General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
P21-3419-C10A
General Bid : Norumbega Tower Repairs Weston, MA The project consists of repairs to the interior and exterior of Norumbega Tower, including: • Masonry repair, repointing, cleaning, and replacement • Waterproofing • Site Improvements • Miscellaneous Metal Work The estimated project cost is $849,973. The work is to be accomplished within 185 calendar days of a notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of Historical Building Restoration Brian M. Arrigo Massachusetts Department of Conservation and Recreation
05/08/2025 04:00 PM UTC
P25-3605-C6A
Memorial Drive – Phase III Cambridge, Massachusetts The work to be performed consists of but is not necessarily limited to the following: numerous parkway and parkland improvements along an approximate one-mile segment of the Memorial Drive Parkway from the Eliot Bridge to the Anderson Memorial Bridge at JFK Street. The estimated project cost is $ 13,400,000 The work is to be accomplished within 878 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Department of Transportation ( MassDOT) Highway Division in Highway-Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
06/05/2025 04:00 PM UTC
P25-3596-M1A
Underwater Inspection & Maintenance Services DCR Facilities Barnstable, Berkshire, Bristol, Dukes, Essex, Franklin, Hampden, Hampshire, Middlesex, Nantucket, Norfolk, Plymouth, Suffolk, Worcester All Components associated with the Dams ( sector gates Bearings, Skin Plates anodes Etc., and Georges Island Waterline and other DCR Facilities. The project consists of inspection and Maintenance Services and repairing all components associated with the Dam (Sector Gates bearings, Skin plates, Anodes etc. Georges Island Waterline) and other DCR facilities The estimated project cost is $ 1,300,000.00 ($ 650,000.00 per Fiscal Year, two years contract) The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Marine Construction or Dam Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. In addition, The General Contractor shall also have the following qualification requirements: . A. A minimum of five years’ experience in Marine Construction to perform the scope of services of this contract. B. The Bidder must be Certified in the following categories: 1. Commercial Scuba-Surface Supplied Air and mixed gas diving operations, equipment repair and Maintenance of diving equipment 2. Hyperbolic Chamber Operations and Hyperbolic Treatment Construction Rigging. 3. Welding, Cutting observation and Lockout Belt Driving The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Brian M. Arrigo, Commissioner Massachusetts Department of Conservation and Recreation
06/05/2025 04:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
P22-3461-M4A
Maintenance of Street Lighting Systems Location: Essex, Middlesex, Suffolk ,Norfolk ,Worcester, Plymouth, Bristol, Barnstable, Berkshire, Franklin, Hampshire, and Hampden The project consists of performing preventative maintenance, repair, upgrading, and replacement of defective lighting systems on DCR parkways, roadways, and properties. Estimated project cost is $ 3,500,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway Lighting to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
07/27/2022 04:00 PM UTC
P22-3468-C01
Hetland Skating Arena Rink Site Remediation and Restoration Address: 310 Hathaway Blvd., New Bedford, Ma 02740 The project consists of remediation of hazardous materials in site soils, including lead, earthwork to excavate and cap, backfilling, site restoration, landscaping, planting, and all associated work. The estimated project cost is $ 1,700,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Hazardous Waste Remediation & Transportation to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
06/29/2022 04:00 PM UTC
P22-3459-C2A (4053-C)
North Wharf Repair, New Bedford State Pier, New Bedford, MA The project consists of repairs to restore vehicle access to the existing roll-on/roll-off ferry landing. Repairs include replacing a 38'x40' section of concrete deck supported by timber piles with a new concrete deck supported by steel piles and stabilizing the adjacent stone seawall with a new steel sheet pile bulkhead The estimated project cost is $ 1,500,000 The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Marine Construction to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
06/22/2022 04:00 PM UTC
P22-3462-C2A
Bridge Maintenance and Repairs, Various Locations: Barnstable, Berkshire, Bristol, Duke, Essex, , Franklin, Hampshire, Hampden, Middlesex, Nantucket, Norfolk , Plymouth, Suffolk , Worcester, Scheduled and emergency bridge repairs Work order assignments will typically consist of furnishing equipment, materials, engineering, & labor to undertake bridge repairs and maintenance, including furnishing traffic management set-ups to support worksite access and coordinating Traffic Police Details. The estimated project cost is $2,100,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in BRIDGE CONSTRUCTION to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
