General Info

Business Logo

Solicitations and notifications are free for this business.

Commonwealth of Massachusetts, Executive Office of Energy & Environmental Affairs, Dept. of Conservation & Recreation

10 Park Plz Suite 6620, Boston, MA 02116-3933
(857) 283-6746

Please note Effective  January 2025 there will be an increase to the SDP requirements.
MBE and WBE  requirements will no longer be combined.

Requirements as followed: 

MBE:   6%
WBE: 10%
VOBE  3%


For our Supplier Diversity Partners : https://www.diversitycertification.mass.gov/BusinessDirectory/BusinessDirectorySearch.aspx

Please note starting in 2024, our bid day deadline will now be Thursday's @ 12:00PM

Standard Documents

Name * Description
SDP Instructions and COP.pdf (475 KB)
SDP Instructions and COP.
1 Document

Upcoming Solicitations

Number Deadline
W26-7610-C01
Sub-BID Electrical : Quabbin Reservoir Generator Replacement Project DCR Quabbin Reservoir Generator Replacement Project Site #1 - 485 Ware Road, Belchertown, Massachusetts 01007 County: Hampshire Site #2 – Quabbin Hill Road, Ware, Massachusetts 01082 County: Hampshire The project proposes the replacement of two (2) emergency generators for DCR Quabbin Reservoir facilities located in Belchertown and Ware, Massachusetts. The project will result in the removal and installation of two new generator units complete with upgraded automatic transfer switches, remote monitoring systems and fuel storage systems. The project consists of electrical and site modifications as indicated on the drawings. The project is being funded in-part with funding approved from the Federal Emergency Management Agency (FEMA). Estimated project Construction Cost : $ 345,697.00 The work is to be accomplished within 270 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EDT). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) and must submit with the bid an update of their respective qualifications. General bidders must be certified in Mechanical Systems. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/02/2026 04:00 PM UTC
P26-3661-M1A
Annual Maintenance and Service of Industrial Heating, Air Conditioning (HVAC) & Plumbing Systems at Various Flood Control/Navigational Facilities The project consists of Providing annual maintenance and service of Industrial Heating Ventilation and air Conditioning (HVAC) and plumbing systems at Various Flood Control /Navigational Facilities The estimated project: $ 375,000.00 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $ 500.00 . per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in HVAC and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/02/2026 04:00 PM UTC
P24-3573-C1A
Veterans Memorial Park, Waterfront Improvements and Boardwalk Reconstruction The project consists of the reconstruction of Lynn Veterans Memorial Park and Boardwalk (formerly Lynn Heritage State Park on the waterfront). The work includes, but is not limited to, all labor and materials associated with demolition, earthwork and grading, hazardous soil management, paving, planting, addition of a splash pad, lighting, installation of site furnishings, timber framing and decking, sheet pile driving, installation of helical piles, utility replacement, accessibility upgrades, along with erosion control, site preparation, & staging and access. The estimated project cost is $ 18,000,000.00 The work is to be accomplished within 504 calendar days of a notice to proceed. Liquidated damages in the amount of $1,800.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Marine Construction or Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/09/2026 04:00 PM UTC
P26-3670-M2A
Drainage – Cleaning & Maintenance The project consists of cleaning and/or investigation of DCR drainage infrastructure. Typically, work shall include, during regular and emergency response times, the cleaning of catch basin and manhole structures with a vacuum truck, high pressure water jetting of drainage lines, and CCTV investigation. This project shall also include cured-in-place lining & the removal and disposal of all sediments in compliance with the regulations of the Department of Environmental Protection in effect at the time of disposal. The estimated project cost is $7,500,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in CATCH BASIN CLEANING to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
04/09/2026 04:00 PM UTC
P26-3636-M6A
Rink Refrigeration Maintenance & Service Maintenance, Servicing, Repair & Equipment Replacement of all Rink Refrigeration Systems including routine Annual & Seasonal maintenance, facility startup and shutdown, repair of equipment and associated systems, replacement of dehumidification and refrigeration equipment (when necessary), and modernization of systems The work is to be accomplished within 1,095 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EST). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance with (DCAMM Prime) in Mechanical Systems and must submit with the bid an update of their respective qualifications. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/09/2026 04:00 PM UTC
