General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 32-1-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 32-2-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W Capitol Drive and W I-94.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 32-3-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 7-1-2017
COMBINED AND STORM SEWER MAIN RELAY in: Located at: S. 60th St. – W. Morgan Ave. to W. Forest Home Ave. W. Windlake Ave. – W. Burnham St. to S. 10th St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-2-2017
COMBINED SEWER MAIN LINING, AND MANHOLE REPAIR & LINING in: N. 6th St. – W. Highland Ave. to W. Juneau Ave.; N. 20th St. – W. Vliet St. to 220'+/- N. of W. Vliet St.; W. Lloyd St. (Ext'd) – W. Fond Du Lac Ave. to N. 20th St.; W. State St. – N. James Lovell St. to N. 8th St.; W. Walnut St. – N. Dr. Martin Luther King Dr. to N. 6th St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-3-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Located at: N. 2nd St. – 295’ S. of W. Wright St. to 295’ N of W. Clarke St. W. Meinecke Ave. – N. 1st St. to N. Dr. Martin Luther King Jr. Dr. W. Wright St. – N. 1st St. to N. 2nd St. **Attendance at a Pre-Bid meeting on Friday, February 17, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 7-4-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Alley East of N. Water St. - E. Chicago St. to 220' +/- North of E. Chicago St., E. Michigan St. - N. Jackson St. to N. Van Buren St., N. Van Buren St. - E. Wisconsin Ave. to Pt. South of E. Michigan St.
02/27/2017 04:30 PM UTC
OFFICIAL NOTICE 6-1-2017
SANITARY BUILDING SEWER (LATERAL) LINING AND REPAIR IN: AREA BOUNDED BY WEST LAYTON AVENUE TO WEST EDGERTON AVENUE FROM SOUTH 20TH STREET TO SOUTH 27TH STREET **Attendance at a Pre-Bid meeting on Monday, February 20, 2017 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. The Contractor must submit all required pre-qualification product, manufacturer, and installer documents to the City of Milwaukee at the following address: 841 North Broadway, Milwaukee WI 53202, ATTN: Mr. Zafar Yousuf, by no later than Monday February 20, 2017.
02/24/2017 04:30 PM UTC
OFFICIAL NOTICE 1-1-2017
Install skid-resistant, solid surface plating on the North Emmber Lane and North Plankinton Avenue open grate lift bridges over the Menomonee River.
02/23/2017 04:30 PM UTC
OFFICIAL NOTICE 21-1-2017
WATER MAIN RELAYS in the following location: Water Main Relays – S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days)
02/22/2017 04:30 PM UTC
971 - 980 of 1476 Solicitations
1 2 94 95 96 98 100 101 102 147 148