General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
OFFICIAL NOTICE 32-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8 REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: TD11584013 – In East Michigan Street – North Cass Street to North Lincoln Memorial Drive
05/15/2025 03:30 PM UTC
OFFICIAL NOTICE 13-1-2025
South 20th Street Culvert Rehabilitation
05/21/2025 03:30 PM UTC
OFFICIAL NOTICE 4-1-2025
Street Lighting LED upgrades CRP Area C: ST320240910 – South City Limits to East/West Oklahoma Avenue, Lake Michigan to West City of Milwaukee Limits Street Lighting Upgrades (Wisconsin Department of Transportation ID No. 2984-55-74)
05/22/2025 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 76-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, SEALING PAVEMENT JOINTS AND CRACKS, CONCRETE REMOVALS, AND SEWER WORK, ETC., located at (ST211150114) N. 54th Blvd. - W. Keefe Ave. to W. Melvina St. (ST211150184) W. Walker St. - S. 2nd St. to S. 3rd St.
07/12/2016 03:30 PM UTC
OFFICIAL NOTICE 85-1-2016
WATER MAIN RELAYS & HYDRANT ALTERATIONS – W. Tallmadge Pl. (N. 73rd St) (WT410160645), 500’ S/O N. Prentiss St. to N. Prentiss St. (14 Working Days); W. Sheridan Ave. (WT410160646), N. 69th St. to N. 76th St. (56 Working Days); N. Prentiss St. (WT410160647), W. Tallmadge Pl. to W. Sheridan Ave. (16 Working Days); N. 74th St. (WT410160648), W. Custer Ave. to W. Tallmadge Pl. (19 Working Days); W. Elm St. (WT410160010), N. Teutonia Ave. to 1600’ W/O N. Teutonia Ave. (6 Working Days).
07/11/2016 03:30 PM UTC
OFFICIAL NOTICE 86-1-2016
Water Main Relays – W. Hope Ave. (WT410160656), N. 74th St. to N. 75th St. (12 Working Days); N. 69th St. (WT410160657), W. Fiebrantz Ave. to W. Marion St. (43 Working Days Days); N. 78th St. (WT410160703), W. Luscher Ave. to W. Gertrude Dr. (16 Working Days); W. Gertrude Dr. (WT410160704), W. Stark St. to W. Palmetto Ave. (17 Working Days). (Note: Contractor to furnish and install approximately 3,280 lin. ft. of 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/08/2016 03:30 PM UTC
OFFICIAL NOTICE 81-1-2016
MILWAUKEE & MICHIGAN PARKING STRUCTURE ELEVATOR MODERNIZATION 535 NORTH MILWAUKEE STREET MILWAUKEE, WI
07/01/2016 03:30 PM UTC
OFFICIAL NOTICE 66-1-2016
COMBINED SEWER MAINS RELAY AND COMBINED SEWER LINING, MANHOLE REPAIR AND LINING in: S. 6th St. – W. Becher St. to 115’+/- North of W. Lincoln Ave., S. 35th St. – W. National Ave. to W. Scott St., W. Lincoln Ave. – S. 7th St. to S. 8th St., W. Lincoln Ave. – S. 20th St. to S. 21st St. & W. Lincoln Ave. – S. 26th St. to S. Layton Blvd.
06/30/2016 03:30 PM UTC
OFFICIAL NOTICE 77-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PAVEMENT MARKING, ETC, located at (ST211150196) – W. Glendale Ave. – N. 29th St. to N. 31st St. (ST211150197) - N. 29th St. - W. Courtland Ave. to W. Hampton Ave. (ST211140171) – S. 20th St. – W. Rogers St. to W. Burnham St. (ST211160123) - W. Mt. Vernon Ave. – N. 31st St. to N. 32nd St. (ST211160112) - N. 22nd St. - W. Cherry St. to W. Walnut St. (ST211160116) – S. 8th St. - W. Rogers St. to W. Burnham St. (ST211160114) - N. 18th St. - W. Highland Ave. to W. Vliet St. (ST211160115) – W. Juneau Ave. – N. 17th St. to N. 20th St. (ST211160124) - S. 33rd St. - W. Scott St. to W. National Ave. (ST211160133) - N. 53rd St. - W. North Ave. to W. Clarke St. (ST211160133) - N. 9th St. - W. Lloyd St. to W. Garfield Ave (ST211130149) N. Buffum St. – E. Burleigh St. to E. Auer Ave. (ST211160132) N. 39th St. – W. Lloyd St. to W. North Ave. (ST211160137) N. Grant Blvd. – W. Meinecke Ave. to W. Clarke St. (ST211160140) W. Ohio Ave. – S. 24th St. to S. 27th St. (ST211160142) W. Becher St. – S. Muskego Ave. to S. 26th St. (ST211160155) N. 9th St. – W. Meinecke Ave. to W. Wright St. (ST211160160) N. 39th St. – W. Center St. to W. Hadley St. (ST211160150) N. 40th St. – W. Clarke St. to W. Center St.
06/30/2016 03:30 PM UTC
OFFICIAL NOTICE 79-1-2016
WATER MAIN RELAYS, located at the following locations: E. Cora Ave. (WT410160631), S. Rutland Ave. to S. Arctic Ave. (10 Working Days); E. Tripoli Ave. (WT410160632), S. Iowa Ave. to S. Arctic Ave. (15 Working Days); S. Iowa Ave. (WT410160677), E. Norwich Ave. to E. Tesch Ave. (10 Working Days), S. 1st St. (WT410160678), W. Norwich St. to 340’ South of W. Norwich St. (12 Working Days); S. Clement Ave. (WT410160714), E. Holt Ave. to E. Morgan Ave. (9 Working Days)
06/23/2016 03:30 PM UTC
OFFICIAL NOTICE 72-1-2016
Neighborhood Task Force Window Replacement 4715 W. Vliet St. Milwaukee, WI
06/15/2016 03:30 PM UTC
OFFICIAL NOTICE 29-1-2016
CONSTRUCTION OF BIORETENTION FACILITIES AND SITE WORK INCLUDING CONSTRUCTION OF 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE DRIVEWAYS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC, located at: (ST21100147) E. Stewart St. - S. Marina Dr. to S. Hilbert St.
06/10/2016 03:30 PM UTC
OFFICIAL NOTICE 70-1-2016
WATER MAIN RELAYS, located at the following locations: W. Good Hope Rd. (S/S) (WT410160669), N. Teutonia Ave. to N. 38th St. (12 Working Days); W. Boehlke Ave. (WT410160670), N. 42nd St. to N. 43rd St. (10 Working Days); W. Newton Pl. (WT410160701), N. 42nd St. to N. 43rd St. (16 Working Days); N. 35th St. (WT410160702), W. Oriole Dr. to W. Florist Ave. (36 Working Days); W. Reichert Pl. (WT410160716), N. 27th St. to 240’ W/O N. 27th St. (11 Working Days); N. 42nd St. (WT410160752), 315’ N/O W. Newton Pl. (3 Working Days)
06/09/2016 03:30 PM UTC
1001 - 1010 of 1449 Solicitations
1 2 97 98 99 101 103 104 105 144 145