06/15/2022 04:00 PM UTC
P20-3352-C3A
General Re-Bid: Shawme Crowell Comfort Station Renovations Shawme Crowell State Forest, Sandwich, MA The project consists of renovation of five campground comfort stations sitework, and accessible improvements. The estimated project Base Bid cost is $1,800,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
06/15/2022 04:00 PM UTC
P22-3448-C8A
Veterans Memorial Swimming Pool (Magazine Beach) Modernization 719 Memorial Drive – Cambridge, MA 02139 Modifications to the existing swimming pool including installation of new walls, ramps, stairs, railings, piping, and drains. Also, installation of new concrete deck, benches, and rinse stations. The estimated project cost is $ 2,000,000 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in RECREATIONAL FACILITIES to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. CONTRACTS FOR PUBLIC WORKS PROJECTS AND FOR BUILDING PROJECTS ESTIMATED TO COST MORE THAN $25,000 BUT NOT MORE THAN $100,000 SUBJECT TO THE PROVISIONS OF M.G.L. CH. 30 SEC. 39M
06/15/2022 04:00 PM UTC
P20-3352-C3A
Sub Bids (6) :l Re-Bid: Shawme Crowell Comfort Station Renovation Sealed Sub-BID proposals shall be submitted on a form furnished by the Department will be received until 12:00 PM on Wednesday, May 25, 2022 for the following Filed Sub-Bids: 070001 Roofing / Flashing 070002 Waterproofing/ Dampproofing /Caulking 090001 Painting 220000 Plumbing 230000 HVAC 260000 Electrical through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home The project consists of renovation of five campground comfort stations sitework, and accessible improvements. The estimated project Base Bid cost is $1,800,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders, both Sub and General, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for the work they are bidding on and must submit with the bid an update of their respective qualifications. The General Bidder shall have DCAMM certification in the category of General Building Construction.
05/25/2022 04:00 PM UTC
P22-3442-M6A
Carpentry Maintenance and Repair in DCR Facilities – Central & Western, MA Carpentry Maintenance and Repairs at DCR Facilities in Central and Western Massachusetts. Repairs may include accessibility improvements, deck repairs, siding replacement, gutter & downspout replacement, doors and window replacement. This is a work order contract for building sites not identified at this time and will include work on historic structures. Work on historic structures shall comply with appropriate architectural preservation standards. This is a work order contract and does not have specific projects sites identified at this time. The estimated project cost is $ 2,800,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for General Building Construction & Historic Structure Renovation and must submit with the bid an update of their respective qualifications.
05/18/2022 04:00 PM UTC
P22-3478-C2A
Building Demolition (Asset Mitigation Initiative) Belchertown, Boston, Egremont, Georgetown, Mount Washington, Princeton This project entails demolition of thirteen high priority structures found at six different locations . All structures within this contract have been deemed high priority due to safety hazards from the statewide Asset Mitigation Initiative. See Part V for listed buildings. The estimated project Base Bid cost is $ 600,000 Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for which they are bidding on and must submit with the bid an update of their respective qualifications Generals must be certified in Demolition and must submit with the bid an update of their respective qualifications.
05/11/2022 04:00 PM UTC
P22-3442-M5A
Carpentry Maintenance and Repair in DCR Facilities – Eastern Massachusetts Bristol, Barnstable, Middlesex, Essex, Norfolk, Plymouth, Suffolk, Worcester A pre-bidding conference for prospective bidders will be held via MS-TEAMS at 10:00AM April 20, 2022 at the following link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjljNWNkOTAtZDc3OS00ZjFiLWI5N2ItZGQ0ZWQxNzk3NGQx%40thread.v2/0?context=%7b%22Tid%22%3a%223e861d16-48b7-4a0e-9806-8c04d81b7b2a%22%2c%22Oid%22%3a%223718f684-c36e-4532-8814-425d96b655c7%22%7d and call-in #: +1 857-327-9245; 979714924# The project consists of: Carpentry Maintenance and Repairs at DCR Facilities in Eastern Massachusetts. Repairs may include accessibility improvements, deck repairs, siding replacement, gutter & downspout replacement, doors, and window replacement. This is a work order contract for building sites not identified at this time and will include work on historic structures. Work on historic structures shall comply with appropriate architectural preservation standards. This is a work order contract and does not have specific projects sites identified at this time. The estimated project Base Bid cost is $ 3,500,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for General Building Construction & Historic Structure Renovation and must submit with the bid an update of their respective qualifications.
05/11/2022 04:00 PM UTC