St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-15-2
Emergency Fuel Services
| 03/17/2026 07:00 PM UTC |
|
26-11-2
Tammany Trace Bridge #24--------------------------------------------------The work to be included under this contract shall consist of furnishing all labor, materials, equipment, tools, supervision, and incidentals necessary for the removal and replacement of the existing bridge structure, earthwork and path base, relocation of existing drainage ditches, installation of concrete and asphalt paving, fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
| 03/24/2026 07:00 PM UTC |
|
26-14-2
2026 District Panel Replacements-----------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing and/or replacing concrete panels, concrete barriers, rollover curbs, curbs, and gutters as specified along the following Parish roads:
- Kepler Lake Ct (R08L055) Slidell, LA;
-Lake Michigan Dr (R08L050) Slidell, LA;
- Lake Village Blvd (R08L026) Slidell, LA;
- W Forest Dr (R08I034) Slidell, LA;
- Willow Cir (R08I045) Slidell, LA;
- Greenleaves Blvd (R04O060) Mandeville, LA;
- Alisa Dr (R09A033) Slidell, LA;
- Clearpoint Dr (R09A024) Slidell, LA;
- Madeline Ln (R09A063) Slidell, LA;
- MCH Rd (R04F064) Mandeville, LA;
- Willow Wood Dr (R08M060) Slidell, LA;
- Silverwood Dr (R08M062) Slidell, LA;
- Goldenwood Dr (R08M061) Slidell, LA;
- Larchwood Dr (R08M073) Slidell, LA;
- Elizabeth Dr (R09G044) Slidell, LA;
- Queen Anne Dr (R09G038) Slidell, LA;
- Westminster Dr (R09G033) Slidell, LA;
- Trafalgar St (R08V029) Slidell, LA;
- Tumblebrook St (R08V025) Slidell, LA;
- Foxcroft St (R08V019) Slidell, LA;
- Almond Creek Rd (R08V021) Slidell, LA; and
- Brookter St (R08V108) Slidell, LA.
| 03/24/2026 07:00 PM UTC |
|
26-16-2
Rosedown Way Drainage Phase 2--------------
The Contractor shall provide all labor, equipment, tools, testing, and materials
necessary to complete drainage improvements in accordance with the construction
plans and specifications for the Rosedown Subdivision, located in Mandeville,
Louisiana, 70471. The work includes replacement of existing drainage
infrastructure along Camden Court, construction of a new concrete-lined channel
to Lake Vista Drive, replacement of culverts under Lake Vista Drive, and all
incidental work, such as replacement of concrete street panels, sidewalks, and
driveways, utility relocations, installation of sewer and water conflict boxes, and
placement of rip rap at the outfall.
| 03/31/2026 07:00 PM UTC |
|
26-8-1
123 Kelly Dr. & 222 S. Queens Dr. Drainage---------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials, for cleaning and sealing pipe joints and catch basins, removing and replacing panels, and rebuilding CB-06 to improve drainage as specified along Kelly Dr (R081005) and S Queens Dr (R081072) located in Slidell, Louisiana.
| 03/31/2026 07:00 PM UTC |
|
26-7-1
Cody Ln Drainage---------------------------------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary for the removal and replacement of existing structures to restore proper drainage, including installing or replacing drain pipes, cleaning existing ditches, driveways, and turnouts, and completing miscellaneous related work and sod restoration as specified along Cody Ln (R020028); located in Covington, Louisiana.
| 03/31/2026 07:00 PM UTC |
|
26-17-2
Slemmer Rd Drainage Ph 2--------------------The Contractor must provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing, replacing, and/or repairing drainpipes, catch basins, driveways, and sod as specified along Slemmer Rd (R03L006), located in Covington, LA.
| 04/01/2026 07:00 PM UTC |
|
26-13-2
Justice Center Boilers--------------------------Base Bid to include the removal of (2) existing hot water heating boilers with (1) new boiler to be replaced in a configuration similar to existing. Piping for the second boiler shall be stubbed out and capped for future replacement. A rental boiler shall be included to maintain building heating during the project. A new opening and roll door in the boiler room wall to be installed to accommodate boiler removal and installation as well as future service. The door to the loading dock area will be replaced with a pair of 3'-0" x 8'-0" hollow metal doors and hardware to accommodate boiler replacement.
| 04/08/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
303-00-18-18-2
2018 District 3 Road Improvements ----- The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Blackwell Cemetery Rd (R02E011) Section 11 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Factory Rd (R02D004) Section 1 Township 5S Range 10E; Lela Belle Rd (R02A006) Section 19 Township 4S Range 10E; Willie Garrett Rd (R02A012) Section 28 Township 4S Range 10E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 06/26/2018 07:00 AM UTC |
|
311-00-18-28-2
2017 District 11 Rd Improvements...........................This is a District Capital Road Improvement Project for District 11. The Contractor must provide all labor, equipment, tools, and materials necessary to improve
roadways by reconstructing, milling and overlaying, and/or overlaying with patching road surfaces as specified along Dummyline Rd (R06G006) Section 27
Township 7S Range 14E; Maxi Ln (R08A003) Section 3 Township 8S Range 14E; Murray Rd (R08A002) Section 2 Township 8S Range 14E.
