General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/06/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/08/2026 08:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
313-00-16-50-2
2016 District 13 Road Improvements.........This is a 2016 Capital Road Improvement Project for District 13. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces with asphalt overlays on Faciane Lane (R09H022) Section 38 Township 9S Range 14E ; Coin Du Lestin Dr. (R09H025) Section 38 Township 9S Range 14E.
09/13/2016 07:00 PM UTC
403-15-16-45-2
STAC Phase 3 Drainage Detention Pond/ STEM Bldg. The Parish requires a contractor to clear, excavate, and grade to construct a dry dentention pond. Work will also include construction of a maintainance road around the perimeter of the pond and construction of a temporary crossing at the linear detention pond. Hauling, placing, grading and compacting fill material for the future STEM building.
09/07/2016 07:00 PM UTC
337-00-16-53-2
Justice Center Lighting Upgrade to LED-------------------------- The Parish extends this MATERIAL ONLY bid request to procure energy efficient LED lightbulbs and/or upgrade kits (products) for the Justice Center Lighting Upgrade to LED project. Pricing shall include all shipping and delivery costs and must be valid through the term of the contract, which is valid until December 31, 2016. Defective products and products damaged during shipping and/or delivery shall be replaced at no additional cost to the Parish. Products shall be delivered within forty-five (45) calendar days from the date a Purchase Order is issued by the Parish. A liquidated damages fee of five hundred ($500) dollars per day shall be in effect for products not delivered within the specified time frame. All product deliveries shall be made to the Facilities Management Office at the Justice Center located at 701 N. Columbia Street, Covington, La 70433. The specifications in Attachment “A” are intended to be the minimum requirements of the products to be provided in the bid request. The specifications shall provide an equal to or greater than value. Request for approval of an equivalent product must be submitted, with the alternative product specifications, catalog cuts, and descriptive literature, per the deadline date and time set forth in Section 1.3 Schedule of Events of this Bid Request. The Parish shall review the request, determine if the product qualifies as an “approved equivalent” and issue an addendum with the determination. It is the sole discretion of the Parish to make the determination if a product will be acceptable as an equivalent. Please send “approved equivalent” requests via email to purchasing@stpgov.org no later than 2:00 PM on August 23, 2016. The name of any manufacturer mentioned in the specifications is for the purpose of establishing a minimum acceptable standard of quality desired by the Parish. On all items bid, the Respondent shall indicate clearly the product being bid and, where applicable, shall supply catalog cuts and descriptive literature with the original copy of the bid. All products bid must have prior approval as “approved equivalents”. Any work that may be reasonably inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described herein which so applied to this project are covered by a well-known technical meaning or specification shall be deemed to be governed by such recognized standards unless specifically excluded. A bid guarantee is not required for this project. The Base Bid shall be the sum total of the unit prices for one (1) each of the specified products in Attachment “A,” which shall include all applicable costs.
09/01/2016 07:00 PM UTC
300-00-16-49-2
STAC Centerpoint Blvd Ph 2 ------ Construction of concrete roadway, sidewalks, and sidewalks with concrete pavers; Pavement Striping; Subsurface Drainage; Water house connections to existing 16” water main; Clearing and Grubbing of future St. Tammany Parish Emergency Operations Center site; and final grading in accordance with plan details.
08/30/2016 07:00 PM UTC
334-00-16-25-2
Roof Repair/ Jail ------ St.Tammany Parish Jail Building A (Base Bid) roof repair and re-roofing and Building C (Alternate No. 1) roof repair and restoration. The front portion of the roof on Building A, approximately 18,858 sq. ft., shall be removed and replaced. The existing parapet walls shall be encased in metal flashing to cover up the existing exposed CMU wall system. The roof of Building C, approximately 30,000 sq.ft, shall be repaired and restored.
08/11/2016 07:00 PM UTC
305-00-16-38-2
Emerald Forest Blvd. Ext ------ Site security and control of access, erosion control, removing topsoil and organic material for the road bed, borrowing material by expanding the Crestwood Pond to be used as road base and shoulder area, testing subbase and base martial for chemical stabilization, stabilizing the subbase material with lime (12” thick by 9% by volume), stabilizing the base with soil cement (12” thick by 10% by volume), paving the new road with 4” thick asphalt binder and 2” wearing by 24 feet wide, installing 6’ wide aggregate shoulders, install drainage ditches, culverts headwalls, rip rap, thermoplastic pavement markings, signs, and hydro-seeding.
08/10/2016 07:00 PM UTC
440-13-16-47-2
St. Tammany Regional Airport Runway Rehabilitation This project consists of the pavement rehabilitation for Runway 18/36 and the taxiway. This project will include crack sealing, emulsified asphalt seal coating, pavement markings, and shoulder redressing.
08/09/2016 07:00 PM UTC
306-00-16-46-2
2016 District 6 Road Improvements -- The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Adolph Craddock Rd (R06H028) Section 16 Township 7S Range 14E ; Churchill Downs Dr (R05A027) Section 28 Township 5S Range 12E ; Dalton Craddock Rd (R06H043) Section 16 Township 7E Range 14E ; Ed Yates Rd (R06H027) Section 16 Township 7S Range 14E ; Kenzie Rd (R02P023) Section 22 Township 5S Range 11E ; Oley Crawford Rd (R06H045) Section 15 Township 7S Range 14E ; Santa Anita Dr (R05B019) Section 27 Township 5S Range 12E ; Wallace King Rd (R02S008) Section 13 Township 5S Range 11E. The time period for completion of the project is sixty (60) calendar days.
08/02/2016 07:00 PM UTC
337-00-16-42-2
Justice Center Lighting Upgrade to LED
07/21/2016 07:00 PM UTC
430-23-16-41-2
Carroll Road Trail
07/20/2016 07:00 PM UTC
711 - 720 of 932 Solicitations
1 2 68 69 70 72 74 75 76 93 94