The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 81-1-2025
PROJECT NO.1: ROADWAY NARROWING, PAVING, GREEN INFRASTRUCTURE, AND TRAFFIC SAFETY PROJECT IN: S. 1ST St. – S. Chase Ave. to W. Lincoln Ave.
08/07/2025 03:30 PM UTC
OFFICIAL NOTICE 91-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
08/08/2025 03:30 PM UTC
OFFICIAL NOTICE 78-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; Street Lighting Upgrades for: ST3202318100 – Street Lighting Improvement for Carbon Reduction Program @ Various Locations
08/15/2025 03:30 PM UTC
OFFICIAL NOTICE 90-1-2025
CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, PAVERS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS, GRAVEL FILLING, CRUSHED GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER ALTERATIONS, STREET LIGHTING, UNDERGROUND CONDUIT, LANDSCAPING, TOPSOILING, ETC.
08/19/2025 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 77-1-2018
POLICE DISTRICT STATIONS ADA REMODELING 2ND DISTRICT, 245 W LINCOLN AVENUE 4TH DISTRICT, 6929 W SILVER SPRING DRIVE, 6TH DISTRICT, 3006 S 27TH STREET 7TH DISTRICT, 3626 W FOND DU LAC AVENUE MILWAUKEE, WI
05/25/2018 03:30 PM UTC
OFFICIAL NOTICE 61-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/24/2018 03:30 PM UTC
OFFICIAL NOTICE 78-1-2018
WATER MAIN RELAYS at the following locations: W. Crossfield Av. (WT410180654), W. Douglas Av. to W. Bender Av. (17 working days); W. Winfield Av. (WT410180655), W. Bender Av. to 190 Ft. E/O N. 89th St. (17 working days); W. Bender Av. (WT410180656), N. Joyce Av. to N. 91st St. (34 working days); W. Monrovia Av. (WT410180657), W. Crossfield Av. to W. Bender Av. (35 working days); N. 89th St. (WT410180658), W. Lynx Av. to W. Monrovia Av. (13 working days); W. Douglas Av. (WT410180659), N. Joyce Av. to N. 89th St. (30 working days); W. Lynx Av. (WT410180660), N. 84th St. to N. 89th St. (45 working days); N. Joyce Av. (WT410180661), W. Lynx Av. to W. Mill Rd. (36 working days); N. 86th Ct. (WT410180662), N. Joyce Av. to 320 Ft. NE/O N. Joyce Av. (11 working days); W. Kaul Av. (WT410180663), N. 84th St. to N. 87th St. (28 working days); N. 87th St. (WT410180664), W. Kaul Av. to W. Douglas Av. (13 working days). (Note: Contractor to furnish and install approximately 13,199 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/23/2018 03:30 PM UTC
OFFICIAL NOTICE 005-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING AND MANHOLE REPAIR AND LINING in: Located at: N. 33rd St. – 220’ +/- South of W. Clybourn St. to W. Clybourn St. N. 41st St. – W. Hampton Ave. to W. Stark St. E. Bradford Ave. – N. Frederick Ave. to N. Maryland Ave. E. Wisconsin Ave. – N. Broadway to N. Water St.
05/22/2018 03:30 PM UTC
OFFICIAL NOTICE 41-1-2018
LINCOLN GARAGE REROOFING 3921 W LINCOLN AVENUE MILWAUKEE, WISCONSIN
05/21/2018 03:30 PM UTC
OFFICIAL NOTICE 66-1-2018
POLICE ADMINISTRATION BUILDING 3RD FLOOR RENOVATIONS 749 WEST STATE STREET MILWAUKEE WI 53233
05/17/2018 03:30 PM UTC
OFFICIAL NOTICE 76-1-2018
Poured-In-Place Resilient Rubber Surface Installation Various MKE Parks Locations Milwaukee WI
05/14/2018 03:30 PM UTC
OFFICIAL NOTICE 65-1-2018
WATER MAIN RELAY at the following location: W. Vliet St. (WT410180007), N. 12th St. to N. 27th St. (120 working days). (Note: Contractor to furnish and install approximately 7,548 lin. ft. of 16", 12", 8", 6", 4" and 3" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/07/2018 03:30 PM UTC
OFFICIAL NOTICE 62-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/03/2018 03:30 PM UTC
OFFICIAL NOTICE 75-1-2018
LEAD SERVICE LINE REPLACEMENT, at 40 locations, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods. All locations will be licensed childcare facilities in the City of Milwaukee. The address of each location is included in the bid documents, along with additional site-specific information. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement.
04/30/2018 03:30 PM UTC