General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-63-1
Oak Harbor Blvd Drainage -------------------The Parish requests a contractor to improve drainage along Oak Harbor Blvd (R09J090) in Slidell, Louisiana, by removing and replacing concrete panels and rollover barrier curbs, as well as resealing catch basins, as required in the specifications.
11/25/2025 08:00 PM UTC
25-60-1
N Lake Washington Ct.-------------------------------The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by rebuilding catch basins as specified along N Lake Washington Ct (R08L040), located in Slidell, Louisiana.
12/03/2025 08:00 PM UTC
25-61-1
STP Pond & Barn Facility Maintenance - The Parish requests a Contractor to construct (6) metal roof covers/lean-tos, with or without access panels, and two (2) concrete slabs, with and without catch basins for the St. Tammany Parish Brewster Maintenance Barn, Bush Maintenance Barn, Haas Road Pond, and Lenwood Drive Pond as required in the specifications.
12/03/2025 08:00 PM UTC
25-62-1
Koop Drive Armed Security Guard Services--------------------The purpose of this Essential Service Quote is to establish a contract for Licensed Armed Security Guard Services for St. Tammany Parish Government (Parish) for a period beginning January 1, 2026 through December 31, 2026.
12/03/2025 08:00 PM UTC
25-65-1
Traffic Calming Program Military Rd PH. 1-------------------------------- The Parish requests a contractor to implement traffic calming improvements by installing asphaltic concrete speed tables, updating related pavement markings and signage within the Cross Gates Subdivision in Slidell, LA. The work is intended to reduce vehicle speeds, enhance safety, and improve roadway visibility through new striping, arrows, advisory signs, and refreshed stop bars, with an additional alternate location included in the Magnolia Forest Subdivision in Pearl River, LA.
12/04/2025 08:00 PM UTC
25-64-1
STP Jail Lawn Maintenance-----------------------------------St. Tammany Parish Government Department of Facilities Management is seeking a Provider to provide landscape maintenance services at the St. Tammany Parish Jail, located at 1200 Champagne Street, Covington, LA 70433.
12/09/2025 08:00 PM UTC
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
14 Solicitations

Closed Solicitations

Number Deadline
24-12-2
Purchase of 3 Fiberglass Buildings---The work to be done under these Contract Documents is to furnish, crate, and deliver three (3) reinforced fiberglass buildings, complete with all accessories, as specified in these contract documents.
04/25/2024 07:00 PM UTC
24-17-1
S Pebble Beach Ct Drainage - The Parish requires a Contractor to clean, repair, reseal existing interior pipe joints located at 106 S Pebble Beach Ct (R09B020) Section 29, Township 8S, Range 14E, in Slidell, Louisiana.
04/23/2024 07:00 PM UTC
24-16-1
Koop 3rd Floor Buildout - Bldg B - The Parish requires a contractor to provide all labor, materials and equipment necessary to create a new reception room at our Koop Campus Building B – 3rd Floor facility located at 21454 Koop Drive, Mandeville, LA 70471.
04/18/2024 07:00 PM UTC
24-8-2
2024 East District Panel Replacements----The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by reconstructing and/or milling and overlaying road surfaces as specified along the following Parish roads: - Brookter St. (R08V118) Section 24 Township 9S Range 14E Slidell; - Churchill St. (R08V033) Section 24 Township 9S Range 14E Slidell; - Clearwood Dr. (R08I040) Section 36 Township 8S Range 14E Slidell; - Dylan Dr. (R08V068) Section 24 Township 9S Range 14E Slidell; - Firwood Dr. (R08I047) Section 26 Township 8S Range 14E Slidell; - Goldenwood Dr. (R08M061) Section 38 Township 9S Range 15E Slidell; - Heather Dr. (R08I053) Section 25 Township 8S Range 14E Slidell; - Heather Ln. (R08V048) Section 24 Township 9S Range 14E; and - Hempstead St. (R08V030) Section 24 Township 9S Range 14E Slidell; - Kingspoint Blvd. (R08V016) Section 13 Township 9S Range 14E Slidell; - Lakeshore Blvd N. (R09J109) Section 34 Township 9S Range 14E Slidell; - N Caleb Dr. (R08N101) Section 37 Township 9S Range 15E Slidell; - Wellington Ln. (R08V031) Section 24 Township 9S Range 14E Slidell; - Windrift Dr. (R08V017) Section 13 Township 9S Range 14E Slidell. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/18/2024 07:00 PM UTC
24-5-2
Tchefuncte Habitat Restoration------------------------------------------------------------- The work of this project includes the construction of a pier 300’ in length, construction of a rock breakwater approximately 400’ in length, and the construction of a vinyl sheet pile bulkhead around the existing peninsula of the Tchefuncte River Lighthouse.
04/18/2024 07:00 PM UTC
24-4-2
Third St Drainage-------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage and turning radius starting at Third Street (R04D025) Section 34 Township 7S Range 11E located in Mandeville, Louisiana.
04/17/2024 07:00 PM UTC
24-7-2
2024 West District Panel Replacement------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as required in specifications along various Parish roads.
04/17/2024 07:00 PM UTC
24-14-1
Autumn Haven Subdivision Sinkholes - Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to increase area drainage by replacing/resealing catch basins, pipe repair, and installing sod, located along Autumn Haven Cir (R04E249) Section 48 Township 8S Range 12E ; Autumn Woods Dr (R04E246) Section 48 Township 8S Range 12E ; Haven Way (R04E247) Section 48 Township 8S Range 12E in Lacombe, Louisiana.
04/04/2024 07:00 PM UTC
24-15-1
Bard Circle Drainage and Panels - The Parish requests a contractor to reseal interior joints of the existing subsurface pipe and remove/replace concrete road panels located along Bard Cir (R08I050) Section 25, Township 9S, Range 14E, located in Slidell, Louisiana.
04/04/2024 07:00 PM UTC
24-10-1
Bel Air Subdivision------The Parish requires the Contractor to improve the roadway by removing, replacing, and repairing concrete panels and curbs along Palmetto Ct. (R09A057) Section 18, Township 8S, Range 14E, and Headwaters Dr. (R09A019) Section 19, Township 8S, Range 14E, located in Slidell, Louisiana.
04/04/2024 07:00 PM UTC
191 - 200 of 917 Solicitations
1 2 16 17 18 20 22 23 24 91 92