General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-20-2
Goldenwood Drive Drainage--------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools,testing, and materials necessary to improve drainage by cleaning and installing CIPP liner in the drain pipe as specified along Goldenwood Dr (R08M061), located in Slidell, LA.
05/05/2026 07:00 PM UTC
26-24-2
2026 Official Journal---------------------The newspaper shall have been published in an office physically located in the Parish of St. Tammany for a period of five (5) years preceding the selection, shall not have missed during that period as many as three (3) consecutive issues unless caused by fire, flood, strike or natural disaster, must have maintained a general paid circulation in the Parish of St. Tammany for five (5) consecutive years and shall have been entered in a U.S. post office in the Parish of St. Tammany under a second class mailing permit for a period of five (5) consecutive years prior to the selection.
05/12/2026 07:00 PM UTC
26-26-2
700 Gallon Trailer Mounted Jet Rodder-------------------The Parish is seeking bids to procure a 700-Gallon Trailer-Mounted Jet Rodder. Vendor shall provide all labor, materials, and equipment necessary to provide and deliver a 700-gallon trailer-mounted jet rodder. This equipment shall be new. Prior approved Make: Pipe Hunter and Model: 7724 or equivalent.
05/12/2026 07:00 PM UTC
26-23-2
Casril Drive Drainage Improvements--------------------------------------This project includes the construction of subsurface drainage, open ditches, cleaning of box culverts, concrete and asphalt drives, asphalt mill and overlay, signage and striping, and traffic calming speed tables, as specified along Casril Dr. between Hwy 59 and Soell Dr., located in Mandeville, LA.
05/14/2026 07:00 PM UTC
26-10-1
Camp Salmen Nature Park Playground----------------St. Tammany Parish Government is requesting a Contractor to provide all labor, materials, and equipment to install approximately 5,651 square feet of turf over existing poured-in-place surfacing, as well as install 1,536 square feet of new turf and padding over a stone base. The Contractor shall also provide and install a 60’LX50’WX12’H Eave Hip Shade structure to cover the playground area, and install a 3 bay 8’ swing frame with shade and swing set belt seats or comparable in the area with the new turf at the Camp Salmen Nature Park Playground, 35122 Parish Pkwy, Slidell, LA 70460.
05/14/2026 07:00 PM UTC
26-25-2
LA-22 Beautification Project -----------------------Work to consist of the removal of dead plantings, underbrush, trees, stumps, etc as indicated on the Drawings. The clearing of underbrush and planting of the new landscape materials shall also be performed as indicated on the Drawings. The project shall be broken out into a Base Bid, Alternate No. 1 and Alternate No. 2 as indicated on the Drawings.
05/19/2026 07:00 PM UTC
26-27-2
St. Tammany Parish Library-Mandeville Branch Reno------------------------------------------St. Tammany Parish Government requires a contractor to perform renovations to the existing Mandeville Branch Library. The project includes improvements to both the exterior and interior of the facility as indicated in the bid documents. The work shall be broken out into a Base Bid and Alternates, as indicated in the drawings.
06/03/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
010-07-17-29-2
2017 Official Journal
04/13/2017 07:00 PM UTC
010-01-17-25-2
SUV Chevrolet Suburban
04/13/2017 02:39 PM UTC
314-00-17-21-2
2017 Districts 8, 13 & 14 Panel Replacements - This is a District Capital Panel Replacement Project for Districts 8, 13, & 14. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by removing and replacing various concrete panels and rollover curbs as specified along Devonshire Dr. (R08V039) Section 32 Township 6S Range 12E ; Hampton Ln (R08V042) Section 24 Township 9S Range 14E; Lake Superior Dr. (R08L047) Section 31 Township 8S Range 15E; Lake Michigan Dr. (R08L050) Section 31 Township 8S Range 15E; Montgomery Blvd (R08V044) Section 24 Township 9S Range 14E ; and Shylock Dr. (R08V059) Section 32 Township 6S Range 12E.
04/12/2017 07:00 PM UTC
460-00-17-24-2
Safe Haven Handicap Day Center Rehab.......Site,Exterior and interior renovations to an existing building. Work to include, but not limited to civil, architectural, mechanical and electrical labor as indicated on construction documents.
04/12/2017 07:00 PM UTC
304-00-17-19-2
2017 District 1&4 Road Improvements................This is a District Capital Road Improvement project for Districts 1 & 4. The Contractor must provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing and/or milling and overlaying roads as specified along Oak Park Dr. (R01I004) Section 16 Township 8S Range 10E; Perrilloux Rd (R01I001) Section 16 Township 7S Range 10E; Wager Cemetery Rd (R01I002) Section 9 Township 7S Range 10E; Black River Dr. (R01J042) Section 42 Township 7S Range 10E. The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law.
04/11/2017 07:00 PM UTC
318-00-17-23-2
Fairgrounds Phase 3
04/11/2017 07:00 PM UTC
307-00-17-14-2
Wax Wing Canal Improvements --------------------- The Contractor must provide all labor, equipment, tools, and materials necessary to improve drainage by grading banks to proper slope and installing armormax anchored reinforced vegetation system as specified along Wax Wing Canal (D04EW01174) Section 55 Township 8S Range 11E.
04/07/2017 07:00 PM UTC
303-00-17-10-2
2017 District 3 Road Improvements ------ This is a District Capital Road Improvement Project for District 3. The work specified in this project will require the Contractor to provide all labor, equipment, tools, and materials necessary to improve road surfaces by reconstructing them as specified along Birch Dr (R02K026) Section 21 Township 5S Range 10E; Gottschalk Rd (R01A002) Section 19 Township 6S Range 10E; N Hay Hollow (R02F027) Section 4 Township 5E Range 10E; Penn Mill Lakes Blvd (R03D031) Section 13 Township 6S Range 10E; and Savannah Rd (R01G001) Section 4 Township 7S Range 10E.
04/04/2017 07:00 PM UTC
307-00-17-22-2
2017 District 7 Road Improvements-----------This is a District Capital Road Improvement Project for District 7. The Contractor must provide all labor, equipment, tools, and materials necessary to improve by reconstructing and/or milling and overlaying road surfaces as specified along Cedar Dr. (R04F038) Section 7 Township 7S Range 12E; Elm St (R04F039) Section 7 Township 7S Range 12E; Hemlock Dr. (R04F037) Section 7 Township 7S Range 12E; Joans St (R04E056) Section 1 Township 8S Range 11E; Labarre St (R04E026) Section 38 Township 8S Range 11E; and Redwood Dr. (R04F040) Section 7 Township 7S Range 12E . The Parish reserves the right to add, remove or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of the project is sixty (60) calendar days + Calculated Rain Days per attached specifications.
04/04/2017 07:00 PM UTC
015-05-17-17-2
Road Signs
03/23/2017 07:00 PM UTC
701 - 710 of 960 Solicitations
1 2 67 68 69 71 73 74 75 95 96