General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 55-A-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project A: City-Owned Lot Area 2: Area bounded by North Avenue, west City limit, Capitol Drive, and North 27th Street.
03/09/2018 04:30 PM UTC
OFFICIAL NOTICE 55-B-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project B: City-Owned Lot Area 3: Area bounded by North Avenue, North 27th Street, Capitol Drive, and North 20th Street.
03/09/2018 04:30 PM UTC
OFFICIAL NOTICE 37-1-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 37-2-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W Capitol Dr and W I-94
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 37-3-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 17-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180107 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice: O.N. 11-1-2018 S. 3rd St. – W. Waterford Ave. to W. Norwich St. S. 6th St. – W. Mitchell St. to W. Greenfield Ave. S. 16th St. – W. Windlake Ave. to W. Mitchell St. W. Clayton Crest Ave. – S. 14th St. to S. 15th Pl. W. Mallory Ave. – S. 13th St. to S. 15th Pl. S. Superior St. – A point South of E. Oklahoma Ave. to E Russell Ave. W. Upham Ave. – S. 14th St. to S. 15th Pl. O.N. 12-1-2018 S. 35th St. – RR Bridge South of W. Arthur Ave. to W. Lincoln Ave. S. 35th St. – W. Lincoln Ave. to W. Rogers St. S. 43rd St. – W. Forest Home Ave. to W. Cleveland Ave. W. Cleveland Ave. – S. 60th St. to City Limits (S. 72nd St.) W. Greenfield Ave. – S. 35th St. to Union Pacific Railroad Right of Way O.N. 13-1-2018 N. 4th St. – W. Wells St. to W. Kilbourn Ave. W. Cherry St. – Milwaukee River to N. 6th St. N. Jackson St. – E. Kilbourn Ave. to E. Ogden Ave. N. Milwaukee St. – E. Clybourn St. to E. Wisconsin Ave. N. Milwaukee St. – E. Wisconsin Ave. to E. Kilbourn Ave. W. North Ave. – N. 9th St. to W. Fond du Lac Ave. E. Ogden Ave. – N. Van Buren St. to N. Jackson St. N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
03/07/2018 04:30 PM UTC
OFFICIAL NOTICE 22-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211130132 - W. Juneau Ave. - N. Old World 3rd St. to N. 6th St. (also TID-48) (TD04884042) OR (TD03984000).
03/06/2018 04:30 PM UTC
OFFICIAL NOTICE 38-1-2018
WATER MAIN RELAYS at the following locations: W. Congress St. (S/S) (WT410160682), N. 40th St. to N. 41st St. (12 working days); N. 49th St. (WT410180606), W. Congress St. to 400' N/O W. Congress St. (14 working days); N. 46th St. (WT410180607), 470' N/O W. Glendale Ave. to W. Hampton Ave. (28 working days); W. Stark St. / N. 77th St. (WT410180666), W. 76th St. to W. Hampton Ave. (27 working days); W. Constance Ave. (WT410180674), W. Fond Du Lac Ave. to W. Medford Ave. (10 working days); N. 72nd St. (WT410180676), W. Leon Tr. to W. Villard Ave. (16 working days); N. 71st St. (WT410180677), W. Lancaster Ave. to W. Villard Ave. (26 working days); N. 68th St. (WT410180678), W. Stark St. to W. Villard Ave. (55 working days). (Note: Contractor to furnish and install approximately 6,316 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/05/2018 04:30 PM UTC
OFFICIAL NOTICE 33-1-2018
CONCRETE ALLEY PAVEMENT AND WATERPROOFING ATOP THE MECHANICAL SHOP AT THE POLICE ADMINISTRATION BUILDING 951 NORTH JAMES LOVELL STREET MILWAUKEE WI
03/02/2018 04:30 PM UTC
OFFICIAL NOTICE 40-1-2018
LEAD SERVICE LINE REPLACEMENT, at 60 locations, by qualified City of Milwaukee licensed and bonded contractors. All locations will be licensed childcare facilities in the City of Milwaukee.
03/02/2018 04:30 PM UTC
841 - 850 of 1490 Solicitations
1 2 81 82 83 85 87 88 89 148 149