We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 58-1-2025
WATER MAIN RELAYS, at the following locations: N. 47th St. (WT410220635), W. Garfield Av. to W. Lisbon Ave. (16 working days); W. Garfield Av. (WT410220636), N. 47th St. to N. 49th St. (17 working days); W. Mitchell St. (WT410220637), S. 15th Pl. to S. 16th St. (13 working days); S. 15th Pl. (WT410220638), W. Odell St. to W. Mitchell St. (15 working days); W. Pierce St. (WT410220643), S. 35th St. to S. 36th St. (8 working days); S. 35th St. (WT410220644), 15’ N/O W. Pierce St. to W. Pierce St. (4 working days); N. 42nd St. (WT410220645), W. Hampton Av. to 300’ N/O W. Stark St. (28 working days); W. Luscher Av. (WT410220646), N. 42nd St. to N. Sherman Bl.(E/L) (20 working days); W. Stark St. (WT410220647), N. 42nd St. to N. 46th St. (27 working days); N. 44th St. (WT410220648), W. Stark St. to 300’ N/O W. Stark St. (7 working days); N. 40th St. (WT410240647), W. Stark St. to W. Fairmount Av. (16 working days); W. Stark St. (WT410240648), N. Hopkins St. to N. 42nd St. (18 working days). (Note: Contractor to furnish and install approximately 7,106 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/26/2025 03:30 PM UTC
OFFICIAL NOTICE 67-1-2025
The general work requested is: THE INSTALLATION OF NEW LIGHING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, AND THE REMOVAL OF EXISTING LIGHTING UNITS AND OTHER EXISTING ELECTRICAL APPURTENANCES, ETC.; ST240240506 – Solar Street Lighting System Installation at Various Southside Locations
06/27/2025 03:30 PM UTC
OFFICIAL NOTICE 72-1-2025
Milwaukee Fire Department, Engine House 26 Concrete Floor Repair Project
06/30/2025 03:30 PM UTC
OFFICIAL NOTICE 71-1-2025
PROJECT 1: BIOSWALES: MEAUX PARK (IN VILLARD AVE - N 022ND ST TO N GREEN BAY AVE)
07/01/2025 03:30 PM UTC
OFFICIAL NOTICE 27-1-2025
PROJECT 1: SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & SANITARY SEWER MAIN REPAIR S. 6th St. - W. Ohio Ave. to 480’ S. of W. Ohio Ave. S. Austin St. – E. Van Norman Ave. to E. Armour Ave. N. Bartlett Ave. – E. Kane Pl. to 200’+/- NE. of E. Kane Pl. E. Howard Ave. – S. Kansas Ave. to 210’+/- E. of S. Kansas Ave. E. Howard Ave. – S. Nevada St. to S. Brust Ave. S. Kansas Ave. – E. Howard Ave. to E. Norwich Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 27-2-2025
PROJECT NO. 2: COMBINED SEWER MAIN RELAY Located at: N. 15th St. – W. Concordia Ave. to W. Keefe Ave. N. 16th St. – W. Ring St. to W. Keefe Ave.
07/02/2025 03:30 PM UTC
OFFICIAL NOTICE 68-1-2025
The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around City contracted Johnson Controls as the only acceptable manufacturer to match existing system.
07/03/2025 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 2-1-2017
This project involves the Rehabilitation of the South 1st Street Bascule Bridge over the Kinnickinnic River, P-40-830, including but not limited to; demolition of specified bridge and related components, structural steel, poured-in-place concrete, concrete repairs, reinforcing steel, painting, mechanical and electrical equipment upgrades, bridge house repairs, and incidental work.
