St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-20-2
Goldenwood Drive Drainage--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools,testing, and materials necessary to improve drainage by cleaning and installing CIPP liner in the drain pipe as specified along Goldenwood Dr (R08M061), located in Slidell, LA.
| 05/05/2026 07:00 PM UTC |
|
26-24-2
2026 Official Journal---------------------The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
| 05/12/2026 07:00 PM UTC |
|
26-26-2
700 Gallon Trailer Mounted Jet Rodder-------------------The Parish is seeking bids to procure a 700-Gallon Trailer-Mounted Jet Rodder. Vendor shall provide all labor, materials, and equipment necessary to provide and deliver a 700-gallon trailer-mounted jet rodder. This equipment shall be new. Prior approved Make: Pipe Hunter and Model: 7724 or equivalent.
| 05/12/2026 07:00 PM UTC |
|
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
| 05/14/2026 07:00 PM UTC |
|
26-10-1
Camp Salmen Nature Park Playground----------------St. Tammany Parish Government is requesting a Contractor to provide all labor, materials, and equipment to install approximately 5,651 square feet of turf over existing poured-in-place surfacing, as well as install 1,536 square feet of new turf and padding over a stone base. The Contractor shall also provide and install a 60’LX50’WX12’H Eave Hip Shade structure to cover the playground area, and install a 3 bay 8’ swing frame with shade and swing set belt seats or comparable in the area with the new turf at the Camp Salmen Nature Park Playground, 35122 Parish Pkwy, Slidell, LA 70460.
| 05/14/2026 07:00 PM UTC |
|
26-25-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as
indicated on the Drawings. The clearing of underbrush and planting of the new landscape
materials shall also be performed as indicated on the Drawings. The project shall be broken
out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings.
| 05/19/2026 07:00 PM UTC |
|
26-27-2
St. Tammany Parish Library-Mandeville Branch Reno------------------------------------------St. Tammany Parish Government requires a contractor to perform renovations to the existing Mandeville Branch Library. The project includes improvements to both the exterior and interior of the facility as indicated in the bid documents.
The work shall be broken out into a Base Bid and Alternates, as indicated in the drawings.
| 06/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
015-60-16-66-2
Windshield Repair/ Replacement
| 12/29/2016 08:00 PM UTC |
|
015-80-16-60-2
Trace Bridge Repairs - The Contractor must provide all labor, materials, equipment and supervision necessary to remove and replace decayed timber piles, stringers, and bent caps. The work is to include all necessary cribbing, jacking and supports required to hold up deck and all galvanized connectors, as well as all hardware required to install materials. Timber is to be replaced.
| 12/09/2016 08:00 PM UTC |
|
314-00-16-55-2
Voters Rd. - Curve to Allen Rd. Mill and Overlay ----- This is a 2016 Capital Road Improvement Project for District 13 and District 14. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by milling and overlaying and improve drainage by installing subsurface drainage as specified along Voters Rd (R08V002) Section 24 Township 9S Range 14E.
| 10/18/2016 07:00 PM UTC |
|
015-45-16-58-2
2016 DPW Maintenance Overlays Phase 2
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2 inch asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12 inch patching and 1.5 inches cold planing as specified. See specifications attached for: 9th Street (R04A038); 11th Street (R04A003); Brookside (R04D035); Cody Lane (R02O028); Fincher Road (R05E016); Green Court (R04E162); La Salle Street (R04D059); Le Cirque (R01J073); Meadow Court (R04E160); Nelson Road (R05F018); Passman Road (R03F031); Prairie Court (R04E164); Raehyo Lane (R03E013); Ridge Court (R04E163); Rue Mon Jardin (R01J070); St. Ann Street (R03J035); Trail Court (R04E159); Walker Street (R03J034); and Ward Road (R05E015).
| 10/18/2016 07:00 PM UTC |
|
312-00-16-56-2
2016 District 12 Road Improvements ----- This is a 2016 Capital Road Improvement Project for District 12. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with a 2” mill and overlaying, and removing and replacing concrete panels as specified along Behrman Street (R08U015) Section 23 Township 9S Range 14E ; and Bosworth Street (R08U020) Section 23 Township 9S Range 14E.
The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/28/2016 07:00 PM UTC |
|
015-35-16-54-2
2016 DPW Maintenance Overlays Phase 1
------
The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with 2” Asphalt wearing course, La DOTD Type 3, shoulder material, full depth 12” patching and manhole adjustment, as specified. See specifications attached for Coci Road (R06E015); Dixie Road (R09I002); Donnis Drive (R09B007); Golden Lane (R08A006); Jefferson Street (R09D035); John Anthon Road (R06G022); Lynn Road (R09F007); Marina Lane (R09H042); Miller Creek Lane (R08I004); Neal Lane (R08K010); Pebblebrook Lane (R08I003); Shirmac Drive (R08N069); Sleepy Hollow Lane (R08I011); Sue Street (R09F006); Susan Lane (R08K009); and Third Street (R09I016).
The time period for completion of the project is 90 calendar days + calculated rain days.
The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
| 09/27/2016 07:00 PM UTC |
|
301-00-16-51-2
2016 District 10 Road Improvements.......This is a 2016 Capital Road Improvement Project for District 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with milling and overlaying, overlaying, and adding pavement striping along Coffee Street (R04D047) Section 39 Township 8 South Range 11 East; Dupard Street (R04D168) Section 39 Township 8 South Range 11 East; and Lafitte Street (R04D050) Section 39 Township 8 South Range 11 East.
| 09/23/2016 07:00 PM UTC |
|
324-00-16-52-2
Waste Water Treatment and Control - Public Works Wash Racks
| 09/20/2016 07:00 PM UTC |
|
313-00-16-50-2
2016 District 13 Road Improvements.........This is a 2016 Capital Road Improvement Project for District 13. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with asphalt overlays on Faciane Lane (R09H022) Section 38 Township 9S Range 14E ; Coin Du Lestin Dr. (R09H025) Section 38 Township 9S Range 14E.
| 09/13/2016 07:00 PM UTC |
|
403-15-16-45-2
STAC Phase 3 Drainage Detention Pond/ STEM Bldg.
The Parish requires a contractor to clear, excavate, and grade to construct a dry dentention pond. Work will also include construction of a maintainance road around the perimeter of the pond and construction of a temporary crossing at the linear detention pond. Hauling, placing, grading and compacting fill material for the future STEM building.
| 09/07/2016 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.