General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-39-2
Cherry Laurel Dr Drainage--------------------------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve drainage by installing, removing, and replacing drainpipe, catch basin, and sod. Work will include asphalt, and patching as specified along Cherry Laurel Dr (R04A032) located in Covington, LA.
09/09/2026 07:00 PM UTC
26-30-1
Whispering Ln Drainage-------------The Parish requests a Contractor to provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage by removing and replacing cross culverts, catch basins, and sewer tie ins as specified along Whispering Ln (R01I016) located in Madisonville, Louisiana.
09/15/2026 07:00 PM UTC
26-29-1
N 27th St Drainage ------------------------------------- The Contractor shall provide all adequate and competent labor, equipment, tools, and materials necessary to improve drainage along N 27th St (R07E059), Lacombe, LA. Work shall include removing, replacing, and installing drainage culverts and catch basins as specified.
09/17/2026 07:00 PM UTC
26-31-1
E. Brewster Rd Pipe Repairs------------------------------The Parish requests a contractor to improve drainage as specified along E. Brewster Rd (R01L003), Covington, Louisiana, by removing roots and cleaning and installing CIPP liner through existing pipes.
09/17/2026 07:00 PM UTC
26-40-2
Nolan Rd Ph 2--------------------Work to include subsurface drainage on both sides of Nolan Rd, in addition to widening, overlaying, and striping the entirety of the roadway. Work shall include the excavation and/or embankment, clearing and grubbing, driveway replacement, signage replacement, and hydroseeding, as specified along Nolan Rd (R10D003) Section 30 Township 7S Range 12E, located in Covington, LA.
09/22/2026 07:00 PM UTC
26-41-2
French Branch Pond Expansion------------The project consists of the construction of an approximately 47.77 acre pond and associated drainage infrastructure. The work includes, but is not limited to, construction of a stone access road; installation of inlet and outlet concrete structures; installation of subsurface drainage structures; construction of weirs and headwalls; and off-site disposal of excavated materials.
10/01/2026 07:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/11/2017 07:00 PM UTC
318-00-17-23-2
Fairgrounds Phase 3
04/11/2017 07:00 PM UTC
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
04/07/2017 07:00 PM UTC
303-00-17-10-2
2017 District 3 Road Improvements ------ This is a District Capital Road Improvement Project for District 3. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing them as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow (R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031) Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4 Township 7S Range 10E.
04/04/2017 07:00 PM UTC
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E . The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
04/04/2017 07:00 PM UTC
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
015-60-17-16-2
Windshield Repair/ Replacement
03/23/2017 07:00 PM UTC
316-00-17-11-2
Cross Gates Pond Improvements................................. This is a 2017 Capital Drainage Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve drainage by installing a concrete wet well, a submersible pump, associated drainage equipment/features, related mechanical and electrical equipment, and embankment as specified at the Cross Gates Pond (P08LW01069) Section 38 Township 9S Range 15E.
03/21/2017 07:00 PM UTC
306-00-17-09-2
2017 District 6 Road Improvements..................................... This is a District Capital Road Improvement Project for District 6. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Becky Lake Dr (R06C010) Section 40 Township 6S Range 14E; Chat Ct (R05B044) Section 27 Township 5S Range 12E; Dolph Gaines (R06E009) Section 27 Township 7E Range 14E; Marcus Rd (R05G026) Section 33 Township 4S Range 13E; O Wager Rd (R10B017) Section 10 Township 6S Range 12E; S Davis Rd (R10B016) Section 10 Township 6S Range 12E; Tot Polk Rd (R06I013) Section 39 Township 6S Range 14E; Warrior Trace (R02U003) Section 11 Township 5S Range 11E; and Wilson Ln (R06I012) Section 38 Township 6S Range 14E.
03/15/2017 07:00 PM UTC
309-00-17-08-2
2017 District 9 Road Improvements---------------This is a District Capital Road Improvement Project for District 9. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and milling and overlaying as specified along Audubon St (R08G009) Section 31 Township 8S Range 15E; Autumn Lakes Rd (R08N097) Section 38 Township 9S Range 15E; Blackbeard Dr (R08N043) Section 17 Township 9E Range 15E; Doubloon Dr (R08N042) Section 17 Township 9S Range 15E; Pearl River St (R08N014) Section 38 Township 9S Range 15E; Waverly Dr (R08L068) Section 38 Township 9S Range 15E; and Walnut St (R08G002) Section 31 Township 8S Range 15E.
03/14/2017 07:00 PM UTC
741 - 750 of 996 Solicitations
1 2 71 72 73 75 77 78 79 99 100