General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 24-2-2017
PROJECT NO. 2: COMBINED SEWER MAIN RELAY AND SANITARY, COMBINED, AND STORM SEWER LINING AND MANHOLE REPAIR AND LINING Located at: S. 24th St. - W. Tripoli Ave. to W. Howard Ave. S. Layton Blvd./S. 27th St. - W. Grant St. to 206'+/- North of W. Harrison Ave. S. 53rd St. - W. Ohio Ave. to W. Nebraska Ave. S. 82nd St. - W. Holt Ave. to W. Morgan Ave. S. Layton Blvd. - W. Pierce St. to W. National Ave. S. Layton Blvd. - 200' N. of W. Evergreen Ln. to W. Evergreen Ln. S. Vermont Ave. - E. Oklahoma Ave. to E. Rhode Island Ave. S. Wentworth Ave. - E. Texas Ave. to E. Oklahoma Ave.
04/19/2017 03:30 PM UTC
OFFICIAL NOTICE 43-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS ( 6”, 7”, & 8”) CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.;Located at: ST211150162 - S. 85th St. - W. Morgan Ave. to W. Holt Ave. ST211150110 - S. 82nd St. - W. Morgan Ave. to W. Holt Ave.
04/18/2017 03:30 PM UTC
OFFICIAL NOTICE 41-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211070101 - N. 63rd St. - W. Nash St. to a pt. 450' n/o W. Nash St. ST211070102 - N. 64th St. - W. Nash St. to a pt. n/o W. Nash St. ST211080104 - W. Nash St. - N. 62nd St. to a pt. 150' w/o of N. 64th St.
04/17/2017 03:30 PM UTC
OFFICIAL NOTICE 39-1-2017
This project involves the Traffic Deck Recoating and Repairs of Parking Levels 4-8 at the 2nd & Plankinton Parking Structure located at 724 North 2nd Street Milwaukee, WI 53203.
04/13/2017 03:30 PM UTC
OFFICIAL NOTICE 45-1-2017
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors (100 working days). Locations will be at various sites throughout the City of Milwaukee.
04/12/2017 03:30 PM UTC
OFFICIAL NOTICE 50-1-2017
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL CONSISTING OF A MIXTURE OF EMULSIFIED ASPHALT, MINERAL AGGREATE AND WATER, PROPERLY PROPORTIONED, MIXED AND SPREAD EVENLY ON THE SURFACE AS SPECIFIED AND DIRECTED, ETC.; (ST211160119) - Various street locations within the City of Milwaukee
04/12/2017 03:30 PM UTC
OFFICIAL NOTICE 23-1-2017
SANITARY MANHOLE REHABILITATION in: Various Locations
04/11/2017 03:30 PM UTC
OFFICIAL NOTICE 23-2-2017
PROJECT NO. 2: VARIOUS LOCATIONS IN SYSTEM 3016 (SEWER EXAM CONTRACT) Various Locations in System 3016 Plan File(s): 246-78, 246-79, 246-80, 246-81, 246-82, 246-83, 246-84, 246-85, 246-86, 246-87, 246-88, 246-89, 246-90, 246-91, 246-92, 246-93 and 246-94 Dated: March 22, 2017 Project ID: SM495160069 **Attendance at a Pre-Bid meeting on Friday, April 7th, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
04/11/2017 03:30 PM UTC
OFFICIAL NOTICE 47-1-2017
Water Main Relays, in the following locations: W. Beckett Ave. (WT410170678), W. Glendale Ave. to W. Courtland Ave. (29 working days); N. 81st St. (WT410170679), W. Courtland Ave. to W. Hampton Ave. (18 working days); N. 80th St. (WT410170680), W. Courtland Ave. to W. Hampton Ave. (19 working days); W. Courtland Ave. (WT410170681), N. 77th St. to W. Beckett Ave. (44 working days); N. 78th St. (WT410170682), W. Arden Pl. to 400’ N/O W. Courtland Ave. (39 working days); N. 79th St. (WT410170683), W. Courtland Ave. to W. Hampton Ave. (20 working days) (Note: Contractor to furnish and install approx. 5913 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
04/05/2017 03:30 PM UTC
OFFICIAL NOTICE 29-1-2017
Recycling of Residential Electronic Materials. The work in this project includes provisions for Collection, Transportation, Processing, recycling, and disposal of residential electronic materials for recovery of resources and diversion from landfill and to comply with all local and state laws. Companies responding to this bid shall review and comply with the requirements specified in the bid.
04/03/2017 03:30 PM UTC
1061 - 1070 of 1601 Solicitations
1 2 103 104 105 107 109 110 111 160 161