General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 7-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 7-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216160106) - Asphalt Overlays located at: N. 51st Blvd. - W. Capitol Dr. to W. Hampton Ave., W. Roosevelt Dr. - N. 36th St. to W. Fond Du Lac Ave.
03/02/2016 04:30 PM UTC
OFFICIAL NOTICE 16-1-2016
7TH DISTRICT POLICE STATION RTUs REPLACEMENT 3626 WEST FOND DU LAC AVENUE MILWAUKEE WI
03/01/2016 04:30 PM UTC
OFFICIAL NOTICE 6-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160105) - N. 6th St. - W. Walnut St. to W. North Ave., W. Atkinson Ave. - W. Keefe Ave. W. Teutonia Ave., W. Garfield Ave. - N. 7th St. to N. 8th St.
02/26/2016 04:30 PM UTC
OFFICIAL NOTICE 6-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160105) - N. 6th St. - W. Walnut St. to W. North Ave., W. Atkinson Ave. - W. Keefe Ave. W. Teutonia Ave., W. Garfield Ave. - N. 7th St. to N. 8th St.
02/26/2016 04:30 PM UTC
OFFICIAL NOTICE 3-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160102) - N. 51st St. - W. Center St. to W. Burleigh St., N. 85th St.-W. Capitol Dr. to W. Olive St., N. 86th St.-W. Capitol Dr. to W. Fiebrantz Ave., N. 87th Ct. - W. Fiebrantz Ave. to pt. N/o W. Fiebrantz Ave., N. 88th St. - W. Fiebrantz Ave. to W. Olive St., N. 92nd St. - W. Lisbon Ave. to W. Capitol Dr., N. Colgate Cir. - W. Fiebrantz Ave. to N. 88th St., W. Olive St. - N. 85th St. to N. 89th St., W. Villard Ave. - N. Sherman Blvd. to N. 51st Blvd.
02/25/2016 04:30 PM UTC
OFFICIAL NOTICE 3-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160102) - N. 51st St. - W. Center St. to W. Burleigh St., N. 85th St.-W. Capitol Dr. to W. Olive St., N. 86th St.-W. Capitol Dr. to W. Fiebrantz Ave., N. 87th Ct. - W. Fiebrantz Ave. to pt. N/o W. Fiebrantz Ave., N. 88th St. - W. Fiebrantz Ave. to W. Olive St., N. 92nd St. - W. Lisbon Ave. to W. Capitol Dr., N. Colgate Cir. - W. Fiebrantz Ave. to N. 88th St., W. Olive St. - N. 85th St. to N. 89th St., W. Villard Ave. - N. Sherman Blvd. to N. 51st Blvd.
02/25/2016 04:30 PM UTC
OFFICIAL NOTICE 2-1-2016
PROJECT NO. 1: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, located at: (ST216160101) - N. 60th St. - W. Appleton Ave. to W. Burleigh St., N. 81st St. - W. Calumet Rd. to W. Bradley Rd., N. 84th St. - W. Florist Ave. to W. Mill Rd., N. 87th St. - W. Bradley Rd. to W. Tower Ave., N. 100th St. - South of W. Hampton Ave. to W. Hampton Ave., W. Calumet Rd. - N. 76th St. to N. 91st St., W. Mill Rd. - Hwy 41 (W. Appleton Av.) to City Limits (N. 124th St.)
02/24/2016 04:30 PM UTC
OFFICIAL NOTICE 2-2-2016
PROJECT NO. 2: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, located at: (ST216160101) - N. 60th St. - W. Appleton Ave. to W. Burleigh St., N. 81st St. - W. Calumet Rd. to W. Bradley Rd., N. 84th St. - W. Florist Ave. to W. Mill Rd., N. 87th St. - W. Bradley Rd. to W. Tower Ave., N. 100th St. - South of W. Hampton Ave. to W. Hampton Ave., W. Calumet Rd. - N. 76th St. to N. 91st St., W. Mill Rd. - Hwy 41 (W. Appleton Av.) to City Limits (N. 124th St.)
02/24/2016 04:30 PM UTC
OFFICIAL NOTICE 18-1-2016
COMBINED SEWER MAINS LINING, REPAIR AND MANHOLE REPAIR & LINING in: W. Keefe Ave. (N/S) – N. 17th St. to N. 22nd St & W. Keefe Ave. (S/S) – N. 17th St. to 40’ +/- W. of N. 24th Pl. **Attendance at a Pre-Bid meeting on Tuesday, February 16, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification documentation is required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on February 16, 2016.
02/23/2016 04:30 PM UTC
1061 - 1070 of 1449 Solicitations
1 2 103 104 105 107 109 110 111 144 145