City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 63-2-2019
SANITARY SEWER MAIN LINING AND REPAIR & SANITARY MANHOLE LINING AND REPAIR IN: AREA BOUNDED BY SOUTH 43RD STREET TO SOUTH 52ND PLACE FROM WEST LINCOLN AVENUE TO WEST OKLAHOMA AVENUE
04/30/2019 03:30 PM UTC
OFFICIAL NOTICE 61-1-2019
Water Main Relays at the following locations: S. 24th St. (WT410190638), W. Barnard Av. to W. Carpenter Av. (18 working days); S. 91st St. (WT410190683), W. Wilbur Av. to W. Crawford Av. (17 working days); S. 90th St. (WT410190684), W. Wilbur Av. to W. Crawford Av. (18 working days); S. 89th St. (WT410190685), W. Warnimont Av. to W. Crawford Av. (34 working days); S. 89th St. (WT410190686) W. Morgan Av. to W. Crawford Av. (48 working days). (Note: Contractor to furnish & install approx. 5,252 lin. ft. of 12", 8", 6", 4", & 3" D.I. pipe. City to furnish misc. materials as shown on plans & proposal form.)
04/29/2019 03:30 PM UTC
OFFICIAL NOTICE 43-1-2019
MacArthur Square Parking Structure Lower Plaza Façade Repairs
04/26/2019 03:30 PM UTC
OFFICIAL NOTICE 4-1-2019
COMBINED SEWER MAIN RELAY AND STORM SEWER MAIN LINING AND MANHOLE REPAIR & LINING in: E. Juneau Ave. – N. Astor St. to N. Prospect Ave.; N. Prospect Ave. – E. Knapp St. to E. Curtis Pl.; N. Waverly Pl. – 200’ S. of E. Juneau Ave. to E. Juneau Ave.
04/25/2019 03:30 PM UTC
OFFICIAL NOTICE 4-2-2019
COMBINED SEWER MAIN RELAY in: S. 4th St. – W. Maple St. to Alley South of W. Burnham St. S. 5th St. – W. Orchard St. to W. Lapham Blvd. S. 9th St. – W. National Ave. to 100’+/- S. of W. Walker St. S. 17th St. – W. National Ave. to 400’ S. of W. National Ave. W. Lapham St. – S. 20th St. to S. 21st St. W. National Ave. – 280’+/- E. of S. 9th St. to S. 10th St.
04/25/2019 03:30 PM UTC
OFFICIAL NOTICE 54-1-2019
Century City Roof Drainage Repairs - Building 36
04/24/2019 03:30 PM UTC
OFFICIAL NOTICE 46-1-2019
FORESTRY CENTER WALL CLADDING 5230 WEST STATE STREET MILWAUKEE WI
04/23/2019 03:30 PM UTC
OFFICIAL NOTICE 31-1-2019
Century City Roof Repairs - Building 36
04/22/2019 03:30 PM UTC
OFFICIAL NOTICE 17-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190105 – S. 7th St. - W. Maple St. to W. Lapham Blvd. S. 9th St. - W. National Ave. to W. Virginia St. S. 10th St. - W. Morgan Av. to W. Ohio St. S. 18th St. - W. Euclid Ave. to W. Oklahoma Ave. S. 56th St. - W. Oklahoma Ave. to W. Stack Dr. W. Lincoln Ave - S. 35th St. to Union Pacific Railroad R.O.W. w/o S. 43rd St.
04/18/2019 03:30 PM UTC
OFFICIAL NOTICE 58-1-2019
WATER MAIN RELAYS at the following locations: N. 86th St. (WT410190611), W. Keefe Av. to 240’ N/O W. Melvina St. (74 working days); N. 84th St. (WT410190612), W. Vienna Av. to W. Capitol Dr. (34 working days); N. 82nd St. (WT410190613), W. Keefe Av. to 250’ N/O W. Nash St. (29 working days); N. 80th St. (WT410190614), W. Townsend St. to W. Nash St. (37 working days); N. 78th St. (WT410190615), W. Lisbon Av. to W. Nash St. (53 working days); N. 75th St. (WT410190616), W. Nash St. to W. Melvina St. (32 working days); W. Vienna Ct. (WT410190617), 200’ SW/O N. 75th St. to N. 75th St. (9 working days); N. 90th St. (WT410190635), W. Townsend St. to W. Metcalf Pl. (24 working days); W. Keefe Av. (WT410190636), N. 90th St. to N. 91st St. (11 working days); N. 82nd St. (WT410190682), W. Vienna Av. to W. Melvina St. (23 working days). (Note: Contractor to furnish and install approximately 11,817 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/17/2019 03:30 PM UTC