General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
OFFICIAL NOTICE 76-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” AND 8” CONCRETE BASE, 8” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH COLORED CONCRETE, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, SEALING PAVEMENT JOINTS AND CRACKS, VARIOURS TRAFFIC SIGNAGE ASSEMBLY AND INSTALLATION, GRAVEL FILLING, CONCRETE REMOVALS, VARIOUS PAVEMENT MARKINGS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211220233 – In West Adler Street - South Hawley Road to South 68th Street
08/26/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 106-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211140123) N. 52nd St. – W. Nash St. to W. Capitol Dr.
09/26/2014 03:30 PM UTC
OFFICIAL NOTICE 113-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, ROADWAY CUTTING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SODDING, ETC. located at (ST211130183) N. 55th St. – W. Vienna Ave. to W. Melvina St.
09/25/2014 03:30 PM UTC
OFFICIAL NOTICE 120-1-2014
COMBINED SEWER MAINS RELAY IN: S. 31st St. – W. Scott St. to W. Greenfield Ave. and S. 33rd St. – W. Greenfield Ave. to W. Branting Ln.
09/24/2014 03:30 PM UTC
OFFICIAL NOTICE 108-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140119) W. Spokane St. – N. 60th St. to N. 64th St.; (ST211140147) N. 91st St. – W. Locust St. to W. Burliegh St.; (ST211140148) W. Florist Ave. – N. 55th St. to N. 60th St.
09/23/2014 03:30 PM UTC
OFFICIAL NOTICE 105-1-2014
CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC PAVEMENT, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140150) E. Erie St. at E. Menomonee St., E. Menomonee St. – N. Broadway to E. Erie St.; (ST211140156) N. Water St. at E. Pearson St. (Marsupial bridge area access); (ST211140158) W. Clybourn St. – a point east of N. 16th St. to N. 16th St. (median)
09/22/2014 03:30 PM UTC
OFFICIAL NOTICE 84-1-2014
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, PAVEMENT REMOVAL, CUTTING, CRUSHED STONE BASE, PERMEABLE PAVERS, ETC. located at (ST212140127) Alley betw W. Hope Ave, W. Marion St., N. 61st St, and N. 62nd St (Permeable alley); (ST212020110) Alley betw W. Appleton Av, W. Congress St, W. Hope Ave, W. Potomac Ave and N. 80th St (N/S Leg) (Permeable alley); (ST212140124) Alley betw W. Hadley St, W. Locust St, N. 81st St and N. 82nd St. (Permeable alley); (ST212140120) Alley betw W. Center St, N. Grant Bl, W. Hadley St and N. Sherman Bl. (Permeable alley)
09/18/2014 03:30 PM UTC
OFFICIAL NOTICE 109-1-2014
CONSTRUCTION OF 7” CONCRETE PAVEMENT, PAVEMENT REMOVAL, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, 6” POROUS WALK, ETC. located at (ST211140126) N. Pinecrest St. – N. Story Pkwy to N. 49th St. (Permeable Sidewalk)
09/17/2014 03:30 PM UTC
OFFICIAL NOTICE 119-1-2014
COMBINED SEWER MAINS RELAY AND LINING AND MANHOLE LINING AND REPAIR IN: E. Knapp St. - N. Van Buren St. to N. Astor St. & N. Van Buren St. - 100'+/- S. of E. Juneau Ave. to E. Knapp St.
09/16/2014 03:30 PM UTC
OFFICIAL NOTICE 119-2-2014
COMBINED SEWER MAINS RELAY AND LINING, STORM SEWER MAINS INSTALLATION, AND MANHOLE LINING AND REPAIR IN: N. Bremen St. – E. Center St. to E. Hadley St., N. Bremen St. – E. Hadley St. to E. Locust St., N. Cambridge Ave. – E. Locust St. to 455’± North of E. Locust St., E. Hadley St. – N. Holton St. to N. Humboldt Blvd., N. Holton St. – E. Hadley St. to E. Chambers St., N. Humboldt Blvd. – E. Clarke St. to 200’± South of E. Center St., E. Locust St. – N. Holton St. to N. Pierce St., E. Locust St. – N. Cambridge Ave. to N. Newhall St., and N. Pierce St. – E. Hadley St. to E. Locust St.
09/16/2014 03:30 PM UTC
OFFICIAL NOTICE 110-1-2014
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, ETC. located at (ST211140151) S. 35th St. – a pt. south of W. Burnham St. to W. Mitchell St.
09/16/2014 03:30 PM UTC
1271 - 1280 of 1492 Solicitations
1 2 124 125 126 128 130 131 132 149 150