26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment
The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications.
Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor.
Engineer's Estimate: $279,000.00
| 04/09/2026 06:30 PM UTC |
|
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement
The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation.
Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $105,000
| 04/16/2026 03:30 PM UTC |
|
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms.
A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
| 04/22/2026 03:30 PM UTC |
| Number | Deadline |
|---|---|
|
25-22 Arrowhead Drive Water Main Replacement OPWC #CM08AC
25-22 Arrowhead Drive Water Main Replacement
OPWC #CM08AC
The project consists of the replacement of the existing 6" and 8" cast iron water main with 8" and 12" C909 DR18 CL 150 PVC water main, bends and fittings; removal and replacement of pavement, curb and gutter, 8" and 12" valves, 3/4" tap for chlorination and testing, 41 water service branches, 8 fire hydrant assemblies, and storm sewer repairs. Note that project is not to begin until March 2, 2026.
State of Ohio Prevailing Wage Rates for Heavy Highway Construction apply.
Engineer's Estimate: $833,227
| 10/02/2025 03:30 PM UTC |
|
25-21 WTP Inline Process Monitoring Equipment Replacement
25-21 WTP Inline Process Monitoring Equipment Replacement
This project involves the replacement, installation and start-up of multiple inline process monitoring instruments, associated controllers, and supporting components. The selected vendor will be responsible for procurement, start-up and initial calibration, operator training, and warranty service support for all listed equipment.
The selected vendor will not be required to pay State of Ohio prevailing wage rates.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or sepley@SidneyOH.com prior to Friday, September 19, 2025 at 1:00 pm.
Estimate: $85,000
| 09/25/2025 05:00 PM UTC |
|
25-20 WWTP PLC Updates
25-20 WWTP PLC Updates
The project consists of updating two (2) PLCs. The first PLC is located in the Raw Pump Station, is an Allen Bradley SLC 504 with HMI. The second is an Allen Bradley SLC 500 and located in the Blower Building. The successful bidder will be responsible for purchasing two Allen-Bradley Compact Logix PLCs (or equal) that are compatible with the existing Compact Logix PLCs currently active at the Wastewater Treatment Plant (WWTP). The bidder will also be responsible for removing existing PLCs and installing the new PLCs in the existing control cabinets and transferring the existing ladder logic programming to the new units. This project also includes system startup, verification of all monitoring and control functions, and troubleshooting any programming issues to ensure proper operation of the WWTP Facility.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Wednesday, August 27, 2025
The project will require the use of State of Ohio prevailing wage rates for Building Construction if the bid exceeds the threshold amount of $75,000.
Estimate of Probable Cost: $60,000
| 09/11/2025 03:30 PM UTC |
|
25-19 Aeration Basin Gates
25-19 Aeration Basin Gates
The project consists of installation of nine (9) gates on three (3) basins (3 gates/tank) including supplying anchors, grout, etc. The gates have been purchased by the City and are on-site for the installation. The basins will be completed individually to maintain plant operations.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, August 22, 2025
The project will require the use of State of Ohio prevailing wage rates for Building Construction if the bid exceeds the threshold amount of $75,000.
Estimate of Probable Cost: $62,000
| 08/28/2025 03:30 PM UTC |
|
25-12 SHE-Morrison Bridge Renovation
25-12
SHE-Morrison Bridge Renovation PID 117518
DBE GOAL 5%:
The project consists of renovating the Pratt truss and pin-connected bowstring bridge and relocating it from its current location to Sidney’s Tawawa Park.
Construction Estimate is $902.982.60
The project requires the payment of Federal Davis Bacon prevailing wage rates.
| 06/05/2025 03:30 PM UTC |
|
25-18 WWTP Raw Water Pump #5 Replacement
25-18 WWTP Raw Water Pump #5 Replacement
The project consists of the replacement of existing raw water pump #5 with a new water pump per specifications contained within the online Bidding Documents.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, May 16, 2025
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $72,000
| 05/22/2025 03:30 PM UTC |
|
25-17 Big Four Storm Outlet
25-17 Big Four Storm Outlet
The project consists of the replacement of 18” storm sewer on N. Main Avenue near the Big Four Bridge.
State of Ohio Prevailing Wage Rates apply.
Estimate: $42,400
| 05/15/2025 03:30 PM UTC |
|
25-11 Tilberry Run Drainage Ditch Improvements
25-11 Tilberry Run Drainage Ditch Improvements
The project consists of the regrading of ditch bank, the addition of gabion walls and erosion control measures.
State of Ohio Prevailing Wage Rates apply.
Estimate: $267,339
| 05/01/2025 06:30 PM UTC |
|
25-16 Russell Road / St. Marys Avenue Radar & Installation
25-16 Russell Road / St. Marys Avenue Radar & Installation
The project involves the installation of advanced and stop line radar detection and abandonment of existing loop detectors at the intersection of Russell Road and St. Marys Avenue.
State of Ohio Prevailing Wage Rates for Heavy Highway apply.
Estimate: $85,000
| 04/17/2025 03:30 PM UTC |
|
25-07 Hoge Barrett Wellfield Improvements New Water Supply Well Construction
25-07 Hoge Barrett Wellfield Improvements New Water Supply Well Construction
The project involves the abandonment of three existing wells (pump bases, motors, column pipe/drop pipe, related components), the modification of three existing 16” well casings to install two new submersible pumps and pitless adapters and one new vertical turbine pump, new 8” and 10” ductile iron piping, associated electrical and instrumentation improvements, new elevated steel service platforms, drain back vaults, and air release valve vault, grading, and restoration.
State of Ohio Prevailing Wage Rates apply.
Estimate: $1,340,000
| 03/27/2025 06:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.