02/21/2017 04:30 PM UTC
OFFICIAL NOTICE 30-1-2017
WATER MAIN RELAYS, located at the following locations: W. Thurston Av. (WT410160900), N. Teutonia Av. to N. 34th St. (26 working days); N. 34th St. (WT410160901), W. Thurston Av. to 200’ S/O W. Oriole Dr. (16 working days); N. 62nd St. (WT410160902), W. Fiebrantz Av. to W. Congress St. (55 working days); N. 66th St. (WT410160903), W. Fiebrantz Av. to W. Congress St. (40 working days); N. 64th St. (WT410160904), W. Capitol Dr. to W. Hope Av. (40 working days) (Note: Contractor to furnish and install approximately 7,252 lin. ft. of 12”, 8”, 6” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/20/2017 04:30 PM UTC
OFFICIAL NOTICE 22-1-2017
Water Main Relays - Located at: N. 64th St. (WT410140001), W. Nash St. to 420’ N/O W. Nash St. (15 working days); W. Rohr Ave. (WT410170002), N. 48th St. to N. 49th St. (12 working days); N. 76th St. (WT410140009), W. Grantosa Dr. to W. Florist Ave. (10 working days); N. 91st St. (WT410170616), W. Keefe Ave. to W. Metcalf Pl. (12 working days); W. Concordia Ave. (WT410170659), N. 98th St. to N. 99th St. (14 working days); N. 98th St. (WT410170660), W. Concordia Ave. to W. Townsend St. (21 working days); W. Park Hill Ave. (WT410170663), W. Mt. Vernon Ave. to N. 93rd St. (14 working days); (Note: Contractor to furnish and install approx. 2951 lin. ft. of 12”, 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
02/16/2017 04:30 PM UTC
OFFICIAL NOTICE 10-1-2017
2017 SANITARY MANHOLE INSPECTION, SEWER STRUCTURES INSPECTION AND CITY UNDERGROUND CONDUIT MANHOLE INSPECTION PROJECT
02/10/2017 04:30 PM UTC
OFFICIAL NOTICE 5-1-2017
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING, AND MANHOLE REPAIR & LINING in: Located at: S. 18th St. – W. Scott St. to W. Greenfield Ave. S. 25th St. - W. Greenfield Ave. to W. Orchard St. S. 29th St. - W. Greenfield Ave. to W. Orchard St. S. 30th St. - W. Greenfield Ave. to W. Orchard St. S. 31st St. – W. Madison St. to W. Greenfield Ave. S. 32nd St. - W. Greenfield Ave. to W. Orchard St. W. Greenfield Ave. – S. 17th St. to S. 26th St. W. Greenfield Ave. – S. 33rd St. to S. 34th St. W. Greenfield Ave. – S. Layton Blvd. to S. 28th St.
01/26/2017 04:30 PM UTC
OFFICIAL NOTICE 9-1-2017
2017 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Testing
01/25/2017 04:30 PM UTC
OFFICIAL NOTICE 4-1-2017
SANITARY, COMBINED AND STORM SEWER MAINS RELAY in: N. 5th St. – W. Juneau Av. to W. McKinley Av.; N. 14th St. – W. Locust St. to W. Groeling Av.; N. 16th St. – W. State St. to W. Highland Av.; W. Albany Pl. – N. 13th St. to N. Teutonia Av.; N. Teutonia Av. – 295’ S. of W. Center St. to W. Center St.; W. Groeling Av.– N. 14th St. to N. Teutonia Av.
01/10/2017 04:30 PM UTC
OFFICIAL NOTICE 111-1-2016
COMBINED SEWER MAINS RELAY & COMBINED AND STORM SEWER LINING AND MANHOLE REPAIR & LINING in: N. 35th St. – W. State St. to W. Highland Blvd.; N. 37th St. – W. Wisconsin Ave. to 175’+/- N. of W. Wisconsin Ave.; N. Cass St. – E. Wells St. to E. State St.; W. State St. – N. 34th St. to N. 35th St.; W. Wisconsin Ave. – N. 37th St. to 125’ +/- W. of N. 39th St.
11/29/2016 04:30 PM UTC
OFFICIAL NOTICE 111-2-2016
STORM SEWER MAIN RELAY AND NEW STORM SEWER CONSTRUCTION in: N. 61st St. – W. St. Paul Ave. to 250’ +/- N. of W. St. Paul Ave.; N. 76th St. – 110’ +/- N. of W. Leon Ter. to 140’ +/- N. of W. Sheridan Ave.; N. 76th St. – 280’ +/- S. of W. Grantosa Dr. to W. Medford Ave.; S. Lenox St. – E. Wilbur Ave. to 350’ +/- S. of E. Wilbur Ave.
11/29/2016 04:30 PM UTC
OFFICIAL NOTICE 111-3-2016
COMBINED SEWER LINING AND MANHOLE REPAIR & LINING in: N. 20th St. – W. North Ave. to W. Wright St. **Attendance at a Pre-Bid meeting on Monday, November 21, 2016 at 10:00 AM in Room 820, 841 N. Broadway, Milwaukee, WI 53202 is mandatory to bid on this project. Prequalification documentation is required to be submitted to the Environmental Engineering Section, Room 821, 841 N. Broadway, Milwaukee, WI 53202 prior to the close of business on November 21, 2016.
11/29/2016 04:30 PM UTC