St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-20-2
Goldenwood Drive Drainage--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools,testing, and materials necessary to improve drainage by cleaning and installing CIPP liner in the drain pipe as specified along Goldenwood Dr (R08M061), located in Slidell, LA.
| 05/05/2026 07:00 PM UTC |
|
26-24-2
2026 Official Journal---------------------The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
| 05/12/2026 07:00 PM UTC |
|
26-26-2
700 Gallon Trailer Mounted Jet Rodder-------------------The Parish is seeking bids to procure a 700-Gallon Trailer-Mounted Jet Rodder. Vendor shall provide all labor, materials, and equipment necessary to provide and deliver a 700-gallon trailer-mounted jet rodder. This equipment shall be new. Prior approved Make: Pipe Hunter and Model: 7724 or equivalent.
| 05/12/2026 07:00 PM UTC |
|
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
| 05/14/2026 07:00 PM UTC |
|
26-10-1
Camp Salmen Nature Park Playground----------------St. Tammany Parish Government is requesting a Contractor to provide all labor, materials, and equipment to install approximately 5,651 square feet of turf over existing poured-in-place surfacing, as well as install 1,536 square feet of new turf and padding over a stone base. The Contractor shall also provide and install a 60’LX50’WX12’H Eave Hip Shade structure to cover the playground area, and install a 3 bay 8’ swing frame with shade and swing set belt seats or comparable in the area with the new turf at the Camp Salmen Nature Park Playground, 35122 Parish Pkwy, Slidell, LA 70460.
| 05/14/2026 07:00 PM UTC |
|
26-25-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as
indicated on the Drawings. The clearing of underbrush and planting of the new landscape
materials shall also be performed as indicated on the Drawings. The project shall be broken
out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings.
| 05/19/2026 07:00 PM UTC |
|
26-27-2
St. Tammany Parish Library-Mandeville Branch Reno------------------------------------------St. Tammany Parish Government requires a contractor to perform renovations to the existing Mandeville Branch Library. The project includes improvements to both the exterior and interior of the facility as indicated in the bid documents.
The work shall be broken out into a Base Bid and Alternates, as indicated in the drawings.
| 06/03/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
015-60-17-16-2
Windshield Repair/ Replacement
| 03/23/2017 07:00 PM UTC |
|
316-00-17-11-2
Cross Gates Pond Improvements.................................
This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
| 03/21/2017 07:00 PM UTC |
|
306-00-17-09-2
2017 District 6 Road Improvements.....................................
This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
| 03/15/2017 07:00 PM UTC |
|
309-00-17-08-2
2017 District 9 Road Improvements---------------This is a District Capital Road Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Audubon St (R08G009) Section 31 Township 8S Range 15E; Autumn Lakes Rd (R08N097) Section 38 Township 9S Range 15E; Blackbeard Dr (R08N043) Section 17 Township 9E Range 15E; Doubloon Dr (R08N042) Section 17 Township 9S Range 15E; Pearl River St (R08N014) Section 38 Township 9S Range 15E; Waverly Dr (R08L068) Section 38 Township 9S Range 15E; and Walnut St (R08G002) Section 31 Township 8S Range 15E.
| 03/14/2017 07:00 PM UTC |
|
310-00-17-07-2
2017 Districts 5 & 10 Road Improvements
This is a District Capital Road Improvement Project for Districts 5 & 10. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Strain Rd (R04F001) Section 19 Township 7S Range 12E ; America St (R04E331) Section 38 Township 8S Range 11E ; and Orleans St (R04E129) Section 38 Township 8E Range 11E.
| 03/13/2017 07:00 PM UTC |
|
300-00-16-70-2
Oak Harbor Road Elevation ................................................This project includes removing and replacing roadway pavement, raising the levee and roadway, hydro-seeding, installation of new drainage pipe and structures, incidental clearing, and other related work.
| 03/01/2017 08:00 PM UTC |
|
015-25-17-02-2
Road Materials
| 02/21/2017 08:00 PM UTC |
|
403-09-16-59-2
Fishing Pier Phase II Offshore
| 02/14/2017 08:00 PM UTC |
|
015-05-17-05-2
Road Signs
| 02/09/2017 08:00 PM UTC |
|
010-35-17-03-2
Fuel & Oil
| 02/09/2017 08:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.