General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2020
WATER MAIN RELAYS, at the following locations: N. 61st St. (WT410200610), W. Keefe Avenue Parkway to W. Vienna Ave. (33 working days); N. 62nd St. (WT410200611), W. Keefe Avenue Parkway to W. Nash St. (17 working days); W. Melvina St. (WT410200612), N. 60th St. to N. 65th St. (35 working days); W. Villard Ave. (WT410200613), N. 45th St. to N. 47th St. (30 working days); N. 47th St. (WT410200614), W. Villard Ave. to W. Rohr Ave. (15 working days); N. 64th St. (WT410200674), W. Keefe Avenue Parkway to W. Nash St. (15 working days). (Note: Contractor to furnish and install approximately 6,054 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/07/2020 03:30 PM UTC
OFFICIAL NOTICE 70-1-2020
SEALCOAT BITUMINOUS PAVEMENTS USING A SLURRY SEAL BITUMINOUS/AGGREATE MIX. SEALCOATING WILL INCLUDE SURFACE CLEANING/SWEEPING OF PAVEMENT WITH MECHANICAL SWEEPERS, INSTALL/REMOVE PROTECTIVE COVER OVER, WATER BOXES, INLETS GRATES AND MANHOLE COVERS, ETC.; Located at: ST211200121 – Sealcoating of Various Streets in the City of Milwaukee by Contract - (Slurry Seal)
07/31/2020 03:30 PM UTC
OFFICIAL NOTICE 46-1-2020
SANITARY SEWER MAIN RELAY IN: S. 64th St. – W. Main St. to W. Dickinson St. S. 67th St. – W. Dixon St. to 265’ +/- South of W. Dixon St. S. 68th St. – 330’ +/- North of W. Main St. to W. Main St. N. 68th St. – W. Stevenson St. to 275’ +/- North of W. Stevenson St. N. 76th St. – 300’ +/- South of W. Stevenson St. to W. Stevenson St. S. 80th St. – 290’ +/- North of W. O’Connor St. to W. O’Connor St. N. 80th St. – W. Fairview Ave. to W. Stevenson St. W. Adler St. – 60’ +/- East of S. 59th St. to S. 62nd St.
07/30/2020 03:30 PM UTC
OFFICIAL NOTICE 45-1-2020
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE AND/OR CONCRETE DRIVEWAYS, PERMEABLE PAVERS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST212010142 – Alley: West Lloyd Street, West North Avenue, North 14th Street, and North 15th Street ST212040101 – Alley: West Auer Avenue, West Burleigh Street, North 80th Street, and North 81st Street ST212160106 – Alley: West Douglas Avenue, West Kaul Avenue, North 37th Street, and North 38th Street
07/29/2020 03:30 PM UTC
Official Notice 83-1-2020
POURED-IN-PLACE RESILIENT RUBBER SURFACE INSTALLATION VARIOUS LOCATIONS MILWAUKEE WI
07/27/2020 03:30 PM UTC
OFFICIAL NOTICE 80-1-2020
WATER MAIN RELAYS, at the following locations: W. Ohio Ave. (WT410200681), S. 53rd St. to S. 55th St. (18 working days); S. 55th St. (WT410200682), W. Holt Ave. to W. Morgan Ave. (18 working days); W. Verona Ct. (WT410200683), 250' E/O S 55th St. to S. 55th St. (11 working days); W. Holt Ave. (WT410200684), S. 55th St. to S. 60th St. (30 working days); S. 58th St. (WT410200685), 425' N/O W Holt Ave. to W. Holt Ave. (16 working days). (Note: Contractor to furnish and install approximately 3,280 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/21/2020 03:30 PM UTC
OFFICIAL NOTICE 6-1-2020
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 23rd St. – W. Locust St. to W. Chambers St. N. 26th St. – W. Chambers St. to W. Burleigh St. N. 34th St. – W. Meinecke Ave. to W. Wright St. N. 36th St. – W. Clarke St. to W. Center St. W. Locust St. – N. 27th St. to N. 29th St. W. Wright St. – N. 34th St. to N. 35th St.
07/09/2020 03:30 PM UTC
OFFICIAL NOTICE 77-1-2020
WATER MAIN RELAYS, at the following locations: S. 63rd St. (WT410200676), W. Burdick Ave. to W. Morgan Ave. (33 working days); S. 64th St. (WT410200677), W. Ohio Ave. to W. Verona Ct. (20 working days); S. 65th St. (WT410200678), W. Ohio Ave. to W. Verona Ct. (20 working days); W. Burdick Ave. (WT410200679), 475’ NE/O S. 63rd St. to W. Ohio Ave. (33 working days); W. Verona Ct. (WT410200680), S. 63rd St. to S. 65th St. (17 working days). (Note: Contractor to furnish and install approximately 6,144 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/07/2020 03:30 PM UTC
OFFICIAL NOTICE 72-1-2020
WINDOW GLAZING REPLACEMENT FIRE HOUSE ENGINE 13 AND 30 2901 N 30TH ST MILWAUKEE WI 2903 N TEUTONIA AVE MILWAUKEE WI
06/26/2020 03:30 PM UTC
OFFICIAL NOTICE 61-1-2020
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, CRACKING AND SEALING CONCRETE PAVEMENT, PAVEMENT GRINDING, SEWER WORK, WATER WORK, ETC.; Located at: ST211150141 – N. 78th St. – W. Vienna Ave. to W. Capitol Dr. ST211190105 – N. Servite Dr. – Between W. Dean Rd. & W. Brown Deer Rd.
06/25/2020 03:30 PM UTC
661 - 670 of 1601 Solicitations
1 2 63 64 65 67 69 70 71 160 161