijan Conference Room, in the GMIA Main Terminal (Located before security in hallway behind Museum/USO), 5300 South Howell Avenue, Milwaukee, Wisconsin.
| 10/16/2024 07:00 PM UTC |
WY012302 Crime Prevention through Environmental Design
Work of the Project includes removal and regulated disposal of all proposed excavated and tree materials associated with the King Park Berm on northwest side of the park in accordance with the plans, specifications, and permit requirements.
Pre-Bid Meeting: September 11, 2024 at 9:00am. See advertisement for Microsoft Teams Link.
| 09/27/2024 07:00 PM UTC |
WP005046 Lincoln Park Baseball Lighting
Demo and/or abandon any existing baseball lighting systems/facilities and install eight (8) new light poles and fixtures as specified. Coordinate with We Energies and install new electrical as required.
Pre-Bid Meeting: September 11, 2024 at 11am. Meet at Hank Aaron Field, 1301 W. Hampton Avenue.
| 09/26/2024 07:00 PM UTC |
WY012308 - Parks Energy Efficient Light Fixture Upgrades
Remove and dispose of old, existing poles in coordination with the City of Milwaukee. Coordinate permitting and the marking of existing utilities with the appropriate agencies. Install new light poles, fixtures, and control cabinets along select paths in accordance with the plans and specs.
Pre-Bid Meeting: Wednesday, September 4th, at 9:00 AM via Microsoft Teams. See link in advertisement.
| 09/19/2024 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.