General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 29-4-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 4: City-Owned Lot Area 7: Area bounded by Walnut Avenue, west City limit, North Avenue, and North 20th Street.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-5-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 5: City-Owned Lot Area 8: Area bounded by Interstate 94, west City limit, Walnut Avenue, and North 20th Street.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-6-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 6: City-Owned Lot Area 9: Area bounded by Interstate 94, North 20th Street, North Avenue, and east City limit.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 29-7-2018
CITY-OWNED LOT LANDSCAPE MAINTENANCE in the following locations: Project 7: City-Owned Lot Area 10: Area bounded by Interstate 94 and south City limit.
02/06/2018 04:30 PM UTC
OFFICIAL NOTICE 25-1-2018
STORM SEWER MAIN RELAY, NEW STORM SEWER MAIN CONSTRUCTION, STORM SEWER MAIN LINING, AND MANHOLE REPAIR & LINING in: W. St. Paul Ave. – Intersection of N. 16th St. (Beneath Viaduct) N. 44th St. – W. Fiebrantz Ave. to W. Hope Ave. N. 52nd St. – W. Lisbon Ave. to W. Center St. W. Clarke St. – N. 52nd St. to 120’ +/- West of N. 52nd St. ** Attendance at a Pre-Bid meeting to discuss the W. St. Paul Ave. Project on Wednesday, January 24, 2018 at 1:30 PM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project.
01/31/2018 04:30 PM UTC
OFFICIAL NOTICE 19-1-2018
2018 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/30/2018 04:30 PM UTC
OFFICIAL NOTICE 1-1-2018
SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING in: W. Cleveland Ave. – W. Kinnickinnic River Pkwy. to S. 67th St.
01/24/2018 04:30 PM UTC
OFFICIAL NOTICE 27-1-2018
LEAD SERVICE LINE REPLACEMENT, at 50 locations, by qualified City of Milwaukee licensed and bonded contractors. Locations will be at various sites throughout the City of Milwaukee.
01/22/2018 04:30 PM UTC
OFFICIAL NOTICE 20-1-2018
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING in: E. Michigan St. – N. Jackson St. to N. Van Buren St.
01/04/2018 04:30 PM UTC
OFFICIAL NOTICE 108-1-2017
SANITARY SEWER MAIN LINING, REPAIR AND MANHOLE REPAIR & LINING in: Area Bounded By: W. Oklahoma Ave. to E. Bottsford Ave. from S. Kansas Ave. to S. 14th St.
12/21/2017 04:30 PM UTC
981 - 990 of 1601 Solicitations
1 2 95 96 97 99 101 102 103 160 161