General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 73-1-2026
The general work requested is: 8” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT WITH INTEGRAL CURB, VARIABLE THICKNESS ASPHALT, CONCRETE CURB AND GUTTER, CONCRETE WALK, 7” CONCRETE DRIVEWAY, BASE AGGREGATE, CONCRETE TRAFFIC ISLANDS, ROADWAY FILLING, CATCH BASINS, STORM WATER DRAINS, PAVEMENT REMOVAL, ROADWAY CUTTING, CURB AND GUTTER REMOVAL, CONCRETE SIDEWALK REMOVAL, SAWCUTTING, CATCH BASIN ABANDONMENT, SIGNAGE AND PAVEMENT MARKING REMOVAL, EPOXY AND COLD PLASTIC PAVEMENT MARKING, LIGHTING INSTALLATION, AND OTHER SITE RESTORATION, ETC. Located at: TD06884511 E. Pittsburg Av.- S. Water St. to S. 1st St. (TID 68) TD05684709 E. Menomonee St. - N. Jefferson St. to N. Milwaukee St. (TID 56) TD05684715 Kinnickinnic River Trail Connections (TID 56)
08/11/2026 03:30 PM UTC
OFFICIAL NOTICE 74-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212160107 E. Bradford Ave., N. Prospect Ave., N. Stowell Ave., E. Webster Pl. ST212220116 W. Hopkins St., W. Townsend St., N. 22nd St., N. 23rd St. ST212220107 W. Greenfield Ave., W. Orchard St., S. 22nd St., S. 23rd St. ST212220118 W. Fond du Lac Ave., W. Meinecke St., W. Wright St., N. 22nd St., N. 23rd
08/12/2026 03:30 PM UTC
OFFICIAL NOTICE 75-1-2026
The general work requested is: CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE BASE, PERMEABLE PAVERS, SEALING PAVEMENT JOINTS AND CRACKS, STONE BEDDING, SLURRY BACKFILL, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.; Located at the following Alleys Bounded by (ABB): ST212240109 W. Fiebrantz Ave., W. Hope Ave., N. 62nd St., N. 63rd St. ST212240104 W. Keefe Ave., W. Townsend St., N. 46th St., N. 47th St. ST212240102 W. Appleton Ave., W. Chapman Pl., W. Nash St., W. Potomac Ave.
08/13/2026 03:30 PM UTC
OFFICIAL NOTICE 77-1-2026
60 HYDRANT ALTERATIONS, by qualified City of Milwaukee licensed and bonded contractors. Hydrant alterations will be at scattered locations throughout the Milwaukee Water Works Service area. Hydrant alterations may include, but are not limited to, the procurement of all permits, excavation, traffic control, erosion control, saw-cutting, removal of existing hydrant, restraint of existing hydrant branch, installation of new hydrant assembly, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Aggregate slurry backfill shall be required for all excavations. Aggregate slurry backfill shall be as specified in 4.6.6 of the Water Main Installation Specifications. In paved areas, the slurry must be placed to the pavement subgrade. In grass areas, slurry must be placed to 6” below the finished grade and topsoil must be placed to the surface. Includes any necessary hydroexcavation. Temporary and permanent restoration requirements will be at the discretion of MWW. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.
08/19/2026 03:30 PM UTC
OFFICIAL NOTICE 38-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
08/21/2026 03:30 PM UTC
5 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 114-1-2017
Bricklaying services for various locations.
12/15/2017 04:30 PM UTC
OFFICIAL NOTICE 107-1-2017
SANITARY AND STORM SEWER MAIN RELAY, & SANITARY, STORM AND COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: N. 4th St. – W. Wells St. to 215' +/- North of W. Wells St. N. 35th St. – 200' +/- South of W. Capitol Dr. to W. Capitol Dr. W. Capitol Dr. (N/S) - 335' +/- East of N. 34th St. to N. 35th St. N. Old World Third St. - 215' +/- South of W. Wells St. to W. Wells St. N. Plankinton Ave. – W. Wells St. to W. Kilbourn Ave.
12/07/2017 04:30 PM UTC
OFFICIAL NOTICE 107-2-2017
COMBINED AND STORM SEWER MAIN RELAY in: N. 18th St. – N. Teutonia Ave. to W. Keefe Ave. N. 19th St. – N. Teutonia Ave. to W. Finn Pl. W. Finn Pl. – 125' +/- West of N. Teutonia Ave. to N. 20th St. N. Teutonia Ave. - 175' +/- South East of W. Ring St. to W. Capitol Dr. (Various Locations)
12/07/2017 04:30 PM UTC
OFFICIAL NOTICE 101-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, PAVEMENT GRINDING (ASPHALT), CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150138 - W. Metcalf Pl. - N. 92nd St. to N. 97th St. (Incl. W. Nash St.).
11/14/2017 04:30 PM UTC
OFFICIAL NOTICE 98-1-2017
CONSTRUCTION OF 7” CONCRETE PAVEMENT , VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 6” & 8” CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, PAVEMENT GRINDING (ASPHALT), CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211170101 - N. 44th St. - W. Leon Tr. /W. Roosevelt Dr. to W. Capitol Dr.
11/07/2017 04:30 PM UTC
OFFICIAL NOTICE 59-1-2017
SANITARY SEWER MAIN RELAY, & COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: W. Ohio Ave. – S. 35th St. to S. 39th St. S. Pennsylvania Ave. – E. Euclid Ave. to E. Fernwood Ave. W. Pierce St. – S. 37th St. to S. 39th St.
10/24/2017 03:30 PM UTC
OFFICIAL NOTICE 111-1-2017
ERADICATION OF PAVEMENT MARKINGS, INSTALLATION OF LONGITUDINAL PAVEMENT MARKINGS, INSTALLATION OF OTHER PAVEMENT MARKINGS INCLUDING ARROWS, SYMBOLS, WORDS, STOP LINES, CROSSWALKS, AND GREEN THERMOPLASTIC MARKINGS, AND INSTALLATION OF BICYCLE LANE DELINEATORS; Located at: (ST220170210) W. Locust St. – E. Humboldt Blvd. to N. Oakland Ave. W. North Ave. – N. Bremen St. to N. Cambridge Ave
10/13/2017 03:30 PM UTC
OFFICIAL NOTICE 100-1-2017
CONSTRUCTION OF 8” & 9” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, REPAIR PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150161 - S. California St. - E. Euclid Ave. to E. Oklahoma. Ave. ST211170194 - E. North Ave. @ N. Palmer St., & @ N. Buffum St. ST211170197 - S. Howell Ave. @ E. Montana St., & @ E. Dewey Pl.
10/12/2017 03:30 PM UTC
OFFICIAL NOTICE 83-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST214170106 - W. Michigan St. @ N. 34th St. ST211170183 - N. 84th St. - W. Brentwood Ave. to W. Green Tree Rd. ST211170173 - S. Clement Ave. @ E. Dakota St.
10/10/2017 03:30 PM UTC
OFFICIAL NOTICE 99-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9” CONCRETE PAVEMENT, 8” CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST211150150 - W. Garfield Ave. - N. Dr. MLK Jr. Dr. to N. 4th St. ST211150101 - W. Blue Mound Ct. - 400'e/o N. Story Pkwy. to 50' e/o N. Story Pkwy. TD08284500 - N. Astor St. - E. Kilbourn Ave. to E. State St. (TID-82).
09/29/2017 03:30 PM UTC
991 - 1000 of 1601 Solicitations
1 2 96 97 98 100 102 103 104 160 161