General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9439 - Mendota Grassman Greenway Flood Mitigation and Restoration Design
Mendota Grassman Greenway Flood Mitigation and Restoration Design
06/08/2023 07:00 PM UTC
8707 - John Nolen Bridge Repairs - 2023
Furnishing and installing: expansion bearing support bracket, expansion bearing assembly, wedging existing bearings, non-structural repairs to the prestressed girder elements, rehabilitation of the sidewalk expansion joints, and all incidental items necessary to complete the work as shown on the plans and included in special provisions.
06/08/2023 07:00 PM UTC
9317 - 2023 Parking Garage Maintenance
This work covers repairs at seven City-owned parking ramps and garages. Work includes concrete repair of slabs, columns, beams, and stairs, joint repairs, sealant replacement at slab cracks and joints, precast connection repair, expansion joint replacement, membrane repair and placement, grit-blasting and painting of reinforcing and architectural steel and/or concrete, placement of new structural concrete, repair of architectural components (brick, façade connections, masonry, etc.), installation of new or replacement concrete connections/anchors, and welding of steel.
05/25/2023 07:00 PM UTC
9319 - CIPP Water Main Rehab 2023 Fish Hatchery Road/Lake Mendota Drive
Rehabilitation of water mains to be completed by lining existing water mains with a Class IV structural cured-in-place pipe (CIPP), certified for the conveyance of drinking water. Temporary water service is to be provided to all affected properties during the rehabilitation of water mains.
05/25/2023 07:00 PM UTC
8566 - Davies Street and Dempsey Road Reconstruction Assessment District - 2023
Replacement and upgrade of sanitary sewer and laterals, water main and services, storm sewer pipes and structures, as well as the installation and replacement of concrete sidewalk, concrete curb & gutter, concrete driveway aprons, asphalt driveways, asphalt shared-use path, asphalt pavement, roadway base, path and street lighting, and pavement markings.
05/11/2023 07:00 PM UTC
9320 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
05/04/2023 07:00 PM UTC
9298 - 2023 West Parks Playground Replacements
Installation of new playground equipment, benches, playground safety surfacing, asphalt paths and associated sitework at three City of Madison parks locations. The General Contractor and subcontractor must be prequalified in Category 262, Playground Equipment Installer.
05/04/2023 07:00 PM UTC
9245 - Door Creek Park Shelter
Door Creek Park Shelter
04/20/2023 07:00 PM UTC
8721 - W. Main Street Bike Boulevard Improvements
Construction of W. Main Street Bike Boulevard Improvements, including pedestrian and bicycle crossing improvements at W. Main St. and Proudfit St.
04/20/2023 07:00 PM UTC
9313 - Madison Senior Center Courtyard
Renovation of the Madison Senior Center Courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials. The project also includes lighting and storm sewer.
04/20/2023 07:00 PM UTC
191 - 200 of 1107 Solicitations
1 2 16 17 18 20 22 23 24 110 111