General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
9593PlanHolders04012026.pdf (90 KB)
Contract 9593 - Pressure Zone 4 Crossing
9694PlanHolders04012026.pdf (90.3 KB)
Contract 9694 - Warner & Worthington Park Courts
9726PlanHolders04012026.pdf (97.4 KB)
Contract 9726 - Country Grove Singletrack Trail
9740PlanHolders04012026.pdf (96.7 KB)
Contract 9740 - Unit Well 12 Upgrade
9751PlanHolders04012026.pdf (86.4 KB)
Contract 9751 - 2026 Parking Garage Maintenance
9757PlanHolders04012026.pdf (88.3 KB)
Contract 9757 - Imagination Center Fiber
9766PlanHolders04012026.pdf (88.9 KB)
Contract 9766 - Metro Transit Kennedy Bus Charger
8 Documents

Upcoming Solicitations

Number Deadline
9740 - Unit Well 12 Upgrade
The project includes reconstruction of the existing Unit Well 12 Wellhouse and Reservoir.
04/02/2026 07:00 PM UTC
9593 - Pressure Zone 4 Interstate Crossing
Work under this contract generally consists of installing 6-inch, and 12-inch ductile iron water main, fittings, valves and hydrants by open-cut and/or horizontal directional drilling methods and installing 16-inch water main and fittings by horizontal directional drilling methods. The total water main installation comprises approximately 3600-LF of new pipe.
04/02/2026 07:00 PM UTC
9694 - Warner Park Pickleball Courts and Worthington Park Futsal Court
This project involves improvements to both Warner Park and Worthington Park. The improvements at Warner Park consist of removing existing sports light poles, removing pavement, installing asphalt pavement, installing fencing, gates, net posts and nets, sport court finishing and striping, installing a stormwater basin, and site restoration to construct an eight (8) court complex. The improvements at Worthington Park consist of removing pavement, pulverizing/shaping existing asphalt, installing new asphalt pavement, installing a Mini-Pitch system, sport court finishing and striping, replacing a storm sewer and lateral, installing a pavement storm sewer, and site restoration to construct one (1) futsal court.
04/02/2026 07:00 PM UTC
9757 - Imagination Center Fiber Connection
A new fiber connection between an existing splice point on corner of E Washington Ave and Thierer Rd, and the newly constructed Imagination Center at Reindahl Park facility at 1818 Portage Road. The new duct will be a single 3” duct with a single 48-strand fiber optic cable.
04/02/2026 07:00 PM UTC
9751 - 2026 Parking Garage Maintenance
This work covers repairs at the Capitol Square North (CSN), State Street Capitol (SSCo), South Livingston Street (SLS), and Wilson Street Garage (WSG) parking ramps in Madison, Wisconsin. Work includes concrete repair of slabs, columns, beams, sealant replacement at slab cracks and joints, membrane repair and replacement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, welding of steel and demoing/installation of new or replacement concrete.
04/02/2026 07:00 PM UTC
9766 - Metro Transit Kennedy Road On-Route Bus Charger
The work under this contract shall include, but is not limited to, construction of foundation for overhead bus charger, a building (restroom and electrical facilities), concrete pavement, HMA pavement, pavement resurfacing, curb and gutter, sidewalk, grading, storm sewer, sanitary sewer, water, electrical, pavement marking, signs and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.
04/23/2026 07:00 PM UTC
9726 - Country Grove Singletrack Trail Improvements
This project constructs up to 6872 linear feet of off-road, bike optimized, single track trail in Country Grove Park and adjacent greenways.
05/21/2026 07:00 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
8698 - REPAIRING AND SEALING PAVEMENT CRACKS - LOCAL STREETS 2023
8698 - REPAIRING AND SEALING PAVEMENT CRACKS - LOCAL STREETS 2023
03/09/2023 08:00 PM UTC
8700 - Chip Sealing 2023 - East
8700 - Chip Sealing 2023 - East
03/09/2023 08:00 PM UTC
8699- Repairing and Sealing Pavement Crack - Major Streets 2023
8699- Repairing and Sealing Pavement Cracks - Major Streets 2023
03/09/2023 08:00 PM UTC
9279 - 2023 Rennebohm Park Inclusive Playground
Installation of new playground equipment, benches, poured-in-place rubber playground surfacing, concrete curb edge restraint, asphalt paths and associated site and playground amenities at Rennebohm Park.
02/23/2023 08:00 PM UTC
8703 - RESURFACING 2023 - ASPHALT PAVEMENT PULVERIZING, MILLING & PAVING
Pulverizing, milling, and paving various streets that are included with the resurfacing program. This contract also includes surface paving of several subdivisions that includes wedge cut grinding butt joints and around SASs, street sweeping, tack and adjusting valve boxes to grade. This contractor shall be required to coordinate with the other contractors performing work on the resurfacing program contracts.
02/23/2023 08:00 PM UTC
8702 - Resurfacing 2023 - Curb & Gutter and Castings
Replacement of curb and gutter, drive aprons, sidewalk ramps included truncated domes (supplied by City of Madison) and adjusting inlets and castings (supplied by City of Madison) in advance of pavement pulverizing/milling and paving. This contractor shall be required to coordinate with the other contractors performing work on the resurfacing program contracts.
02/23/2023 08:00 PM UTC
8704 - RESURFACING 2023 - ASPHALT BASE PATCHING AND BASE PATCH GRINDING
Work included in this contract is asphalt base patching, patch by grind (mill/overlay), citywide, and infrared patching. Contractor may be required to replace temporary patches with permanent HMA patches. On streets that have a pavement rating greater than 6 and on collector and arterial streets patches shall then have the limit extended by mill and overlay per the established patching criteria.
02/23/2023 08:00 PM UTC
9270 - 2023 Penn Park Courts
Construction of new basketball courts and mini-pitch at Penn Park.
02/23/2023 08:00 PM UTC
8697 - Annual Horizontal Sawcutting of Concrete Sidewalk & Incidental Work (District 12) - 2023
Perform repair work primarily throughout the 12th Aldermanic District. Additional horizontal sawcutting/grinding may be required within the project limits of City of Madison Reconstruction Projects and may be city wide, primarily west of Park St, as part of the Sidewalk Request Program.
02/23/2023 08:00 PM UTC
8715 - Lake Mendota Drive Assessment District - 2023
Replacement and installation of new storm sewer pipes and structures, installation of concrete sidewalk and curb and gutter, replacement of asphalt pavement, and replacement of driveway aprons.
02/23/2023 08:00 PM UTC
191 - 200 of 1082 Solicitations
1 2 16 17 18 20 22 23 24 108 109