St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
| 10/07/2025 07:00 PM UTC |
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on
Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
| 10/07/2025 07:00 PM UTC |
Number | Deadline |
---|---|
303-00-17-49-2
2017 District 3 Road Improvements.....This is a District Capital Road Improvement Project for District 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; and Stephanie Ln (R01B021) Section 8 Township 6S Range 10E, Covington, Louisiana.
| 08/01/2017 07:00 PM UTC |
339-00-17-46-2
STPC - Built-In-Cooler for the Morgue ----- The work shall include the removal of the existing controlled environment room (existing cooler) and the supply and installation of a new controlled environment room (Cooler), per the specifications.
| 07/27/2017 07:00 PM UTC |
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
| 07/27/2017 07:00 PM UTC |
522-00-17-45-2
HVAC Controllers Upgrade... The Contractor must provide, install, program, and commission new HVAC network controllers, server and associated equipment in two (2) Parish facilities, as per the specifications.
| 07/20/2017 07:00 PM UTC |
304-00-17-44-2
Woodridge Blvd Drainage and Canary Pine Ct Drainage....
The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, excavation and embankment on Woodridge Blvd (R04C004) Section 19 Township 8 Range 15 and Canary Pine Court (R04C006) Section 19 Township 8 Range 15.
| 07/18/2017 07:00 PM UTC |
440-15-17-39-2
Airport Corporate Hangar Facilities ----- This project consists of the construction of a terminal building, a hangar building and ramp, a parking lot and drive, a water line and other site work.
| 07/12/2017 07:00 PM UTC |
622-10-17-48-2
Sewer & Appurtenances Annual Part 2
| 07/12/2017 07:00 PM UTC |
315-45-17-43-2
2017 District 4 Road Improvements.... This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Copal St (R04C032) Section 45 Township 8S Range 11E; Northlake Dr (R03K061) Section 45 Township8S Range 11E; and Dogwood Dr (R03K020) Section 37 Township 7S Range 11E.
| 06/27/2017 07:00 PM UTC |
622-10-17-35-2
Submersible Pump Annual.....This is not a new bid - previous bid inadvertently closed. The Parish, as a function of Tammany Utilities, owns and operates approximately 50 wastewater treatment plants, 40 water wells, over 200 sewage lift stations and miles of water distribution and sewage collection lines. Tammany Utilities, therefore, routinely has the need for submersible pumps.
| 06/15/2017 07:00 PM UTC |
310-00-17-42-2
Marigny Avenue Drainage Improvements........................ The work specified in this project will require the Contractor to provide all tools, labor, equipment and materials necessary to improve drainage by removing and installing subsurface drainage pipe, cross drain pipe and drives, and performing drainage excavation on Marigny Avenue (R04E115) Section 38 Township 7 South Range 11.
| 06/14/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.