General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 59-1-2020
PROJECT 1: DINEEN PARK LAGOON DREDGING AND STREAMBANK STABILIZATION Located at: Dineen Park - in the area bounded by W. Melvina St., W. Keefe Ave., N. 62nd St., and W. Appleton Ave.
06/23/2020 03:30 PM UTC
OFFICIAL NOTICE 68-1-2020
WATER MAIN RELAYS WITH LEAD SERVICE LINE REPLACEMENTS at the following locations: W. Stark St. (WT410200646), N. 64th St. to N. 67th St. (30 working days); N. 67th St. (WT410200647), W. Fond Du Lac Ave. to W. Stark St. (24 working days); W. Hampton Ave. (S/S) (WT410200648), N. Sherman Blvd. to N. 46th St. (33 working days); W. Hampton Ave. (S/S) (WT410200649), N. 48th St. to N. 51st Blvd. (29 working days); N. 49th St. (WT410200650), W. Parkway Dr. to W. Hampton Ave. (61 working days); N. 48th St. (WT410200651), W. Parkway Dr. to W. Glendale Ave. (25 working days); N. 53rd St. (WT410200652), W. Glendale Ave. to W. Hampton Ave. (42 working days); N. 56th St. (WT410200653), W. Parkway Dr. to W. Hampton Ave. (41 working days); N. 57th St. (WT410200654), W. Parkway Dr. to W. Hampton Ave. (37 working days); (Note: Contractor to furnish and install approximately 10,201 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/16/2020 03:30 PM UTC
OFFICIAL NOTICE 71-1-2020
COMBINED SEWER MAIN RELAY in: N. 14th St. – W. Clarke St. to W. Center St. N. 14th St. – W. Hadley St. to W. Chambers St. N. 18th St. – W. Center St. to W. Hadley St. N. 19th St. – W. Wright St. to W. Clarke St. W. Columbia St. – N. 13th St. to N. 14th St. W. Nash St. – N. 14th St. to N. 15th St.
06/10/2020 03:30 PM UTC
OFFICIAL NOTICE 71-2-2020
COMBINED SEWER MAIN RELAY & NEW STORM SEWER MAIN & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: N. 51st St. – W. Garfield Ave. to W. Meinecke Ave. N. 52nd St. – W. North Ave. to 370’+/- N. of W. North Ave. W. Douglas Ave. – N. 119th St. to 425’ W. of N. 119th St. E. Mason St. – N. Broadway to N. Milwaukee St. W. Meinecke Ave. – 25’+/- E. of N. 51st St. to 100’+/- W. of N. 51st St.
06/10/2020 03:30 PM UTC
Official Notice 66-1-2020
1000 North Water Street Parking Garage Fire Protection Pipe Replacement 1000 North Water Street Milwaukee, WI 53202
06/09/2020 03:30 PM UTC
OFFICIAL NOTICE 73-1-2020
Snow Plowing, Salting, Landscaping, Mowing and Trash Removal from Parking Structures
06/03/2020 03:30 PM UTC
OFFICIAL NOTICE 62-1-2020
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, SIGNAGE INSTALLATION, ETC.; Construct asphalt speed humps at these locations: (ST211190165) – W. Arthur Ave. – S. 11th St. to S. 13th St. (2 speed humps) (ST211190158) – W. Baldwin St. – W. Spencer Pl. to W. Fond du Lac Ave. (2 speed humps) (ST211190206) – N. Booth St. – E. Meinecke Ave. to E. Wright St. (1 speed hump) (ST211190159) – N. Booth St. – E. Hadley St. to E. Locust St. (1 speed hump) (ST211190191) – W. Cherry St. – N. 35th St. to N. 37th St. (1 speed hump) (ST211190192) – W. Galena St. – N. 35th St. to N. 37th St. (2 speed humps) (ST211190167) – W. Harrison Ave. – S. 10th St. to S. 13th St. (3 speed humps) (ST211190184) – W. Harrison Ave. – S. 9th St. to S. 10th St. (2 speed humps) (ST211190151) – W. Marion St. – N. 36th St. to N. 38th St. (2 speed humps) (ST211190152) – W. Nash St. – N. 56th St. to N. 57th St. (1 speed hump) (ST211190168) – W. Scott St. – S. 18th St. to S. 20th St. (2 speed humps) (ST211190160) – W. St. Paul Ave. – N. 29th St. to N. 30th St. (1 speed hump) (ST211190207) – N. Vel R. Phillips Ave. – W. North