General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-18-2
Northshore Circle and Lakeview Dr. Improvements---------------The Contractor shall provide labor, equipment, and materials necessary to complete the work in accordance with the construction drawings and project specifications for the Northshore Circle and Lakview Dr. Improvements project, located along Northshore Circle, Section 31-32, Township 9S, Range 14E and Lakeview Dr., Section 31-32-33, Township 9S, Range 14E, Slidell, LA.
06/24/2025 07:00 PM UTC
25-39-1
Wilkinson St Drainage-------------------------The Parish requests a Contractor to restore area drainage by installing/replacing drain pipe, catch basins, and sod at several locations alone Wilkinson St., (R04D041); Mandeville, Louisiana, 70448.
06/25/2025 07:00 PM UTC
25-19-2
St. John Church Rd Bridge----------------------------The Contractor must provide all labor, equipment, tools, testing, and materials necessary to complete the work as required in the construction drawings and specifications, located on St. John Church Rd (B02G002), Section 7, Township 5S, Range 10E, Folsom, LA.
07/01/2025 07:00 PM UTC
25-41-1
Terra Bella Curb Repair----The Parish requests a Contractor to perform roadway improvements by removing and replacing sections of concrete barrier curbs as specified along Inglewood Terrace (R01C059), Covington, LA; Bocage Ct (R01C039), Covington, LA; Melrose Ave (R01C042), Covington, LA.
07/02/2025 07:00 PM UTC
25-40-1
Sludge Removal from Cross Gates #1----St. Tammany Parish, Department of Utilities (DU) requests a contractor for the removal of sludge, sand, and waste material from the Cross Gates #1 treatment plant, located at 350 N. Military Rd, Slidell, LA.
07/02/2025 07:00 PM UTC
25-16-2
Camp Salmen Historic Lodge restoration----------------Historic restoration of the Camp Salmen Lodge building will include hazardous material abatement, masonry and plaster repair and restoration, door and window restoration and replacement, interior material restoration and replacement, wood roof framing code retrofit, and new roofing system.
07/08/2025 07:00 PM UTC
25-22-2
Brewster Area Road Maintenance----The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to perform roadway improvements. Work shall include milling, overlaying, and patching of road surfaces as specified along: − Bocage Ct (R01C039) Covington; − Fayedaye St (R01I048) Madisonville; − Melrose Ave (R01C042) Covington; and − Spring Haven Ln (R01J098) Madisonville.
07/09/2025 07:00 PM UTC
25-20-2
St Tammany Parish Fishing Pier---------------------------Removal of damaged timber fishing pier, and the construction of new “hardened” fishing pier, including steel framing, steel decking, and steel piles. Work also includes lighting, a dry pipe sprinkler system, and other amenities.
07/23/2025 07:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
300-00-17-30-2
Clipper Drive Bridge..... The Contractor will provide all labor, equipment, tools, and materials necessary for the demolition of a single span slab span bridge and retaining walls and construction of a precast 3-span slab span bridge and sheet pile retaining walls, and all associated earthwork. The work includes riprap, concrete approach slabs, concrete approach pavement with class II base course and guardrails.
05/09/2017 07:00 PM UTC
310-00-17-33-2
2016 District 10 Road Improvements ---------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve the road by reconstructing road surfaces as specified. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time for completion is forty-five (45) days from the date specified in the Notice to Proceed + Calculated Rain Days per the attached specifications.
05/09/2017 07:00 PM UTC
622-10-17-15-2
Utility Construction and Maintenance Contract
05/04/2017 07:00 PM UTC
622-95-17-28-2
Castine EQ Recondition - Static Screen..............................................................The Parish requires a Contractor to provide two (2) static screens.
05/03/2017 07:00 PM UTC
416-10-17-18-2
Bayou Chinchuba Phase 2 ---------- Excavation of a 10-ft deep wet pond within an existing dry pond and installation of an aeration system, including electrical service from the main line along the St Tammany Trace to and for the wet pond aeration system. A temporary construction entrance is required through an established construction servitude from Hwy 59 westward to the site, along with other erosion control measured as necessary to prevent migration of sediment into waterways and onto roadways
05/02/2017 07:00 PM UTC
123
THIS IS A TEST PROJECT ONLY
04/27/2017 03:50 PM UTC
622-04-17-31-2
1.7 Meter Belt Filter Press
04/26/2017 07:00 PM UTC
302-00-17-20-2
2017 District 2 Road Improvements ----- This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Arthur Rd (R03K034) Section 42 Township 6S Range 11E; Jenkins Ave (R03K061) Section 42 Township 6S Range 11E; Kustenmacher Rd (R03K020) Section 36 Township 6S Range 11E; Schiro Rd (R03G004) Section 2 Township 6S Range 11E; and St. Joseph Rd (R03G002) Section 2 Township 6S Range 11E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is 60 calendar days from the date the Notice to Proceed is issued.
04/25/2017 07:00 PM UTC
314-00-17-27-2
2017 Districts 8, 12, 13 & 14 Road Improvements...........This is a District Capital Road Improvement Project for Districts 8, 12, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Hunters Creek Rd (R08I010) Section 25 Township 8S Range 14E; El Centro St (R09J096) Section 22 Township 9S Range 14E; Park Place (R09J051) Section 44 Township 9S Range 14E; Indian Village Dr (R08P007) Section 15 Township 9S Range 15E; Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E; Ondine Ln (R09J032) Section 33 Township 9S Range 14E; Aviator St (R09D047) Section 3 Township 9S Range 14E; and James Crosby Rd (R08A012) Section 11 Township 8S Range 14E.
04/25/2017 07:00 PM UTC
304-00-17-26-2
Del Oaks Drive & Roger Storme Rd Road Improvements...........This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by raising the elevation of approx. 450 lf of roadway on Del Oaks by approx. 6.5 ft, and raising the elevation of approx. 400 lf of roadway on Roger Storme by approx. 6.5 ft, work to also include removal of trees, replacement of driveway aprons, and modifications for tie-ins as specified along Del Oaks Dr (R04A047) Section 54 Township 7S Range 11E ; Roger Storme (R04A001) Section 54 Township 7S Range 11E.
04/25/2017 07:00 PM UTC
611 - 620 of 882 Solicitations
1 2 58 59 60 62 64 65 66 88 89