W26-7610-C01
General Bid : Quabbin Reservoir Generator Replacement Project Belchertown & Ware, MA Site #1 - 485 Ware Road, Belchertown, Massachusetts 01007 County: Hampshire Site #2 – Quabbin Hill Road, Ware, Massachusetts 01082 County: Hampshire The project proposes the replacement of two (2) emergency generators for DCR Quabbin Reservoir facilities located in Belchertown and Ware, Massachusetts. The project will result in the removal and installation of two new generator units complete with upgraded automatic transfer switches, remote monitoring systems and fuel storage systems. The project consists of electrical and site modifications as indicated on the drawings. The project is being funded in-part with funding approved from the Federal Emergency Management Agency (FEMA). Estimated project Construction Cost : $ 345,697.00 The work is to be accomplished within 270 calendar days of a notice to proceed. Liquidated damages in the amount of $ 500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a requirement of 6% of the bid price for minority-owned business enterprises and a requirement of 10% for women-owned business enterprises. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bid Bonds must be submitted electronically, please ensure your company and your bonding agent's company register with one of the Bid Bond agencies affiliated with Bid Express: If you need additional assistance, please call the Bid Express Customer Support Team at 888-352-2439, available Monday - Friday from 7:00am – 8:00pm (EDT). You can also email the team support@bidexpress.com or refer to the Vendor Resource page Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) and must submit with the bid an update of their respective qualifications. General bidders must be certified in Mechanical Systems. Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/16/2026 04:00 PM UTC
P26-3666-M4A
Arboricultural Services for DCR Parkways, Roadways, and other DCR Managed Properties The project consists of tree care such as pruning, maintenance and removal as needed along DCR properties and parkways as assigned. The estimated project cost is $ 6,500,000 The work is to be accomplished within 1095 calendar days of notice to proceed. Liquidated damages in the amount of 1000.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Tree Trimming Maintenance & Removal to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Commissioner Nicole LaChapelle Massachusetts Department of Conservation and Recreation
04/23/2026 04:00 PM UTC
P26-3666-C2A
Western MA Mountain Road Culvert Improvements Mount Greylock State Reservation & Pittsfield State Forest Berkshire County This project consists of the replacement of two existing culverts within Mount Greylock State Reservation and two within Pittsfield State Forest (four culvert replacements total) to improve drainage capacity and structural integrity. The upgrades will enhance resilience to increased stormwater flows from future rainfall events, reduce erosion and flooding risks, and alleviate existing safety hazards affecting access to both mountain road systems. The designs for both locations incorporate climate-resilient principles to ensure long-term durability and environmental stability within these critical areas. The estimated project cost is $ 4,700,000.00 The work is to be accomplished within 730 calendar days of notice to proceed. Liquidated damages in the amount of $100.00 per day will be assessed if the work is not completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be prequalified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in BRIDGE - CULVERT to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The Proposed contract includes a requirement of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise). The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. Nicole LaChapelle, Commissioner Massachusetts Department of Conservation and Recreation
04/30/2026 04:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
P23-3490-M2A
