St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-6-2
Alton Water Systems Interconnect ----The work includes the construction of an interconnecting pipeline, approximately one thousand six hundred (1,600) linear feet in length, to provide a connection between the Alton Water System and an adjacent privately owned utility. All work shall be performed in accordance with the Contract Documents and as further detailed in the technical specifications.
| 10/07/2025 07:00 PM UTC |
25-51-1
Madewood Dr Drainage----The Parish requests a contractor to improve drainage by removing and replacing failed subsurface drainage, removing and replacing driveways, and installing new catch basins located on
Madewood Dr (R04D089); as specified, in Mandeville, Louisiana 70471.
| 10/07/2025 07:00 PM UTC |
Number | Deadline |
---|---|
314-00-17-58-2
2017 District 14 Road Improvements........This is a District Capital Road Improvement Project for Districts 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve the roads by reconstructing and/or milling and overlaying road surfaces, as specified, along Browns Village Rd (R09I001) Section 27 Township 8S Range 14E; Fifth St (R09I018) Section 27 Township 8S Range 14E; Fifteenth St (R09I056) Section 27 Township 8S Range 14E; First St (R09I010) Section 27 Township 8S Range 14E; and Javery St (R09D038) Section 34 Township 8S Range 14E.
| 09/21/2017 07:00 PM UTC |
311-00-17-54-2
Ranch Rd & Ranch Rd Drainage ----- This is a District Capital Road Improvement Project for Districts 11. The Contractor must provide all labor, equipment, tools, testing, and materials necessary to improve the road by reconstructing the road surface. The work will also include the removal/replacement of drain pipes, cleaning/shaping/grading ditches, installing pipe headwalls, maintenance aggregate, topsoil, and hydro-seeding, as specified, along Ranch Rd (R09E050) Section 39 Township 9S Range 13E, Slidell, LA.
| 09/19/2017 07:00 PM UTC |
321-00-17-55-2
Building B Buildout - Public Works...Portions of the third floor of Koop Drive, Building B shall have carpet tiles and linear base installed per the manufacturer’s specifications. All materials and demolition, surface preparation and installation work shall be included.
| 09/14/2017 07:00 PM UTC |
015-05-17-65-2
Road Signs
| 09/14/2017 07:00 PM UTC |
300-00-17-57-2
Dove Park Rd. Mill and Overlay -------- This is a 2017 Capital Road Improvement Project. The work specified in this project will require the Contractor to provide all labor, equipment, and materials necessary to improve road surfaces by milling and overlaying 2” of asphaltic concrete and installing roadway striping as specified along Dove Park Rd (R04D001) Section 25 Township 7S Range 11E.
| 09/12/2017 07:00 PM UTC |
316-00-17-47-2
Lake Village Drainage Improvements/N. Pearl Dr Mill and Overlay.....
A. Lake Village Drainage Improvements
o Selective tree removal
o Demolition and removal of existing catch basins and storm drains.
o Installation of new junction boxes and catch basins.
o Installation of approximately 2,000 linear feet of 60” RCP storm drain and miscellaneous storm drains ranging from 15” to 24” diameter.
o Roadway repair, sidewalk construction, and driveway construction.
o Grading, erosion and sediment control, traffic control, and vegetation establishment.
B. North Pearl Mill and Overlay
o 2” mill and overlay from Station 01+38 (Gause Boulevard) to Station 44+50 (Lake Erie Drive) as shown in the Plans.
o Guardrail system at W-15 Canal crossing
o Striping
| 09/07/2017 07:00 PM UTC |
315-05-17-50-2
2017 Districts 6 & 5 Road Improvements.....This is a district capital road improvement project for Districts 6 & 5. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Firetower Rd (R06H001) Section 5 Township 7S Range 14E; St Amand St (R10C002) Section 19 Township 6S Range 12E; Sandy Ln (R04D057) Section 27 Township 7S Range 11E; and Harper Rd #2 (R06F005) Section 15 Township 7S Range 14E.
| 09/05/2017 07:00 PM UTC |
311-00-17-52-2
2017 District 11 Road Improvements....This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Azalea Ln (R06L005) Section 33 Township 7S Range 13E ; Red Mill Rd (R07C042) Section 28 Township 8S Range 13E (Lacombe, La.).
| 09/05/2017 07:00 PM UTC |
416-15-17-53-2
Lower W-15 Area Drainage Improvements...............................The completed Work will provide Owner with a regional stormwater detention pond known as the Tenet Pond. Additional details describing the work are provided in Section 01 11 00 of Division 01, Technical Specifications.
| 08/31/2017 07:00 PM UTC |
015-60-17-51-2
Windshield Repair/ Replacement
| 08/16/2017 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.