General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 87-1-2020
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct asphalt speed humps at these locations: (ST211190202) – N. 9th St. – W. Hadley St. to W. Locust St. (1 speed hump) (ST211190166) – S. 12th St. – W. Harrison Ave. to W. Hayes Ave.(2 speed humps) (ST211190190) – N. 13th St. - W. Capitol Dr. to W. Fiebrantz Ave.(1 speed hump) (ST211110153) – N. 15th St. – W. Lloyd St. to W. North Ave. (2 speed humps) (ST211190169) – S. 17th St. – W. Windlake Ave. to W. Lincoln Ave.(2 speed humps) (ST211190175) – N. 19th Pl. – W. Courtland Ave. to W. Hampton Ave.(1 speed hump) (ST211180260) – N. 24th Pl. – W. Vienna Ave. to W. Melvina St. (1 speed hump) (ST211190195) – N. 45th St. – W. Fiebrantz Ave. to W. Hope Ave.(1 speed hump) (ST211190180) – N. 45th St. – W. Congress St. to W. Glendale Ave.(3 speed humps) (ST211200115) – N. 49th St. – W. Marion St. to W. Congress St. (1 speed hump) (ST211200106) – N. 72nd St. – W. Courtland Ave. to W. Hampton Ave.(1 speed hump) (ST211180245) – N. 72nd St. – W. Hampton Ave. to W. Stark St. (1 speed hump) (ST211180244) – N. 73rd St. – W. Marion St. to W. Congress St. (1 speed hump) (ST211180267) – N. Buffum St. – E. Locust St. to E. Chambers St.(1 speed hump) (ST211190183) – W. Cherry St. – N. 23rd St. to N. 24th St. (1 speed hump) (ST211190164) – W. Grant St. - S. 17th St. to S. 19th St. (2 speed humps) (ST211180291) – N. Hopkins St. – W. Sheridan Ave. to W. Silver Spring Dr.(1 speed hump) (ST211190185) – W. Leon Tr. – W. Hoyt Pl. to N. 48th St. (1 speed hump) (ST211190186) – W. Purdue St. – N. 19th Pl. to N. 20th St. (1 speed hump) (ST211190188) – W. Thurston Ave. – N. 32nd St. to N. 33rd St. (1 speed hump)
09/01/2020 03:30 PM UTC
Official Notice 91-1-2020
PAVEMENT REPAIRS IN THE CITY OF MILWAUKEE NORTHWEST GARAGE WEST PARKING AREA 3025 W RUBY AVE MILWAUKEE WI 53213
08/24/2020 03:30 PM UTC
OFFICIAL NOTICE 57-1-2020
WATER MAIN RELAYS WITH LEAD SERVICE LINE REPLACEMENTS at the following locations: N. 33rd St. (WT410160680), W. Hadley St. to W. Locust St. (26 working days); W. Atkinson Ave. (WT410160690), 140' NW/O N Teutonia Ave. to W. Roosevelt Dr. (29 working days); W. Olive St. (WT410160691), N. 22nd St. to W. Roosevelt Dr. (33 working days); E. Locust St. (WT410160705), N. Palmer St. to N. 1st St. (13 working days); N. Palmer St. (WT410160707), E. Hadley St. to E. Locust St. (29 working days); N. Newhall St. (WT410190600), E. Locust St. to E. Linnwood Ave. (26 working days); N. 26th St. (WT410200673), W. Ruby Ave. to W. Glendale Ave. (31 working days); N. 22nd St. (WT410200689), W. Ruby Ave. to W. Cornell St. (31 working days). (Note: Contractor to furnish and install approximately 5,927 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/20/2020 03:30 PM UTC
OFFICIAL NOTICE 85-1-2020
WATER MAIN RELAYS, at the following locations: N. 24th St. (WT410200605), W. Rohr Ave. to W. Custer Ave. (14 working days); W. Rohr Ave. (WT410200606), 300' E/O N. 24th St. to N. 24th St. (9 working days); W. Florist Ave. (S/S) (WT410200633), N. 65th St. to N. 76th St. (101 working days); N. 71st St. (WT410200634), W. Bobolink Ave. to W. Florist Ave. (17 working days); N. 72nd St. (WT410200635), W. Bobolink Ave. to W. Florist Ave. (18 working days); N. 73rd St. (WT410200636), W. Bobolink Ave. to W. Florist Ave. (16 working days); W. Bobolink Ave. (WT410200637), N. 68th St. to N. 70th St. (15 working days); E. Kenwood Blvd. (WT410200643), N. Lake Dr. to 950' E/O N Lake Dr. (23 working days). (Note: Contractor to furnish and install approximately 8,394 lin. ft. of 16", 12", 8", 6", 4" and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/20/2020 03:30 PM UTC
OFFICIAL NOTICE 79-1-2020
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS CRUSHED STONE BASE, CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211190137 – In North 23rd Street from West Center Street to West Locust Street
08/19/2020 03:30 PM UTC
Official Notice 28-1-2020
Milwaukee Police Department Third District Data Communications Server Room Cooling Modifications 2333 North 49th Street Milwaukee WI 53210
08/18/2020 03:30 PM UTC
OFFICIAL NOTICE 64-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230200161 – Area Wide Bounded By: West State Street, State Truck Highway – 175, West Vliet Street, and West Highland Boulevard
08/17/2020 03:30 PM UTC
OFFICIAL NOTICE 75-1-2020
CONSTRUCTION OF 5” CONCRETE WALK, 8” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 8” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST210020103 – In West Good Hope Road from North 60th Street to North 76th Street (Southside of West Good Hope Road only)
08/13/2020 03:30 PM UTC
OFFICIAL NOTICE 84-1-2020
WATER MAIN RELAYS, at the following locations: N. 94th St. (WT410200604), W. Bluemound Rd. to W. Wisconsin Av.(23 working days); W. Fiebrantz Av.(including Cul De Sac)(WT410200627), N. 100th St. to W. Grandtosa Dr.(20 working days); W. Beckett Av.(WT410200628), W. Ruby Av. to W. Glendale Av.(20 working days); N. Houston Av.(WT410200630), W. Congress St. to W. Courtland Av.(56 working days); W. Glendale Ct.(WT410200631), N. Houston Av. to 270’ west of N. Houston Av.(11 working days); W. Glendale Av.(WT410200632), N. 76th St. to N. 82nd St.(46 working days); N. 19th St.(WT410200655), N. McKinley Av. to W. 19th St.(14 working days). (Note: Contractor to furnish and install approximately 7356 lin. ft. of 16", 12", 8", and 4" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposed forms.
08/12/2020 03:30 PM UTC
OFFICIAL NOTICE 86-1-2020
100 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
08/12/2020 03:30 PM UTC
651 - 660 of 1601 Solicitations
1 2 62 63 64 66 68 69 70 160 161