General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 48-1-2019
WATER MAIN RELAYS AND LEAD SERVICE LINE REPLACEMENTS at the following locations: W. Pierce St. (WT410160649), S. 9th St. to S. 10th St. (16 working days); S. 10th St. (WT410160661), W. Burnham St. to W. Rogers St. (39 working days); W. Burnham St. (WT410160662), S. 10th St. to S. 11th St. (13 working days); W. Stark St. (WT410160665), N. 36th St. to N. 37th St. (10 working days); N. 37th St. (WT410160666), W. Hampton Ave. to W. Fairmount Ave. (65 working days); Lead Service Line Replacements (WK64409154), at multiple locations throughout the project limits (working days included in individual relay projects). (Note: Contractor to furnish and install approximately 3,234 lin. ft. of 8” and 6” ductile iron pipe and perform approximately 94 Lead Service Line Replacements installing approximately 1,654 lin. ft. of copper water service, Private Side Only. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/15/2019 03:30 PM UTC
OFFICIAL NOTICE 73-1-2019
LOCAL RIGHT OF WAYS MOWING ADJOINING STATE HIGHWAYS. Areas to be mowed include multiple local street rights of way segments adjoining state highways I-43, I-94, I-41, 145, and 175.
05/14/2019 03:30 PM UTC
OFFICIAL NOTICE 64-1-2019
BIOSWALES IN: W. Parnell Ave. from S. 27th St. to W. Ramsey Ave. Plan File: 251-30,251-31, 251-54 through 251-56, 198-5-117 Dated: 04/10/2019 Project ID: SM499180002 S. Marilyn St. from W. Ramsey Ave. to W. Iona Ter. Plan File: 251-29 through 251-33, 198-5-117 Dated: 04/10/2019 Project ID: SM499180003
05/13/2019 03:30 PM UTC
OFFICIAL NOTICE 26-1-2019
Office of African American Affairs Renovation 4830 W Fond Du Lac Avenue Milwaukee WI
05/09/2019 03:30 PM UTC
OFFICIAL NOTICE 65-1-2019
MITCHELL STREET "GREEN" PARKING LOT RECONSTRUCTION 1640 SOUTH 10TH STREET MILWAUKEE WI
05/03/2019 03:30 PM UTC
OFFICIAL NOTICE 62-1-2019
WATER MAIN RELAYS at the following locations: N. 87th St. (WT410190629), W. Auer Av. to W. Concordia Av. (24 working days); N. 88th St. (WT410190630), W. Auer Av. to W. Concordia Av. (22 working days); W. Auer Av. (WT410190631), N. 88th St. to N. 89th St. (11 working days); N. 95th St. (WT410190634), W. Burleigh St. to W. Auer Av. (17 working days); N. 78th St. (WT410190680), W. Burleigh St. to W. Auer Av. (15 working days); N. 79th St. (WT410190681), W. Auer Av. to W. Lisbon Av. (19 working days). (Note: Contractor to furnish and install approximately 3,535 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/01/2019 03:30 PM UTC
OFFICIAL NOTICE 63-1-2019
SANITARY BUILDING SEWER (LATERAL) LINING AND REPAIR IN: AREA BOUNDED BY W. HARRISON AVE. TO W. KINNICKINNIC RIVER PKWY FROM S. 60TH ST. TO S. 72ND ST. **Attendance at a Pre-Bid meeting on Tuesday, April 23, 2019 at 10:30 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
04/30/2019 03:30 PM UTC
OFFICIAL NOTICE 63-2-2019
SANITARY SEWER MAIN LINING AND REPAIR & SANITARY MANHOLE LINING AND REPAIR IN: AREA BOUNDED BY SOUTH 43RD STREET TO SOUTH 52ND PLACE FROM WEST LINCOLN AVENUE TO WEST OKLAHOMA AVENUE
04/30/2019 03:30 PM UTC
OFFICIAL NOTICE 61-1-2019
Water Main Relays at the following locations: S. 24th St. (WT410190638), W. Barnard Av. to W. Carpenter Av. (18 working days); S. 91st St. (WT410190683), W. Wilbur Av. to W. Crawford Av. (17 working days); S. 90th St. (WT410190684), W. Wilbur Av. to W. Crawford Av. (18 working days); S. 89th St. (WT410190685), W. Warnimont Av. to W. Crawford Av. (34 working days); S. 89th St. (WT410190686) W. Morgan Av. to W. Crawford Av. (48 working days). (Note: Contractor to furnish & install approx. 5,252 lin. ft. of 12", 8", 6", 4", & 3" D.I. pipe. City to furnish misc. materials as shown on plans & proposal form.)
04/29/2019 03:30 PM UTC
OFFICIAL NOTICE 43-1-2019
MacArthur Square Parking Structure Lower Plaza Façade Repairs
04/26/2019 03:30 PM UTC
671 - 680 of 1476 Solicitations
1 2 64 65 66 68 70 71 72 147 148