City of Sidney
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
25-01 Municipal Building Additions & Alterations
25-01 Municipal Building Additions & Alterations
The project consists of the partial demolition of existing structure (1939 building), general, fire protection, plumbing, HVAC, electrical, technology work for construction of a new addition to and renovation of the existing 1975 building and related site work.
A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio. A walk-through of the site will be offered during the pre-bid meeting.
State of Ohio Prevailing Wage Rates for Building Construction apply.
Estimate: $13,900,000
| 02/19/2025 04:30 PM UTC |
25-03 2025 Sidewalk Program
25-03 2025 Sidewalk Program
The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching.
State of Ohio Prevailing Wage Rates apply.
Construction Estimate: $264,930
| 02/13/2025 07:30 PM UTC |
25-06 Foraker Avenue Water & Sewer Replacement
Project name: Foraker Avenue Water & Sewer Replacement
Project Description: The project consists of the replacement of gravity sanitary sewer and water main along Foraker Avenue between Fair Road and Lincoln Street.
The project requires the use of State of Ohio Prevailing Wage Rates for Heavy Highway.
Estimate: $1,261,620
| 02/13/2025 04:30 PM UTC |
25-05 Temporary Office Wiring
25-05 Temporary Office Wiring
The project consists of construction of an electrical service and distribution system to power fifty-six (56) temporary modular office units to be erected on the 200 block of W. Poplar Street.
State of Ohio Prevailing Wage Rates for Building Construction apply.
Estimate: $179,478
| 02/13/2025 03:30 PM UTC |
25-08 Buckeye Avenue Sanitary Sewer Replacement
25-08 Buckeye Avenue Sanitary Sewer Replacement
The project includes replacement of gravity sanitary sewer along Buckeye Avenue.
State of Ohio Prevailing Wage Rates apply.
Estimate: $271,975
| 02/06/2025 04:30 PM UTC |
25-04 Stewart Subdivision Water & Sewer Replacement
25-04 Stewart Subdivision Water & Sewer Replacement
The project consists of the reconstruction of Cheryl Ave., Stewart Dr., & Daniel Pl. including replacement of storm sewer, sanitary sewer waterline, sidewalk, and curb ramps from Vandemark Rd. to Vandemark Rd. Sanitary sewer will also be replaced along Vandemark Rd. from Campbell Rd. to Cheryl Ave.
State of Ohio Prevailing Wage Rates apply.
Estimate: $2,114,226
| 01/30/2025 04:30 PM UTC |
25-02 Fire Station 2 Construction
25-02 Fire Station 2 Construction
The project consists of general, fire protection, plumbing, HVAC, electrical ,and technology work for construction of new fire station and related site work.
A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio.
State of Ohio Prevailing Wage Rates for Building Construction apply.
Estimate: $5,700,000
| 01/29/2025 07:30 PM UTC |
24-14 Pike Street Sanitary Sewer Replacement
24-14 Pike Street Sanitary Sewer Replacement
The project consists of the replacement of approximately 745 l.f. of 8” sanitary sewer along Pike Street between St. Marys Avenue and N. Ohio Avenue including replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits.
State of Ohio prevailing wage rates apply.
Engineer's Estimate: $341,631
| 10/03/2024 03:30 PM UTC |
24-13 McKinley / Spruce Alley Storm Sewer Improvements
24-13 McKinley / Spruce Alley Storm Sewer Improvements
The project consists of the replacement of existing 8” clay sanitary sewer with 8” SDR-35 sanitary sewer including sanitary laterals and replacement of existing 18” clay storm sewer with new 18” reinforced concrete storm pipe including storm manholes and catch basin along the alley connecting McKinley Avenue to Spruce Street and resurfacing the alley from McKinley Avenue to Spruce Street.
State of Ohio Prevailing Wage Rates apply.
Estimate: $193,960
| 08/01/2024 06:30 PM UTC |
24-12 Mulberry Place Improvements
24-12 Mulberry Place Improvements
The project consists of the reconstruction of Mulberry Place between Chestnut Avenue & S. Walnut Avenue including new pavement, curb & gutter, water main, storm sewer, sanitary main and services/laterals in addition to the extension of storm sewer through the alley south of Mulberry Place to Cherry Street including reconstruction of the alley.
State of Ohio Prevailing Wage Rates apply.
Estimate: $544,269
| 08/01/2024 03:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.