General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 49-1-2018
COUNTING, PROCESSING AND DEPOSITING PARKING METER COIN COLLECTIONS FOR THE CITY'S APRROXIMATELY 7,000+ PAID PARKING METER SPACES
04/10/2018 03:30 PM UTC
OFFICIAL NOTICE 063-1-2018
GREEN STREET BIOSWALES IN: W. Mill Rd. – 26’ ± East of N. 46th St. to 300” ± East of N. 89th St. & W. Good Hope Rd. – 110” ± East of N. Granville Rd to 200” ± East of N. 97th St.
04/05/2018 03:30 PM UTC
OFFICIAL NOTICE 003-1-2018
PROJECT NO. 1: COMBINED SEWER MAIN RELAY: Located at: N. 11th St. – W. Keefe Ave. to W. Finn Pl. N. 12th St. – W. Atkinson Ave. to W. Abert Pl. N .14th St. – 480’ +/- S of W. Ring St. to W. Concordia Ave. N. 18th St. – 115’ S of W. Galena St. to W. Galena St. W. Groeling Ave. – N. 13th St. to N. 14th St.
04/04/2018 03:30 PM UTC
OFFICIAL NOTICE 003-2-2018
COMBINED SEWER MAIN SLIP LINING AND MANHOLE REPAIR AND LINING: Located at: N. 26th St. (E/S) – W. Walnut St. to 200' +/- North of W. North Ave.
04/04/2018 03:30 PM UTC
OFFICIAL NOTICE 60-1-2018
LOCAL RIGHT OF WAYS MOWING ADJOINING STATE HIGHWAYS. Areas to be mowed include multiple local street rights of way segments adjoining state highways I-43, I-94, I-41, 145, and 175.
04/03/2018 03:30 PM UTC
OFFICIAL NOTICE 21-1-2018
2018 CITY WIDE BIO-RETENTION FACILITY MAINTENANCE. Located at: Various locations throughout the City
03/19/2018 03:30 PM UTC
OFFICIAL NOTICE 45-1-2018
WATER MAIN RELAYS at the following locations: S. 70th St. (2018-611), W. Euclid Ave. to 160' S/O W. Ohio Ave. (31 working days); W. Euclid Ave. (2018-612), S. 68th St. to S. 70Th St. (23 working days); W. Montana St. (2018-618), S. 55th St. to S. 58th St. (38 working days); S. 84th St. (2018-627), W. Morgan Ave. to W. Warnimont Ave. (22 working days); S. 75th St. (2018-682), W. Verona Ct. to W. Morgan Ave. (21 working days); S. 73rd St. (2018-683), W. Holt Ct. to W. Morgan Ave. (14 working days); S. 61st St. (2018-688), W. Montana St. to W. Oklahoma Ave. (47 working days); W. Wedgewood Dr. (2018-689), S. 68th St. to S. Honey Creek Dr. (10 working days); (Note: Contractor to furnish and install approximately 7,241 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/16/2018 03:30 PM UTC
OFFICIAL NOTICE 57-1-2018
HYDRANT ALTERATIONS & WATER MAIN ALTERATIONS at the following locations: S. 108th St. (WT410170003), W. Beloit Rd. to W. Howard Av. (7 working days), S. 108th St. (WT410170005), W. Edgerton Av. to W. College Av. (40 working days), W. Wisconsin Av. (WT410170012), N. 20th St. to N. 38th St. (12 working days), W. Oklahoma Av. (WT410170015), S. 49th St. to S. 60th St. (6 working days), E. Wells St. / W. Wells St. (WT410180009), N. Broadway to N. 6th St. (6 working days) . (Note: Contractor to furnish and install approximately 792 lin. ft. of 16”, 12”, 8” & 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/13/2018 03:30 PM UTC
OFFICIAL NOTICE 58-2018
WATER MAIN ALTERATIONS & RELAY at the following locations: W. Greenfield Av. (WT410170013), S. Cesar Chavez E. Dr. to S. 35th St. (38 working days (Note: Contractor to furnish and install approximately 1,314 lin. ft. of 8” & 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
03/13/2018 03:30 PM UTC
OFFICIAL NOTICE 8-1-2018
REHABILITATION OF THE KILBOURN TUNNELS
03/12/2018 03:30 PM UTC
831 - 840 of 1490 Solicitations
1 2 80 81 82 84 86 87 88 148 149