General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 9-1-2018
EPOXY OVERLAY AT THE 6TH STREET VIADUCT AND WEST VLIET STREET OVER CPRW BRIDGES
03/01/2018 04:30 PM UTC
OFFICIAL NOTICE 13-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216180103) - Asphalt Concrete Overlays Locations: N. 4th St. – W. Wells St. to W. Kilbourn Ave., W. Cherry St. – N. 6th St. to The Milwaukee River., N. Jackson St. - E. Kilbourn Ave. to E. Ogden Ave., N. Milwaukee St. - E. Clybourn St. to E. Wisconsin Ave., W. North Ave. – N. 9th St. to W. Fond Du Lac Ave., N. Wahl Ave. – N. Terrace Ave. to N. Lake Dr.
02/28/2018 04:30 PM UTC
OFFICIAL NOTICE 36-1-2018
HYDRANT ALTERATIONS & WATER MAIN RELAYS at the following locations: S. 108th St. (WT410170003), W. Beloit Rd. to W. Howard Av. (7 working days), S. 108th St. (WT410170005), W. Edgerton Av. to W. College Av. (40 working days), W. Wisconsin Av. (WT410170012), N. 20th St. to N. 38th St. (12 working days), W. Greenfield Av. (WT410170013), S. Cesar Chavez E. Dr. to S. 35th St. (38 working days), W. Oklahoma Av. (WT410170015), S. 49th St. to S. 60th St. (6 working days), E. Wells St. / W. Wells St. (WT410180009), N. Broadway to N. 6th St. (6 working days) . (Note: Contractor to furnish and install approximately 2,106 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/28/2018 04:30 PM UTC
OFFICIAL NOTICE 2-1-2018
PROJECT NO. 1: NEW STORM SEWER MAIN CONSTRUCTION in: S. 6th St. – W. Dakota St. to 180’ S. of W. Dakota St. S. 7th St. – W. Montana St. to W. Dakota St. W. Dakota St. – S. 6th St. to S. 11th St.
02/27/2018 04:30 PM UTC
OFFICIAL NOTICE 2-2-2018
COMBINED SEWER RELAY in: Alley N. of W. Highland Ave. – N. Old World Third St. to 170’ W. of N. Old World Third St.
02/27/2018 04:30 PM UTC
OFFICIAL NOTICE 2-3-2018
2018 Sanitary Manhole and Sewer Structures Inspection Project in: Various areas throughout the City
02/27/2018 04:30 PM UTC
OFFICIAL NOTICE 24-1-2018
LS-35 Coating and Appurtenance Modifications to East Ground Storage Tank at Lincoln Booster Station
02/26/2018 04:30 PM UTC
OFFICIAL NOTICE 35-1-2018
WATER MAIN RELAYS at the following locations: S. 16th St. (WT410180001), 310’ N.O W. Holmes Av. to W. Holmes Av. (11 working days); N. 73rd St. (WT410180002), W. Capitol Dr. to W. Ruby Av. (93 working days); W. Beckett Av. (WT410180003), N. 73rd St. to W. Fiebrantz Av. (16 working days); W. Fiebrantz Av. (WT410180004), N. 72nd St. to W. Beckett Av. (20 working days); W. Perkins Pl. (WT410180005), W. Beckett Av. to W. Appleton Av. (13 working days); W. Locust St. (WT410160679), N. 29th St. to W. Fond du Lac Av. (21 working days). (Note: Contractor to furnish and install approximately 6,553 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/26/2018 04:30 PM UTC
OFFICIAL NOTICE 14-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216180104) - Asphalt Concrete Overlays Locations: N. Bartlett Ave. – E. Locust St. to E. Kenwood Blvd., N. Bartlett Ave. – E. Kenwood Blvd. to E. Providence Ave., E/W Burleigh St. - N. Holton St. to N. 7th St., W. Hopkin St. - N. 27th St. to W. Capitol Dr. (Incl. N. 31st St.), N. Sherman Blvd. – W. Congress St. to W. Hampton Ave.
02/23/2018 04:30 PM UTC
OFFICIAL NOTICE 11-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216180101) - Asphalt Concrete Overlays Locations: S. 3rd St. - W. Waterford Ave. to W. Norwich St., S. 6th St. - W. Mitchell St. to W. Greenfield Ave., S. 16th St. - W. Windlake Ave. to W. Mitchell St., W. Clayton Crest Ave. – S. 14th St. to S. 15th Pl., W. Mallory Ave. – S. 13th St. to S. 15th Pl., S. Superior St. – Pt. s/o E. Oklahoma Ave. to E. Russell Ave., W. Upham Ave. – S. 14th St. to S. 15th Pl.
02/22/2018 04:30 PM UTC
851 - 860 of 1490 Solicitations