General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 39-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180108 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice No.’s 14-2018, 15-2018, & 16-2018: O.N. # 14-2018 Locations: North Bartlett Avenue – East Locust Street to East Kenwood Boulevard North Bartlett Avenue – East Kenwood Boulevard to East Providence Avenue East/West Burleigh Street – North Holton Street to North 7th Street West Hopkins Street/North 31st Street – North 27th Street to West Capitol Drive North Sherman Boulevard – West Congress Street to West Hampton Avenue O.N. # 15-2018 Locations: North 84th Street – West Center Street to West Burleigh Street West Burleigh Street – North 92nd Street to City Limits (Menomonee River) West Center Street- North 60th Street to North 76th Street West Locust Street – North 51st Street to North 60th Street North 55th Street – West Burleigh Street to West Louise Place North Norwood Place – West Louise Place to West Philip Place North Humboldt Boulevard – West Keefe Avenue to West Capitol Drive O.N. # 16-2018 Locations: North 51st Boulevard – West Hampton Avenue to West Silver Spring Drive North 51st Boulevard – West Good Hope Road to West Calumet Road West Fond du Lac Avenue – West Silver Spring Drive to a point West of North 87th Street West Granville Road – West Bradley Road to North 107th Street West Hampton Avenue – North 60th Street to North 68th Street
06/06/2018 03:30 PM UTC
OFFICIAL NOTICE 64-1-2018
CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.; Located at: ST211180169 - Various Street Locations within the City of Milwaukee
06/06/2018 03:30 PM UTC
OFFICIAL NOTICE 85-1-2018
WATER MAIN RELAYS at the following locations: W. Fiebrantz Ave. (WT410180603), N. 88th St. to N. 89th St. (10 working days); N. 87th St. (WT410180604), W. Capitol Dr. to W. Fiebrantz Ave. (19 working days); W. Auer Ave. (WT410180609), N. 84th St. to N. 85th St. (15 working days); W. Elmore Ave. (WT410180610), N. Willis Pl. to N. 94th St., (10 working days); N. 87th St. (WT410180638), W. Arden Pl. to W. Palmetto Ave. (10 working days); W. Glendale Ave. (WT410180639), N. 84th St. to N. 87th St. (28 working days); W. Herbert Ave. (WT410180640), W. Hampton Ave. to N. 90th St. (40 working days); W. Ruby Ave. / N. 88th St. (WT410180641), N. 85th St. to W. Lawrence Ave. (33 working days). Note: Contractor to furnish and install approximately 6,147 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/01/2018 03:30 PM UTC
OFFICIAL NOTICE 87-1-2018
COUNTING, PROCESSING AND MAINTAINING PARKING METER COLLECTIONS
05/31/2018 03:30 PM UTC
OFFICIAL NOTICE 56-1-2018
FLOATING ISLANDS IN: Hartung Park Wet Detention Pond – East of Menomonee River Parkway and south of West Keefe Avenue
05/30/2018 03:30 PM UTC
OFFICIAL NOTICE 77-1-2018
POLICE DISTRICT STATIONS ADA REMODELING 2ND DISTRICT, 245 W LINCOLN AVENUE 4TH DISTRICT, 6929 W SILVER SPRING DRIVE, 6TH DISTRICT, 3006 S 27TH STREET 7TH DISTRICT, 3626 W FOND DU LAC AVENUE MILWAUKEE, WI
05/25/2018 03:30 PM UTC
OFFICIAL NOTICE 61-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/24/2018 03:30 PM UTC
OFFICIAL NOTICE 78-1-2018
WATER MAIN RELAYS at the following locations: W. Crossfield Av. (WT410180654), W. Douglas Av. to W. Bender Av. (17 working days); W. Winfield Av. (WT410180655), W. Bender Av. to 190 Ft. E/O N. 89th St. (17 working days); W. Bender Av. (WT410180656), N. Joyce Av. to N. 91st St. (34 working days); W. Monrovia Av. (WT410180657), W. Crossfield Av. to W. Bender Av. (35 working days); N. 89th St. (WT410180658), W. Lynx Av. to W. Monrovia Av. (13 working days); W. Douglas Av. (WT410180659), N. Joyce Av. to N. 89th St. (30 working days); W. Lynx Av. (WT410180660), N. 84th St. to N. 89th St. (45 working days); N. Joyce Av. (WT410180661), W. Lynx Av. to W. Mill Rd. (36 working days); N. 86th Ct. (WT410180662), N. Joyce Av. to 320 Ft. NE/O N. Joyce Av. (11 working days); W. Kaul Av. (WT410180663), N. 84th St. to N. 87th St. (28 working days); N. 87th St. (WT410180664), W. Kaul Av. to W. Douglas Av. (13 working days). (Note: Contractor to furnish and install approximately 13,199 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/23/2018 03:30 PM UTC
OFFICIAL NOTICE 005-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING AND MANHOLE REPAIR AND LINING in: Located at: N. 33rd St. – 220’ +/- South of W. Clybourn St. to W. Clybourn St. N. 41st St. – W. Hampton Ave. to W. Stark St. E. Bradford Ave. – N. Frederick Ave. to N. Maryland Ave. E. Wisconsin Ave. – N. Broadway to N. Water St.
05/22/2018 03:30 PM UTC
OFFICIAL NOTICE 41-1-2018
LINCOLN GARAGE REROOFING 3921 W LINCOLN AVENUE MILWAUKEE, WISCONSIN
05/21/2018 03:30 PM UTC
841 - 850 of 1525 Solicitations
1 2 81 82 83 85 87 88 89 152 153