General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 53-1-2020
WATER MAIN RELAYS, at the following locations: W. Alvina Av. (WT410200601), S. 1st St. to 640’ W/O S. 1st St. (16 working days); W. Mangold Av. (WT410200602), S. 1st St. to 570’ W/O S. 1st St. (14 working days); S. 3rd St. (WT410200603), W. Uncas Av. to W. College Av. (19 working days); W. Maplewood Ct. (WT410200615), S. 14th St. to S. 15th Pl. (22 working days); S. 15th Pl. (WT410200616), W. Mallory Av. to W. Maplewood Ct. (11 working days); W. Carpenter Av. (WT410200687), S. 26th St. to S. 27th St. (9 working days). (Note: Contractor to furnish and install approximately 3,506 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/03/2020 03:30 PM UTC
OFFICIAL NOTICE 39-1-2020
Installation of pavement markings, colored pavement markings, and flexible delineators to address pedestrian, bicyclist, and motor vehicle traffic safety concerns.
04/02/2020 03:30 PM UTC
OFFICIAL NOTICE 55-1-2020
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: City-Owned Lot Area 1B, bounded by Capitol Drive to north City limits and Sherman Boulevard to west City limits
03/30/2020 03:30 PM UTC
OFFICIAL NOTICE 56-1-2020
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: CITY-OWNED LOT AREA 1B, bounded by Capitol Drive to north City limits and Sherman Boulevard to east City limits.
03/30/2020 03:30 PM UTC
OFFICIAL NOTICE 3-1-2020
SANITARY AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: Located at: N. 49th St. – W. North Ave. to W. Lisbon Ave. N. 52nd St. – W. Center St. to W. Burleigh St. N. Arlington Pl. – N. Warren Ave. to 130’ North of N. Warren Ave. W. Auer Ave. – N. 31st St. to N. 33rd St. W. Center St. – N. 52nd St. to N. 53rd St. N. Fratney St. – E. Meinecke Ave. to E. Keefe Ave. W. State St. – 400’ +/- East of N. 37th St. to N. 37th St.
03/25/2020 03:30 PM UTC
OFFICIAL NOTICE 3-2-2020
STORM AND COMBINED SEWER MAIN RELAY IN: N. 33rd St. – W. Burleigh St. to W. Auer Ave. N. 35th St. – W. Auer Ave. to 400’ +/- N. of W. Auer Ave. N. 40th St. – W. Vienna Ave. to W. Roosevelt Dr. W. Senator Ave. – 270’ +/- E. of N. 33rd St. to N. 33rd St. W. Vienna Ave. – N. 35th St. to 130’ +/- W. of N. 35th St.
03/25/2020 03:30 PM UTC
OFFICIAL NOTICE 3-3-2020
PERMEABLE PAVER PROJECT Located at: 1720 North Arlington Place
03/25/2020 03:30 PM UTC
OFFICIAL NOTICE 20-1-2020
Snow Plowing, Salting, Landscaping, Mowing and Trash Removal from DPW Parking Lots, and Parking Structures
03/17/2020 03:30 PM UTC
OFFICIAL NOTICE 21-1-2020
Snow Plowing, Salting, Landscaping, Mowing and Trash Removal from DPW Parking Lots, and Parking Structures.
03/17/2020 03:30 PM UTC
OFFICIAL NOTICE 21-2-2020
Snow Plowing, Salting, Landscaping, Mowing and Trash Removal from DPW Parking Lots, and Parking Structures
03/17/2020 03:30 PM UTC
691 - 700 of 1601 Solicitations
1 2 66 67 68 70 72 73 74 160 161