General Info

Business Logo

City of Madison

210 Martin Luther King Jr Blvd, Madison, WI 53703-3340
(608) 266-4620


Standard Documents

Name * Description
How to find bid results.pdf (78.7 KB)
How To Find Bid Results
8829PlanHolders05222026.pdf (84 KB)
Contract 8829 - Sidewalk Curb & Gutter 2026
8830PlanHolders05222026.pdf (88.2 KB)
Contract 8830 - Bridge Repairs - 2026
9787PlanHolders05222026.pdf (85.9 KB)
Contract 9787 - Newville Park Redevelopment
4 Documents

Upcoming Solicitations

Number Deadline
8830 - Bridge Repairs - 2026
The work under this contract shall include, but is not limited to concrete deck repairs, expansion joint replacement, expansion plate replacement, polymer overlay, guardrail installation, storm sewer pipe and structure installation, excavation, gravel base course, asphalt pavement, concrete curb & gutter, concrete sidewalk, shared-use path installation, soil restoration, and pavement markings.
06/04/2026 07:00 PM UTC
8829 - Sidewalk, Curb & Gutter, and Concrete Pavement Patches, Citywide Installation and Repair - 2026
The Contractor shall perform work at various locations throughout the City, as ordered by the Common Council, or as directed by the Engineer. This work includes replacing defective sidewalk and curb and gutter, concrete pavement repairs, sidewalk ramps including detectable warning fields (supplied by the Contractor), Metro Transit bus pads, and other associated work. A list of approved locations and detail drawings are included with these Special Provisions. The list, however, is not a final list. Additional locations may be added.
06/04/2026 07:00 PM UTC
9787 - Newville (Kenneth) Park Redevelopment
This project consists of installation of new game equipment, benches, concrete paths, grading and preparation of landscape beds at Newville (Kenneth) Park.
06/11/2026 07:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
9306 - 2023 Penn Park Courts
Installing asphalt pavement, including base course for path and courts, installing fencing, basketball hoops, mini-pitch system, and sport court finishing, striping and site restoration to construct two (2) basketball courts and a mini-pitch at Penn Park.
04/20/2023 07:00 PM UTC
8300 - W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
W. Wilson Street and S. Broom Street Assessment District - 2021 and S. Henry Street Assessment District - 2023
04/20/2023 07:00 PM UTC
9312 - Truax Lift Station Replacement
Truax Lift Station Replacement
04/20/2023 07:00 PM UTC
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
9226 - Phase 2 of CCB City Office Remodels, First and Fifth Floors
04/06/2023 07:00 PM UTC
9240 - Fire Station 4 Lighting Retrofit
Fire Station 4 Lighting Retrofit
04/06/2023 07:00 PM UTC
8642 - West Towne Path - Phase 3
Construction of the West Towne Path – Phase 3 from S Junction Road to Commerce Drive, City of Madison. State Project Number is 5992-00-62 (City Project Number is 13014). The project includes the construction of an off-street path on the north-side of Watts Road and Plaza Drive, including reconstruction of the north-side curb and sidewalk to fit the path. The project also includes curb ramps and median island improvements at intersections throughout the project limits.
04/06/2023 07:00 PM UTC
9249 - Madison Senior Center Courtyard
Renovation of the courtyard including demolition of existing features, protection of existing trees, full-depth pavement removals, light fixture removal, storm sewer demolition, excavation, base preparation, footings, concrete pavements, poured in place rubber surfacing, vertical curbing, specialty and pre-manufactured furnishings and features, and landscaping installation including plants, sod, mulches and miscellaneous landscape accessory materials; the project also includes lighting and storm sewer.
03/09/2023 08:00 PM UTC
9285 - CIPP UV Lining Rehabilitation of Sanitary Sewers West Phase 1 - 2023
Trenchless rehabilitation of approximately 12,653 linear feet of sanitary sewer piplelines ranging in size from 6" to 8" diameter using Ultraviolet light cure CIPP system. Prequalification in Category #399 UV Sewer Lining is required.
03/09/2023 08:00 PM UTC
9286 - CIPP UV Lining Rehabilitation of Sanitary Sewers East Phase 1 - 2023
Trenchless rehabilitation of approximately 8,406 linear feet of sanitary sewer pipelines ranging in size from 8" to 18" diameter using Ultraviolet light cure CIPP system. Contractor performing work is required to be prequalified under Category #399, UV Sewer Lining.
03/09/2023 08:00 PM UTC
8875 - Lower Badger Mill Creek Flood Mitigation
Work includes, but is not limited to: Clearing & grubbing, channel excavation, pond excavation and dredging, maintenance path base course, installation of storm pipe and structures, installation of box culvert wingwalls and apron, bridge construction, and restoration.
03/09/2023 08:00 PM UTC
201 - 210 of 1107 Solicitations
1 2 17 18 19 21 23 24 25 110 111