We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 37-3-2018
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits
03/08/2018 04:30 PM UTC
OFFICIAL NOTICE 17-1-2018
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216180107 - Handicap Ramp Work to Meet ADA Requirements at Various Locations on the 2018 High Impact Paving Projects of Office Notice: O.N. 11-1-2018 S. 3rd St. – W. Waterford Ave. to W. Norwich St. S. 6th St. – W. Mitchell St. to W. Greenfield Ave. S. 16th St. – W. Windlake Ave. to W. Mitchell St. W. Clayton Crest Ave. – S. 14th St. to S. 15th Pl. W. Mallory Ave. – S. 13th St. to S. 15th Pl. S. Superior St. – A point South of E. Oklahoma Ave. to E Russell Ave. W. Upham Ave. – S. 14th St. to S. 15th Pl. O.N. 12-1-2018 S. 35th St. – RR Bridge South of W. Arthur Ave. to W. Lincoln Ave. S. 35th St. – W. Lincoln Ave. to W. Rogers St. S. 43rd St. – W. Forest Home Ave. to W. Cleveland Ave. W. Cleveland Ave. – S. 60th St. to City Limits (S. 72nd St.) W. Greenfield Ave. – S. 35th St. to Union Pacific Railroad Right of Way O.N. 13-1-2018 N. 4th St. – W. Wells St. to W. Kilbourn Ave. W. Cherry St. – Milwaukee River to N. 6th St. N. Jackson St. – E. Kilbourn Ave. to E. Ogden Ave. N. Milwaukee St. – E. Clybourn St. to E. Wisconsin Ave. N. Milwaukee St. – E. Wisconsin Ave. to E. Kilbourn Ave. W. North Ave. – N. 9th St. to W. Fond du Lac Ave. E. Ogden Ave. – N. Van Buren St. to N. Jackson St. N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
03/07/2018 04:30 PM UTC
OFFICIAL NOTICE 22-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211130132 - W. Juneau Ave. - N. Old World 3rd St. to N. 6th St. (also TID-48) (TD04884042) OR (TD03984000).
03/06/2018 04:30 PM UTC
OFFICIAL NOTICE 38-1-2018
WATER MAIN RELAYS at the following locations: W. Congress St. (S/S) (WT410160682), N. 40th St. to N. 41st St. (12 working days); N. 49th St. (WT410180606), W. Congress St. to 400' N/O W. Congress St. (14 working days); N. 46th St. (WT410180607), 470' N/O W. Glendale Ave. to W. Hampton Ave. (28 working days); W. Stark St. / N. 77th St. (WT410180666), W. 76th St. to W. Hampton Ave. (27 working days); W. Constance Ave. (WT410180674), W. Fond Du Lac Ave. to W. Medford Ave. (10 working days); N. 72nd St. (WT410180676), W. Leon Tr. to W. Villard Ave. (16 working days); N. 71st St. (WT410180677), W. Lancaster Ave. to W. Villard Ave. (26 working days); N. 68th St. (WT410180678), W. Stark St. to W. Villard Ave. (55 working days). (Note: Contractor to furnish and install approximately 6,316 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/05/2018 04:30 PM UTC
OFFICIAL NOTICE 33-1-2018
CONCRETE ALLEY PAVEMENT AND WATERPROOFING ATOP THE MECHANICAL SHOP AT THE POLICE ADMINISTRATION BUILDING 951 NORTH JAMES LOVELL STREET MILWAUKEE WI
03/02/2018 04:30 PM UTC
OFFICIAL NOTICE 40-1-2018
LEAD SERVICE LINE REPLACEMENT, at 60 locations, by qualified City of Milwaukee licensed and bonded contractors. All locations will be licensed childcare facilities in the City of Milwaukee.
03/02/2018 04:30 PM UTC
OFFICIAL NOTICE 9-1-2018
EPOXY OVERLAY AT THE 6TH STREET VIADUCT AND WEST VLIET STREET OVER CPRW BRIDGES
03/01/2018 04:30 PM UTC
OFFICIAL NOTICE 13-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216180103) - Asphalt Concrete Overlays Locations: N. 4th St. – W. Wells St. to W. Kilbourn Ave., W. Cherry St. – N. 6th St. to The Milwaukee River., N. Jackson St. - E. Kilbourn Ave. to E. Ogden Ave., N. Milwaukee St. - E. Clybourn St. to E. Wisconsin Ave., W. North Ave. – N. 9th St. to W. Fond Du Lac Ave., N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
02/28/2018 04:30 PM UTC
OFFICIAL NOTICE 36-1-2018
HYDRANT ALTERATIONS & WATER MAIN RELAYS at the following locations: S. 108th St. (WT410170003), W. Beloit Rd. to W. Howard Av. (7 working days), S. 108th St. (WT410170005), W. Edgerton Av. to W. College Av. (40 working days), W. Wisconsin Av. (WT410170012), N. 20th St. to N. 38th St. (12 working days), W. Greenfield Av. (WT410170013), S. Cesar Chavez E. Dr. to S. 35th St. (38 working days), W. Oklahoma Av. (WT410170015), S. 49th St. to S. 60th St. (6 working days), E. Wells St. / W. Wells St. (WT410180009), N. Broadway to N. 6th St. (6 working days) . (Note: Contractor to furnish and install approximately 2,106 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/28/2018 04:30 PM UTC
OFFICIAL NOTICE 2-1-2018
PROJECT NO. 1: NEW STORM SEWER MAIN CONSTRUCTION in: S. 6th St. – W. Dakota St. to 180’ S. of W. Dakota St. S. 7th St. – W. Montana St. to W. Dakota St. W. Dakota St. – S. 6th St. to S. 11th St.
02/27/2018 04:30 PM UTC