Rebid : Annual Underwater Maintenance and Service Barnstable, Berkshire, Bristol, Essex, Franklin, Hampden, Hampshire, Middlesex, Norfolk, Plymouth, Suffolk, Worcester, Dukes, Nantucket GENERAL BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM on Wednesday May 24th 2023, through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. The project consists of Annual inspection and repair all components associated with the Dam ( Sector Gates bearings, Skin plates, Anodes etc..) and all various Flood Control facilities The estimated project cost is $ 1,200,000.00 ( $ 600,000.00 per Fiscal Year, two years contract) The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $_500.00 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Marine Construction or Dam Construction_ to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. In addition, the General Contractor shall also have the following qualification requirements: A. A minimum of five years’ experience in Marine Construction to perform the scope of services of this contract. B. The Bidder must be Certified in the following categories: 1. Commercial Scuba-Surface Supplied Air and mixed gas diving operations, equipment repair and Maintenance of diving equipment 2. Hyperbolic Chamber Operations and Hyperbolic Treatment Construction Rigging. 3. Welding, Cutting observation and Lockout Belt Driving The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
05/24/2023 04:00 PM UTC
P19-3273-C1A
Clippership Connector Greenway- Medford - MA The project consists of construction of a half-mile long shared use path along the Mystic River in Medford from Clippership Park to the Andrews Middle School at Riverbend Park. The estimated project cost is $3,720,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $1000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAYS-BIKE TRAILS to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Each bid must be accompanied by a bid deposit, in the form of a bid bond, cash, certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
05/17/2023 04:00 PM UTC
P23-3496-C1A
Drainage Infrastructure Repair & Replacement Counties: Essex, Middlesex, Suffolk, Norfolk, Bristol, Plymouth, Barnstable, Dukes, Nantucket, Worcester, Hampden, Hampshire, Franklin & Berkshire The project consists of the adjustment or rebuilding of drainage structures to proper grade, as well as repair, replacement, and installation of drainage infrastructure. The estimated project cost is $ $7,000,000.00 The work is to be accomplished within 730 calendar days of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in HIGHWAY CONSTRUCTION or DRAINAGE to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Each bid must be accompanied by a bid deposit, in the form of a bid bond, treasurer's or cashier's check issued by a responsible bank or trust company, payable to the Department of Conservation and Recreation in the amount of 5% of the bid. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
05/17/2023 04:00 PM UTC
P23-3490-M4A
Latta Brothers Memorial Pool Bathhouse Entry Modernization 49 Fellsway W, Somerville, MA 02145 Project # P23-3499-C2A ( correction Addenda #1) The project consists of: Full reconstruction of the pool bathhouse entrance including new central stairway, accessible ramp, security/entrance doors and associated site work. The estimated project: $400,000. The work is to be accomplished within 180 calendar days of a notice to proceed. Liquidated damages in the amount of $1,000 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum requirement of 15.3%. The applicable local women workforce utilization percentage is a minimum requirement of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises (“VOBE”) on its construction projects. The Veteran-Owned Business Enterprise benchmark for this contract is 3.0%. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) Bidders must be certified in General Building Construction and must submit with the bid an update of their respective qualifications. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
04/26/2023 04:00 PM UTC
P23-3516-M1A Re-Bid
Overhead Door Maintenance, Repair and Replacement- Re-Bid Location: Counties : Barnstable, Berkshire, Bristol, Essex, Franklin, Hampden, Hampshire, Middlesex, Norfolk, Plymouth, Suffolk, Worcester The project consists of the maintenance, repair, and replacement of all types of overhead doors, metal rollup window coverings and all ancillary components, on an as needed basis. The estimated project: 300,000.00 All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) in General Building Construction with a minimum of Five Years’ Experience in Commercial Overhead Door repair and must submit with the bid an update of their respective qualifications. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
04/19/2023 04:00 PM UTC
P22-3442-M2A Rebid
E Mass Carpentry Repairs at DCR Facilities, Eastern Massachusetts Counties: Bristol, Barnstable, Middlesex, Essex, Norfolk, Dukes, Plymouth, Suffolk, Worcester Repairs may include interior and exterior carpentry repairs, accessibility improvements, deck repairs, siding replacement, gutter & downspout replacement, doors and window repair and replacement. This is a work order contract for buildings and other assets within DCR’s inventory and will include work on historic structures. Work on historic structures shall comply with appropriate architectural preservation standards. This is a work order contract and does not have project specific sites identified. The estimated project Base Bid cost is $ 3,500,000. Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All General Bidders, for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) for General Building Construction and Historical Building Restoration and must submit with the bid an update of their respective qualifications.
