General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 91-2-2019
DOWNSPOUT DISCONNECTION AREA 2 - NORTHEAST
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-3-2019
DOWNSPOUT DISCONNECTION AREA 3 - CENTRAL
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-4-2019
DOWNSPOUT DISCONNECTION AREA 4 - SOUTH
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 92-1-2019
Milwaukee Forestry Nursery HVAC System Replacement 8423 South 51st Street Franklin, WI 53132
07/17/2019 03:30 PM UTC
OFFICIAL NOTICE 84-1-2019
WATER MAIN RELAYS at the following locations: S. 15th St.(WT410180600), W. Halsey St. to W. Holmes St.(11 working days); S. 13th St.(WT410180602), W. Holmes Av. to W. Abbott Av.(47 working days); W. Henry Av.(WT410180668), S. 18th St. to S. 20th St.(16 working days); S. 87th St.(WT410190687), W. Morgan Av. to W. Tripoli Av.(60 working days); S. 86th St.(WT410190688), W. Morgan Av. to 275’ S/O W. Wilbur Av.(45 working days); S. 85th St.(WT410190689), W. Morgan Av. to W. Wilbur Av.(37 working days). (Note: Contractor to furnish and install approximately 8,124 lin. Ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/12/2019 03:30 PM UTC
OFFICAL NOTICE 78-1-2019
BIOSWALES IN: WEST BROWN DEER ROAD FROM NORTH 95TH STREET TO NORTH 214TH STREET PLAN SHEET: 250-043 TO 250-48, 198-5-122, ATTACHEMENT 1 PLAN DATE: 6/14/2019 PROJECT ID: SM499160123
07/08/2019 03:30 PM UTC
OFFICIAL NOTICE 44-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190108 – ADA Ramps for 2016 High Impact Paving Projects at Various City Wide Locations
07/03/2019 03:30 PM UTC
OFFICIAL NOTICE 80-1-2019
WATER MAIN RELAYS at the following locations: S. 70th St.(WT410190621), W. Arthur Av. to W. Kinnickinnic River Pkwy.(77 working days); S. 71st St.(WT410190622), W. Arthur Av. to W. Dakota St.(64 working days); S. 69th St.(WT410190623), W. Arthur Av. to W. Cleveland Av.(30 working days); W. Harrison Av.(WT410190625), S. 67th St. to S. 71st St.(35 working days); S. 67th St.(WT410190626), 150’ N/O W. Finger Pl. to W. Harrison Av.(14 working days). (Note: Contractor to furnish and install approximately 9,084 lin. Ft. of 12”, 8”, and 6” ductile iron pipe and perform approximately 2 Lead Service Replacements installing approximately 67 lin. Ft. of copper water service, Private Side Only. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/03/2019 03:30 PM UTC
OFFICIAL NOTICE 76-1-2019
Century City Roof Drainage Repairs - Building 36, Century City Business Park
07/02/2019 03:30 PM UTC
OFFICIAL NOTICE 70-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, 7 INCH HIGH EARLY STRENGTH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, MANHOLE/INLET REPAIR, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190159 - Area 3 - 2019 Sidewalk Replacements Area Bounded By: S. 20th St., W. Oklahoma Ave., S. 27th St. to W. Ohio Ave.
06/27/2019 03:30 PM UTC
641 - 650 of 1476 Solicitations
1 2 61 62 63 65 67 68 69 147 148