Ave. to W. Meinecke Ave. (1 speed hump) (ST211190189) – W. Vine St. – N. 26th St. to N. 27th St. (1 speed hump) (ST211190170) – E. Warnimont Ave. – S. Brust Ave. to S. Clement Ave. (3 speed humps) (ST211190174) – N. 6th St. – W. Burleigh St. to W. Ring St. (2 speed humps) (ST211190201) – N. 9th St. – W. Clarke St. to W. Center St. (1 speed hump) (ST211180136) – N. 14th St. – W. Concordia Ave. to W. Keefe Ave. (2 speed humps) (ST211190203) – N. 14th St. – W Lloyd St. to W. North Ave. (2 speed humps) (ST211190153) – N. 15th St. – W. Nash St. to W. Atkinson Ave. (1 speed hump) (ST211190154) – N. 16th St. – W. Keefe Ave. to W. Nash St. (2 speed humps) (ST211190122) – S. 17th St. – W. Greenfield Ave. to W. Scott St. (1 speed hump) (ST211190176) – N. 21st St. – W. Locust St. to W. Chambers St. (1 speed hump) (ST211190155) – N. 23rd St. – W. Locust St. to W. Chambers St. (1 speed hump) (ST211190149) – N. 30th St. – W. Burleigh St. to W. Auer Ave. (1 speed hump) (ST211190178) – N. 36th St. – W. Meinecke Ave. to W. Wright St. (1 speed hump) (ST211190196) – N. 37th St. – W. Cherry St. to W. Galena St. (1 speed hump) (ST211190193) – N. 38th St. – W. Clarke St. to W. Center St (1 speed hump) (ST211190205) – N. 39th St. - W. Courtland Ave. to W. Hampton Ave. (1 speed hump) (ST211190156) – N. 39th St. – W. Fiebrantz Ave. to W. Hope Ave. (2 speed humps) (ST211190157) – N. 39th St. – W. Hope Ave. to N. Sercombe Rd. (1 speed hump) (ST211180284) – N. 40th St. – W. Chambers St. to W. Burleigh St. (1 speed hump) (ST211190127) – N. 41st St. – W. Burleigh St. to W. Auer Ave. (1 speed hump) (ST211190126) – N. 41st St. – W. Chambers St. to W. Burleigh St. (1 speed hump) (ST211180286) – N. 42nd St. – W. Roosevelt Dr. to W. Capitol Dr. (2 speed humps) (ST211190179) – N. 44th St. – W. Fiebrantz Ave. to W. Hope Ave. (1 speed hump) (ST211190181) – N. 55th St. – W. Nash St. to W. Vienna Ave. (1 speed hump) (ST211180289) – N. 58th St. – W. Hampton Ave. to W. Fairmount Ave. (3 speed humps) (ST211180248) – N. 72nd St. – W. Locust St. to W. Chambers St. (2 speed humps) (ST211180172) – N. 105th St. – W. Stark St. to W. Cameron Ave. (1 speed hump)
06/02/2020 03:30 PM UTC
OFFICIAL NOTICE 5-1-2020
COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: W. Center St. – N. 27th St. to N. 30th St.
05/28/2020 03:30 PM UTC
OFFICIAL NOTICE 60-1-2020
WATER MAIN RELAYS, at the following locations: W. Vienna Ave. (WT410200645), N. 76th St. to N. 80th St. (28 working days); N. 66th St. (WT410200659), W. Congress St. to W. Medford Ave. (41 working days); N. 67th St. (WT410200660), W. Hope Ave. to W. Marion St. (17 working days); N. 67th St. (WT410200661), W. Congress St. to W. Glendale Ave. (28 working days); W. Glendale Ave. (WT410200662), N. 66th St. to N. 67th St. (7 working days); N. 69th St. (WT410200663), W. Marion St. to W. Glendale Ave. (35 working days); N. 70th St. (WT410200664), W. Capitol Dr. to W. Congress St. (46 working days); N. 71st St. (WT410200665), W. Capitol Dr. to W. Congress St. (47 working days); W. Hope Ave. (WT410200666), N. 66th St. to N. 73rd St. (39 working days). (Note: Contractor to furnish and install approximately 15,396 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/27/2020 03:30 PM UTC
Official Notice 66-1-2020
1000 North Water Street Parking Garage Fire Protection Pipe Replacement 1000 North Water Street Milwaukee, WI 53202
05/26/2020 03:30 PM UTC
671 - 680 of 1601 Solicitations
1 2 64 65 66 68 70 71 72 160 161