04/19/2023 04:00 PM UTC
P23-3499-C9A
Building & Pool Painting : Statewide Locations: Barnstable,Berkshire,Bristol,Essex,Franklin,Hampden,Hampshire, Middlesex,Norfolk,Plymouth,Suffolk,Worcester, Dukes, Nantucket The project consists of: Building Painting, Pool Painting, Caulking and Associated Surface Repairs at DCR locations statewide GENERAL BID proposals shall be submitted on a form furnished by the Department and will be received until 12:00 PM Wednesday, April 12, 2023 through DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. Individual sets of contract documents will only be available on DCR’s E-bid room at www.bidexpress.com/businesses/36765/home. A pre-bidding conference for prospective bidders will be held March 30, 2023 at 10:00 AM and will be held virtually on MS-Teams: https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZWYyMGFjMTEtNDZjMi00MTNkLWExNTItYjg2NGE2MmExOTJj%40thread.v2/0?context=%7b%22Tid%22%3a%223e861d16-48b7-4a0e-9806-8c04d81b7b2a%22%2c%22Oid%22%3a%223718f684-c36e-4532-8814-425d96b655c7%22%7d Meeting ID: 280 425 782 904 Or call in (audio only) +1 857-327-9245,,709128863# Bids are subject to the provisions of M.G.L. Ch. 149, sections 44A to H, inclusive. In addition, bids are also subject to Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per Mass. Gen. L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so. All Bidders for this project are required to be certified with the Massachusetts Division of Capital Asset Management and Maintenance (DCAMM). Bidders must be certified in both Painting and Historical Painting and must submit with the bid an update of their respective qualifications.
04/12/2023 04:00 PM UTC
P23-3495-C1A
Building Demolition Locations: Statewide The project consists of the possible demolition of 120+- structures located Statewide that have been deemed unsafe and hazardous to the public The estimated project cost is $ 2,000,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Demolition to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
04/12/2023 04:00 PM UTC
P23-3485-C4A
Marine Park Playground Construction William J Day Boulevard, Boston, MA 02127 The project consists of the removal of pavements, play structure posts and foundations, play surfacing, fence post foundations and concrete edge, trees and miscellaneous site elements and the installation of new fencing, play surfacing, pavements, benches, bike racks, boulders, trees and seeding. Contractor will coordinate the provision and installation of play structures by others with the play structure installer and DCR. The estimated project cost is $ 1,126,845.08 The work is to be accomplished within 120 calendar days of a notice to proceed. Liquidated damages in the amount of $500 per day will be assessed if the work has not been completed in accordance with the provisions of the contract within the time specified (as extended by any authorized extension of time granted in accordance with the contract provisions). Bidders must be pre-qualified by the Massachusetts Dept. Of Transportation (MassDOT) Highway Division in Recreational Facilities to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
04/05/2023 04:00 PM UTC
P23-3500-C2A
DCR Sidewalks and Ramps - Eastern Massachusetts Barnstable, Bristol, Essex, Middlesex, Norfolk, Plymouth, and Suffolk Counties. The project consists of DCR sidewalks (both hot-mix asphalt and cement concrete) and curbing, including pedestrian ramps. Some locations may require new sidewalk construction as well as various other items of work listed herein. The estimated project cost is $6,000,000.00 Bidders must be pre-qualified by the Massachusetts Dept. of Transportation (MassDOT) Highway Division in Highway–Sidewalk and Curbing to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by MassDOT prior to the opening of Proposals. Each bid must be submitted through DCR’s E-Bid room at www.bidexpress.com/businesses/36765/home. Please ensure that your bid is complete and marked as responsive when submitting through DCR’s Bid room. Any bids found to be incomplete and/or marked unresponsive will be rejected by DCR and will not be considered when awarding the project. Bids are subject to the provisions of M.G.L. Ch. 30, Sect. 39F, G, H and M inclusive. Wages are subject to minimum wage rates as per M.G.L. Ch. 149, sections 26 to 27D inclusive. The Department reserves the right to waive any informalities in or to reject any and all bids if it be in the public interest to do so.
03/22/2023 04:00 PM UTC
151 - 160 of 308 Solicitations