We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 32-2-2018
COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 4th St. – W. Wells St. to 215’ +/- N. of W. Wells St. N. Old World Third St.- 215’ +/- S. of W. Wells St. to W. Wells St. N. Plankinton Ave. – W. Wells St. to W. Kilbourn Ave. W. Montana St. – S. 6th St. to S. 9th St.
02/15/2018 04:30 PM UTC
OFFICIAL NOTICE 30-1-2018
City-Wide Removal of Weeds and Tall Grasses, Sidewalk Snow and Ice and Right-of-Way Encroachments from Private Property in Violation of City Ordinance 80-17, 116-8, and 116-55.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-1-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 1: City-Owned Lot Area 4: Area bounded by North Avenue, North 20th Street, Capitol Drive, and North 13th Street.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-2-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 2: City-Owned Lot Area 5: Area bounded by North Avenue, North 13th Street, Capitol Drive, and Interstate 43.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-3-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 3: City-Owned Lot Area 6: Area bounded by North Avenue, Interstate 43, Capitol Drive, and east City limit.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-4-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 4: City-Owned Lot Area 7: Area bounded by Walnut Avenue, west City limit, North Avenue, and North 20th Street.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-5-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 5: City-Owned Lot Area 8: Area bounded by Interstate 94, west City limit, Walnut Avenue, and North 20th Street.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-6-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 6: City-Owned Lot Area 9: Area bounded by Interstate 94, North 20th Street, North Avenue, and east City limit.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-7-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 7: City-Owned Lot Area 10: Area bounded by Interstate 94 and south City limit.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 25-1-2018
STORM SEWER MAIN RELAY, NEW STORM SEWER MAIN CONSTRUCTION, STORM SEWER MAIN LINING, AND MANHOLE REPAIR & LINING in: W. St. Paul Ave. – Intersection of N. 16th St. (Beneath Viaduct) N. 44th St. – W. Fiebrantz Ave. to W. Hope Ave. N. 52nd St. – W. Lisbon Ave. to W. Center St. W. Clarke St. – N. 52nd St. to 120’ +/- West of N. 52nd St. ** Attendance at a Pre-Bid meeting to discuss the W. St. Paul Ave. Project on Wednesday, January 24, 2018 at 1:30 PM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
01/31/2018 04:30 PM UTC