The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 25-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211150102) - N. 70th St. - 1000' +/- s/o W. Glenbrook Rd. to W. Glenbrook Rd. (ST211150159) - W. Fairmount Ave. - N. 107th St. to N. 108th St. (ST211150134) - N. 91st St. - W. Center St. to W. Locust St.
04/14/2016 03:30 PM UTC
OFFICIAL NOTICE 43-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Whitaker Ave. (WT410160604), S. 20th St. to S. Louisiana Ave. (22 Working Days); S. 25th St. (WT410160614), W. Holt Ave. to W. Warnimont Ave. (32 Working Days); S. 26th St. (WT410160615), W. Ohio Ave. to W. Holt Ave. (16 Working Days); W. Euclid Ave. (WT410160616), S. 22nd St. to S. 23rd St. (9 Working Days); W. Warnimont Ct. (WT410160622), S. 68th St. to 160ft West of S. 68th St. (10 Working Days); W. Dodge Pl. (WT410160623), 70ft Southeast of W. Wilbur Ave. to 570ft Southeast of W. Wilbur Ave. (19 Working Days); W. Tripoli Ave. (WT410160668), S. 67th St. to S. 68th St. (17 Working Days).
04/08/2016 03:30 PM UTC
OFFICIAL NOTICE 49-1-2016
CONCRETE REPLACEMENT SERVICES VARIOUS SITES MILWAUKEE, WI
04/05/2016 03:30 PM UTC
OFFICIAL NOTICE 40-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Thurston Ave. (WT410160638), N. 71st St. to N. 72nd St. (16 Working Days); N. 71st St. (WT410160639), W. Thurston Ave. to W. Bobolink Ave. (26 Working Days); N. 63rd St. (WT410160640), W. Bobolink Ave. to W. Florist Ave. (16 Working Days); N. 67th St. (WT410160641), W. Bobolink Ave. to W. Florist Ave. (17 Working Days); N. 65th St. (WT410160642) W. Carmen Ave. to W. Florist Ave. (32 Working Days); N. 62nd St. (410160643), W. Carmen Ave. to W. Bobolink Ave. (17 Working Days); W. Bobolink Ave. (WT410160644), N. 64th St. to N. 65th St. (11 Working Days)
04/01/2016 03:30 PM UTC
OFFICIAL NOTICE 41-1-2016
COMBINED SEWER MAINS RELAY in: E. Chicago St. – N. Milwaukee St. to N. Jackson St. N. Jefferson St. – E. Buffalo St. to E. St. Paul Ave.
03/31/2016 03:30 PM UTC
OFFICIAL NOTICE 27-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (TD04284001) - W. Medford Ave. - W. Congress St. to N. 68th St. (TID-42)
03/30/2016 03:30 PM UTC
OFFICIAL NOTICE 21-1-2016
This project involves the center lock replacement at the Water Street Bascule Bridge over the Milwaukee River.
03/29/2016 03:30 PM UTC
OFFICIAL NOTICE 12-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211140107) - S. 71st St. - W. Kinnickinnic River Pkwy. to W. Cleveland Ave.
03/28/2016 03:30 PM UTC
OFFICIAL NOTICE 42-1-2016
Stump Grinding, Removal, and Site Restoration in the North District Service Area. North District Service Area: Capital Drive North to City Limits.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 42-2-2016
Stump Grinding, Removal, and Site Restoration in the Central District Service Area. Central District Service Area: Interstate I-94 North to Capital Drive.
03/23/2016 03:30 PM UTC
1061 - 1070 of 1476 Solicitations