| 06/20/2018 07:00 PM UTC |
|
312-00-18-29-2
City Dr Drainage, Ph. 2...........................The Contractor must provide all labor, equipment, tools, and materials necessary to improve the drainage system along the existing roadside ditches. Work to include removing/replacing driveway culverts, drainage pipes, concrete walks and driveways, excavation, installing catch basins, and concrete headwalls as specified
along City Dr. (R09J050) in Slidell, Louisiana (Section 22 Township 9S Range 14E).
| 06/19/2018 07:00 PM UTC |
|
300-00-18-27-2
Christwood Blvd Ext.............The Contractor must provide all labor, equipment, tools, and materials necessary to perform the following:
• Clearing and grubbing of the new right-of-way, including stripping topsoil, grubbing, and hauling off of trees, vegetation, and topsoil;
• Construction of a two lane undivided roadway, cul-de-sac(s), and driveways, including roadway/driveway base and sub-base, striping, and signage;
• Construction of roadside ditches, including culverts and sweeping of an existing ditch;
• Removal of existing asphalt, including temporary stockpiling and haul-off;
• Construction of a right turn lane from Brewster Road to Christwood Boulevard Extension, including pavement base and sub-base, curb and gutter, striping and signage; and
• Other items as shown on the plans, specifications and supplemental specifications.
| 06/08/2018 07:00 PM UTC |
|
300-00-18-19-2
Three Rivers Road Widening Phase 2............ The Contractor must provide all labor, equipment, tools, and materials necessary to perform road improvements as specified along Three Rivers Road in Covington, Louisiana, including: cold planing existing asphalt, widening and overlay of asphalt and concrete, drainage structures, driveway reconstruction, and striping and pavement signing.
| 05/30/2018 07:00 PM UTC |
|
304-00-18-10-2
2018 District 4 Road Improvements ----- This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Black River Dr (R01J042) Section 42 Township 7S Range 10E; Fountain St (R04C039) Section 45 Township 8S Range 11E; Hawthorne Hollow (R01J041) Section 42 Township 7S Range 10E; Iberville St (R04A006) Section 34 Township 7S Range 11E; Magnolia Ridge Ct (R01J054) Section 42 Township 7S Range 10E; Magnolia St (R04C031) Section 45 Township 8S Range 11E; Pelican Ridge Dr (R01J053) Section 42 Township 7S Range 10E; Rock Bass Ct (R01J052) Section 42 Township 7S Range 10E.
| 05/22/2018 07:00 PM UTC |
|
309-00-18-12-2
2018 District 9 Road Improvements ----- This is a District Capital Road Improvement Project for District 9. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Bristol Pl (R08N027) Section 38 Township 9S Range 15E; Camden St (R08N024) Section 38 Township 9S Range 15E; Carey Rd (R08A036) Section 10 Township 8S Range 14E; Piney Cir (R08N074) Section 39 Township 9S Range 15E; Spring Ridge Cir (R08N073) Section 39 Township 9S Range 15E; Starling Dr (R08N051) Section 39 Township 9S Range 15E; Starling Dr (R08N151) Section 16 Township 9S Range 15E.
| 05/22/2018 07:00 PM UTC |
|
314-00-18-04-2
Queen Anne Drainage ----- This is a District Capital Drainage Improvement Project for District 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by installation of pipe to facilitate the installation of a flap gate near Queen Anne Dr (R09G038) Section 38, Township 9, Range 14 in Slidell, Louisiana.
| 05/22/2018 07:00 PM UTC |
|
302-00-18-05-2
2017 District 2 Road Improvements.....................................This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Chandler Dr (R03J021) Section 42 Township 6S Range 11E; Dahlia St (R10D015) Section 36 Township 6S Range 11E; KC Camp St (R03F030) Section 6 Township 6S Range 10E; Landry Kate Ln (R03L170) Section 11 Township 7S Range 11E; Ruby St (R03K073) Section 42 Township 7S Range 11E; Third St (R03K017) Section 42 Township 7S Range 11E.
| 05/17/2018 07:00 PM UTC |
|
303-00-18-01-2
2017 District 3 Road Improvements..........................This is a District Capital Road Improvement Project for Districts 3. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Foal Ct (R03D045) Section 13 Township 16S Range 10E; Orleans Ave (R02N004) Section 18 Township 5S Range 11E; Paris St (R02N016) Section 18 Township 5S Range 11E; Savannah Rd (R01G001) Section 4 Township 7S Range 10E; Wilkinson Rd (R01B011) Section 21 Township 6S Range 10E.
| 05/17/2018 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.