General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE NO. 97
7” & 9” CONCRETE DRIVEWAYS, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, AND SEWER WORK, ETC., located at: (ST211150106) S. 2nd St. – W. Edgerton Ave. to Pt. 800’ N. of W. Vogel Ave.
08/27/2015 03:30 PM UTC
OFFICIAL NOTICE NO. 99
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC, located at: (ST211140132) N. 72nd St. - W. Congress St. to W. Hampton Ave.; (ST211150149) N. Norwood Pl., W. Philip Pl., & N. 57th St.
08/27/2015 03:30 PM UTC
OFFICIAL NOTICE NO. 100
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 9” REINFORCED CONCRETE PAVEMNT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, AND SEWER WORK, ETC., located at (ST212150102) Alley: W. Lakefield Dr.,W. Ohio Av.,W. Ruskin St., S. 35th St., S. 36th St., S. 37th St.; (ST211140182) W.Garfield Ave. @ N. 7th St.; (ST211150201) N. 22nd St. at W. Galena St.; (ST212150104) Alley: N. Bartlett Av., E. Kenwood Bld., E. Linnwood Av., N. Oakland Av.
08/26/2015 03:30 PM UTC
OFFICIAL NOTICE 121-1-2015
2ND AND PLANKINTON PARKING STRUCTURE WEST ELEVATOR MODERNIZATION 724 NORTH 2ND STREET MILWAUKEE WI
08/21/2015 03:30 PM UTC
OFFICIAL NOTICE 107-1-2015
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC, located at: (ST211140140) W. Medford Ave. - W. Hampton Ave. to W. Grantosa Dr.
08/21/2015 03:30 PM UTC
OFFICIAL NOTICE 104-1-2015
FURNISHING PLOW TRUCKS AND OPERATORS FOR THE SUPPLEMENTAL CITY-WIDE SNOW PLOWING FROM CITY STREETS in the City of Milwaukee
08/20/2015 03:30 PM UTC
OFFICIAL NOTICE 124-1-2015
Lincoln Avenue Vehicle Storage Garage HVAC System Replacement 3921 West Lincoln Avenue Milwaukee, WI
08/18/2015 03:30 PM UTC
OFFICIAL NOTICE 98-1-2015
CONSTRUCTION OF 8” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, AND ETC, located at: (ST211150103) W. Wells St. - N. 45th Pl. to N. Hawley Rd.
08/14/2015 03:30 PM UTC
OFFICIAL NOTICE 110-1-2015
WATER MAIN RELAYS, located at the following locations: Water Main Relays – N. 75th St. (WT410140633), W. Congress St. to W. Derby Pl. (65 Working Days); W. Derby Pl. (WT410140634), N. 74th St. to N. 75th St. (9 Working Days); N. 74th St. (WT410140635), W. Glendale Av. to W. Courtland Av. (22 Working Days); W. Potomac Av. (WT410140643), W. Courtland Av. to W. Derby Pl. (13 Working Days)
08/07/2015 03:30 PM UTC
OFFICIAL NOTICE 111-1-2015
R-168: RIVERSIDE ROAD REPLACEMENT AND FLOOD PREVENTION PROJECT LOCATED AT 1311 EAST CHAMBERS ST, MILWAUKEE, WI 53212
08/03/2015 03:30 PM UTC
1261 - 1270 of 1601 Solicitations
1 2 123 124 125 127 129 130 131 160 161