City of Sidney
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment
The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications.
Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor.
Engineer's Estimate: $279,000.00
| 04/09/2026 06:30 PM UTC |
|
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement
The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation.
Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $105,000
| 04/16/2026 03:30 PM UTC |
|
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms.
A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
| 04/22/2026 03:30 PM UTC |
| Number | Deadline |
|---|---|
|
22-10
22-10 COURTVIEW CENTER PARKING LOT
The project includes the 1-1/2” milling and resurfacing of parking lot at the Courtview Center, 100 S. Main Avenue including paint striping and parking stall numbering per specifications.
Construction Estimate: $90,626
ADD #1 Construction Estimate $103,546
| 03/17/2022 04:30 PM UTC |
|
22-09
22-09 Marilyn Drive & Ann Place Sanitary Sewer Replacement
The project includes the replacement of existing sanitary sewer and laterals; reconstruction of curb and roadway; and associated storm sewer work.
Estimate: $612,019
| 03/17/2022 03:30 PM UTC |
|
22-04
22-04 WATER WELL #9 REHABILITATION
The project includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, and appurtenances necessary for the repair and redevelopment of the City's #9 Water Well.
A non-mandatory Pre-Bid Meeting will be held at 9:30 a.m. on Wednesday, February 23, 2022 at the Water Treatment Plant, 880 E. Court Street, Sidney, Ohio. Please RSVP to sepley@sidneyoh.com if you plan to attend the prebid meeting.
Construction Estimate: $60,000
| 03/10/2022 09:00 PM UTC |
|
22-06
22-06 2022 Sidewalk Program
The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching.
Construction Estimate: $209,788
| 03/10/2022 04:30 PM UTC |
|
22-07
22-07 WWTP Biosolids Disposal
Description of Job: The project will include removal and disposal of 500-700 dry tons of Wastewater Treatment Plant biosolids per each year of the Contract.
Budget Amount year 2022 $48,000
| 03/10/2022 04:00 PM UTC |
|
22-05 Taxiway A Rehabilitation & Lighting Improvement
22-05 Taxiway A Rehabilitation & Lighting Improvement
The project includes milling, asphalt crack repair, asphalt pavement, pavement markings, and airfield lighting.
Engineer's Estimate: $401,660
| 03/03/2022 04:00 PM UTC |
|
22-03
22-03 2022 STREET RESURFACING
The project includes planning of asphalt, placement of asphalt surface course, asphalt concrete surface course, thermoplastic paint markings, and traffic loop.
Construction Estimate: $1,450,327
ADDENDUM #1 Construction Estimate: $1,718,967
ADDENDUM #2 Construction Estimate: $1,724,836
ADDENDUM #3 Construction Estimate: No change
| 02/03/2022 09:00 PM UTC |
|
22-02
22-02 Lime Sludge Service Lagoon Cleaning
Description of Job: The project will include removal and disposal of lime softened sludge from the Water Treatment Plant storage lagoon to an approved agricultural site for land application. The estimated dry ton amounts will be based on the City’s yearly budgeted amount.
Budget Amount per year $185,000
| 02/03/2022 08:00 PM UTC |
|
22-01
22-01
2022 CURB & GUTTER REPLACEMENT
The project consists of the removal & replacement of curb & gutter and curb ramps with truncated domes and also includes the reconnection of drain tiles and site restoration.
Construction Estimate: $475,637
| 02/03/2022 04:30 PM UTC |
|
21-16
21-16
Linden/Forest Storm Sewer Improvements
The project includes the replacement of storm sewer outlet at the east end of Forest Street from the last existing storm manhole to where the storm sewer outlets within the CSX Railroad right-of-way.
Construction Estimate is $47,434
| 12/16/2021 09:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.