General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 106-2-2025
WP-346 Cameron Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 106-1-2025
WP-346 Linnwood Window Improvement Project
12/17/2025 04:30 PM UTC
OFFICIAL NOTICE 108-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, PAVEMENT GRINDING, VARIOUS PLASTIC PAVEMENT MARKINGS, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, PINNED-ON CONCRETE TRAFFIC ISLANDS, BIOSWALES, ETC.;
12/18/2025 04:30 PM UTC
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 78-1-2018
WATER MAIN RELAYS at the following locations: W. Crossfield Av. (WT410180654), W. Douglas Av. to W. Bender Av. (17 working days); W. Winfield Av. (WT410180655), W. Bender Av. to 190 Ft. E/O N. 89th St. (17 working days); W. Bender Av. (WT410180656), N. Joyce Av. to N. 91st St. (34 working days); W. Monrovia Av. (WT410180657), W. Crossfield Av. to W. Bender Av. (35 working days); N. 89th St. (WT410180658), W. Lynx Av. to W. Monrovia Av. (13 working days); W. Douglas Av. (WT410180659), N. Joyce Av. to N. 89th St. (30 working days); W. Lynx Av. (WT410180660), N. 84th St. to N. 89th St. (45 working days); N. Joyce Av. (WT410180661), W. Lynx Av. to W. Mill Rd. (36 working days); N. 86th Ct. (WT410180662), N. Joyce Av. to 320 Ft. NE/O N. Joyce Av. (11 working days); W. Kaul Av. (WT410180663), N. 84th St. to N. 87th St. (28 working days); N. 87th St. (WT410180664), W. Kaul Av. to W. Douglas Av. (13 working days). (Note: Contractor to furnish and install approximately 13,199 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/23/2018 03:30 PM UTC
OFFICIAL NOTICE 005-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING AND MANHOLE REPAIR AND LINING in: Located at: N. 33rd St. – 220’ +/- South of W. Clybourn St. to W. Clybourn St. N. 41st St. – W. Hampton Ave. to W. Stark St. E. Bradford Ave. – N. Frederick Ave. to N. Maryland Ave. E. Wisconsin Ave. – N. Broadway to N. Water St.
05/22/2018 03:30 PM UTC
OFFICIAL NOTICE 41-1-2018
LINCOLN GARAGE REROOFING 3921 W LINCOLN AVENUE MILWAUKEE, WISCONSIN
05/21/2018 03:30 PM UTC
OFFICIAL NOTICE 66-1-2018
POLICE ADMINISTRATION BUILDING 3RD FLOOR RENOVATIONS 749 WEST STATE STREET MILWAUKEE WI 53233
05/17/2018 03:30 PM UTC
OFFICIAL NOTICE 76-1-2018
Poured-In-Place Resilient Rubber Surface Installation Various MKE Parks Locations Milwaukee WI
05/14/2018 03:30 PM UTC
OFFICIAL NOTICE 65-1-2018
WATER MAIN RELAY at the following location: W. Vliet St. (WT410180007), N. 12th St. to N. 27th St. (120 working days). (Note: Contractor to furnish and install approximately 7,548 lin. ft. of 16", 12", 8", 6", 4" and 3" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/07/2018 03:30 PM UTC
OFFICIAL NOTICE 62-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/03/2018 03:30 PM UTC
OFFICIAL NOTICE 75-1-2018
LEAD SERVICE LINE REPLACEMENT, at 40 locations, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods. All locations will be licensed childcare facilities in the City of Milwaukee. The address of each location is included in the bid documents, along with additional site-specific information. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement.
04/30/2018 03:30 PM UTC
OFFICIAL NOTICE 28-1-2018
WP-326: BURIED NORTH FILTERED WATER RESERVOIR WATERPROOFING REPAIRS
04/26/2018 03:30 PM UTC
OFFICIAL NOTICE 59-1-2018
NW-50 Florist Tank No.1 Rehabilitation and Appurtenance Modifications
04/26/2018 03:30 PM UTC
841 - 850 of 1518 Solicitations
1 2 81 82 83 85 87 88 89 151 152