General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 21-1-2026
WATER MAIN RELAYS located at: W. Norwich St. (WT410230630), 200’ E/O S. 80th St. to S. 80th St. (4 working days); S. 80th St. (WT410230631), W. Van Beck Av. To W. Norwich St. (5 working days); W. Van Beck St. (WT410230632), 180’ E/O S. 80th St. to S. 80th St. (5 working days); W. Eden Ct. (WT410230649), S. Massachusetts Av. To 145’ W/O S. Massachusetts Av. (5 working days); S. Massachusetts Av. (WT410230650), W. Morgan Av. To W. Warnimont Av. (12 working days); W. Eden Pl. (WT410230651), W. Warnimont Av. To S. Massachusetts Av. (10 working days); S. 71st St. (WT410230652), S. Sunset Dr. to S. Massachusetts Av. (21 working days);, W. Wilbur Ct. (WT410230653), S. 71st St. to 140’ W/O S. 71st St. (6 working days); W. Howard Av. (WT410230678), S. 68th St. to 125’ W/O S. 69th St. (8 working days); S. 69th St. (WT410230679), W. Howard Av. to 255’ S/O W. Howard Av. (7 working days); S. Herman St. (WT410220628), E. Saveland Av. to E. Howard Av. (19 working days); W. Howard Av. (WT410250777), 235’ E/O S. Miner St. to 125’ E/O S. Miner St. (20 working days). (Note: Contractor to furnish and install approximately 5,419 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/05/2026 04:30 PM UTC
OFFICIAL NOTICE 28-1-2026
PROJECT NO. 1: 2026 SANITARY BYPASS PUMP REHABILITATION Located at: VARIOUS LOCATIONS
02/11/2026 04:30 PM UTC
OFFICIAL NOTICE 27-1-2026
STORM SEWER MAIN RELAY IN: SE-2785 (N. of W. Lolita Ave.) – N. 99th St. to 125’ of N. 99th St.
02/12/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 018-1-2018
REMOVAL OF ACCUMULATED MATERIALS AND SEDIMENT FROM THE LINCOLN YARDS STORM WATER POND Located at: 3801 West Lincoln Avenue
07/20/2018 03:30 PM UTC
OFFICIAL NOTICE 84-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211180105 – N. 49th St. - W. Villard Ave. to W. Custer Ave.
07/20/2018 03:30 PM UTC
OFFICIAL NOTICE 83-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 7” CONCRETE PAVEMENT, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150112 – N. 87th St. - W. Silver Spring Dr. to W. Fond Du Lac Ave.
07/19/2018 03:30 PM UTC
OFFICIAL NOTICE 80-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211140127 – W. Carmen Ave. – N. 68th St. to N. 76th St.
07/18/2018 03:30 PM UTC
OFFICIAL NOTICE 72-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST212140103 – Alley Bounded By: W. Fairmount Ave., W. Villard Ave., N. 51st Blvd., & N. 53rd St. (Permeable Alley) ST212160101 – Alley Bounded By: W. Auer Ave., W. Hopkins St., N. 23rd St., N. 24th St.
07/13/2018 03:30 PM UTC
OFFICIAL NOTICE 71-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (1/2), VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT (3/8), VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, REMOVE AND SALVAGE GRANITE PAVERS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at: ST 212070113 – Alley Bounded By: W. Forest Home Ave., W. Ohio Ave., W. Oklahoma Ave., S. 43rd St., S. 44th St. - City Limits ST212160109 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 7th St., S. 8th St. ST212160108 – Alley Bounded By: W. Hayes Ave., W. Lincoln Ave., S. 8th St., S. 9th St. ST212160107 – Alley Bounded By: W. Cleveland Ave., S. 15th Pl., S. 16th St., KK River.
07/12/2018 03:30 PM UTC
OFFICIAL NOTICE 92-1-2018
PROJECT NO. 1: GREEN STREET BIOSWALES: Located at: S. 76th St. – 485' +/- South of W. Van Beck Ave to 190' +/- South of W. Ohio Ave.
07/11/2018 03:30 PM UTC
OFFICIAL NOTICE 102-1-2018
Milwaukee Fire Department Head Quarters Curtain Wall Refinishing 711 West Wells Street Milwaukee WI
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 90-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, TRACK ZONE REMOVALS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at: ST211180104 - N. 41st St. - W. Meinecke Ave. to W. Wright St. ST211180116 - N. 52nd St. – W. Lisbon Ave. to W. Center St.
07/10/2018 03:30 PM UTC
OFFICIAL NOTICE 99-1-2018
WATER MAIN RELAYS at the following locations: S. 18th St (WT410180625), W. Whitaker Ave. to W. Bottsford Ave. (10 working days); W. Whitaker Ave. (WT410180626), 360’ E/O S. 18th St to S 18th St. (10 working days); S. Logan Ave (WT410180632), S. Whitnall Ave to E. Price Ct. (58 working days); E. Van Norman Ave (WT410180633), S. Lenox St to S. Logan Ave. (10 working days). (Note: Contractor to furnish and install approximately 3,856 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/09/2018 03:30 PM UTC
821 - 830 of 1525 Solicitations
1 2 79 80 81 83 85 86 87 152 153