Upcoming Solicitations

Number Deadline
26-39-2
Cherry Laurel Dr Drainage--------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by installing, removing, and replacing drainpipe, catch basin, and sod. Work will include asphalt, and patching as specified along Cherry Laurel Dr (R04A032) located in Covington, LA.
09/09/2026 07:00 PM UTC
26-30-1
Whispering Ln Drainage-------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing cross culverts, catch basins, and sewer tie ins as specified along Whispering Ln (R01I016) located in Madisonville, Louisiana.
09/15/2026 07:00 PM UTC
26-29-1
N 27th St Drainage ------------------------------------- The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage along N 27th St (R07E059), Lacombe, LA. Work shall include removing, replacing, and installing drainage culverts and catch basins as specified.
09/17/2026 07:00 PM UTC
26-31-1
E. Brewster Rd Pipe Repairs------------------------------The Parish requests a contractor to improve drainage as specified along E. Brewster Rd (R01L003), Covington, Louisiana, by removing roots and cleaning and installing CIPP liner through existing pipes.
09/17/2026 07:00 PM UTC
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
622-04-17-31-2
1.7 Meter Belt Filter Press
04/26/2017 07:00 PM UTC
302-00-17-20-2
2017 District 2 Road Improvements ----- This is a District Capital Road Improvement Project for District 2. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Arthur Rd (R03K034) Section 42 Township 6S Range 11E; Jenkins Ave (R03K061) Section 42 Township 6S Range 11E; Kustenmacher Rd (R03K020) Section 36 Township 6S Range 11E; Schiro Rd (R03G004) Section 2 Township 6S Range 11E; and St. Joseph Rd (R03G002) Section 2 Township 6S Range 11E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is 60 calendar days from the date the Notice to Proceed is issued.
04/25/2017 07:00 PM UTC
314-00-17-27-2
2017 Districts 8, 12, 13 & 14 Road Improvements...........This is a District Capital Road Improvement Project for Districts 8, 12, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces, as specified, along Hunters Creek Rd (R08I010) Section 25 Township 8S Range 14E; El Centro St (R09J096) Section 22 Township 9S Range 14E; Park Place (R09J051) Section 44 Township 9S Range 14E; Indian Village Dr (R08P007) Section 15 Township 9S Range 15E; Middle Pearl Dr (R08P010) Section 15 Township 9S Range 15E; Ondine Ln (R09J032) Section 33 Township 9S Range 14E; Aviator St (R09D047) Section 3 Township 9S Range 14E; and James Crosby Rd (R08A012) Section 11 Township 8S Range 14E.
04/25/2017 07:00 PM UTC
304-00-17-26-2
Del Oaks Drive & Roger Storme Rd Road Improvements...........This is a District Capital Road Improvement Project for District 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by raising the elevation of approx. 450 lf of roadway on Del Oaks by approx. 6.5 ft, and raising the elevation of approx. 400 lf of roadway on Roger Storme by approx. 6.5 ft, work to also include removal of trees, replacement of driveway aprons, and modifications for tie-ins as specified along Del Oaks Dr (R04A047) Section 54 Township 7S Range 11E ; Roger Storme (R04A001) Section 54 Township 7S Range 11E.
04/25/2017 07:00 PM UTC
300-00-17-13-2
Francis Rd Extension............................................... Clearing and grubbing, grading, drainage structures, cold planning asphaltic concrete, class II base course, superpave asphaltic concrete overlay, asphalt concrete pavement roadway and shoulders, open channel ditches, asphaltic shared use path, striping, signing, and related work.
04/18/2017 07:00 PM UTC
318-00-17-12-2
Safe Haven Renovations Quad A Asbestos Abatement ----- The abatement of ACM (floor tile, drywall walls and drywall ceilings) and the selected demolition of millwork and other building components, per the plans and specifications (Attachment “A”). All demolition activity shall follow the applicable, federal, state, and local guidelines and regulations. Contractor shall be responsible for removal, transportation and disposal of the demolition debris in accordance with all applicable federal, state and local regulations governing demolition and the demolition of structures containing hazardous substances. Project requires a Building Construction License and Hazardous Materials License. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. Contract time shall be 45 calendar days from the date of notice to proceed. All labor, supervision, materials, services, supplies, equipment, permits, transportation and disposal fees required to complete the work, per the plans and specifications (Attachment “A”), shall be included in the lump sum bid.
04/18/2017 07:00 PM UTC
010-07-17-29-2
2017 Official Journal
04/13/2017 07:00 PM UTC
010-01-17-25-2
SUV Chevrolet Suburban
04/13/2017 02:39 PM UTC
314-00-17-21-2
2017 Districts 8, 13 & 14 Panel Replacements - This is a District Capital Panel Replacement Project for Districts 8, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by removing and replacing various concrete panels and rollover curbs as specified along Devonshire Dr. (R08V039) Section 32 Township 6S Range 12E ; Hampton Ln (R08V042) Section 24 Township 9S Range 14E; Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E; Lake Michigan Dr. (R08L050) Section 31 Township 8S Range 15E; Montgomery Blvd (R08V044) Section 24 Township 9S Range 14E ; and Shylock Dr. (R08V059) Section 32 Township 6S Range 12E.
04/12/2017 07:00 PM UTC
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
04/12/2017 07:00 PM UTC