We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 4-1-2019
COMBINED SEWER MAIN RELAY AND STORM SEWER MAIN LINING AND MANHOLE REPAIR & LINING in: E. Juneau Ave. – N. Astor St. to N. Prospect Ave.; N. Prospect Ave. – E. Knapp St. to E. Curtis Pl.; N. Waverly Pl. – 200’ S. of E. Juneau Ave. to E. Juneau Ave.
04/25/2019 03:30 PM UTC
OFFICIAL NOTICE 4-2-2019
COMBINED SEWER MAIN RELAY in: S. 4th St. – W. Maple St. to Alley South of W. Burnham St. S. 5th St. – W. Orchard St. to W. Lapham Blvd. S. 9th St. – W. National Ave. to 100’+/- S. of W. Walker St. S. 17th St. – W. National Ave. to 400’ S. of W. National Ave. W. Lapham St. – S. 20th St. to S. 21st St. W. National Ave. – 280’+/- E. of S. 9th St. to S. 10th St.
04/25/2019 03:30 PM UTC
OFFICIAL NOTICE 54-1-2019
Century City Roof Drainage Repairs - Building 36
04/24/2019 03:30 PM UTC
OFFICIAL NOTICE 46-1-2019
FORESTRY CENTER WALL CLADDING 5230 WEST STATE STREET MILWAUKEE WI
04/23/2019 03:30 PM UTC
OFFICIAL NOTICE 31-1-2019
Century City Roof Repairs - Building 36
04/22/2019 03:30 PM UTC
OFFICIAL NOTICE 17-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: ST216190105 – S. 7th St. - W. Maple St. to W. Lapham Blvd. S. 9th St. - W. National Ave. to W. Virginia St. S. 10th St. - W. Morgan Av. to W. Ohio St. S. 18th St. - W. Euclid Ave. to W. Oklahoma Ave. S. 56th St. - W. Oklahoma Ave. to W. Stack Dr. W. Lincoln Ave - S. 35th St. to Union Pacific Railroad R.O.W. w/o S. 43rd St.
04/18/2019 03:30 PM UTC
OFFICIAL NOTICE 58-1-2019
WATER MAIN RELAYS at the following locations: N. 86th St. (WT410190611), W. Keefe Av. to 240’ N/O W. Melvina St. (74 working days); N. 84th St. (WT410190612), W. Vienna Av. to W. Capitol Dr. (34 working days); N. 82nd St. (WT410190613), W. Keefe Av. to 250’ N/O W. Nash St. (29 working days); N. 80th St. (WT410190614), W. Townsend St. to W. Nash St. (37 working days); N. 78th St. (WT410190615), W. Lisbon Av. to W. Nash St. (53 working days); N. 75th St. (WT410190616), W. Nash St. to W. Melvina St. (32 working days); W. Vienna Ct. (WT410190617), 200’ SW/O N. 75th St. to N. 75th St. (9 working days); N. 90th St. (WT410190635), W. Townsend St. to W. Metcalf Pl. (24 working days); W. Keefe Av. (WT410190636), N. 90th St. to N. 91st St. (11 working days); N. 82nd St. (WT410190682), W. Vienna Av. to W. Melvina St. (23 working days). (Note: Contractor to furnish and install approximately 11,817 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/17/2019 03:30 PM UTC
OFFICIAL NOTICE 14-1-2019
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, ETC.; Located at: TD03780001 – W. Kilbourn Ave. - Milwaukee River to N. 6th St. W. Wisconsin Ave. - N. Water St. to N. 10th St.
04/16/2019 03:30 PM UTC
OFFICIAL NOTICE 52-1-2019
WATER MAIN RELAYS at the following locations: W. Daphne St. (WT410190660), N. Hastings St to N. 89th St. (26 working days); N. Hastings St. (WT410190659), W. Acacia St. to W. Kiehnau Ave. (7 working days); W. Acacia St. (WT410190658), N. Hastings St. to N. 89th St. (18 working days); W. Kiehnau Ave. (WT410190657), N. Hastings St. to N. 89th St. (24 working days); W. Brentwood Ave. (WT410190656), N. 83rd St. to N. 89th St. (46 working days); N. Fresno St. (WT410190655), W. Brentwood Ave. to N. 89th St. (26 working days) Note: Contractor to furnish and install approximately 5,690 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.
04/10/2019 03:30 PM UTC
OFFICIAL NOTICE 45-1-2019
PROJECT NO. 1: BIOSWALES IN: Located at: W. Bradley Rd. – 20’ +/- west of N. 51st St. to 198’ +/- east of Dretzka Park Roadway
04/09/2019 03:30 PM UTC