26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment
The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications.
Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor.
Engineer's Estimate: $279,000.00
| 04/09/2026 06:30 PM UTC |
|
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement
The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation.
Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $105,000
| 04/16/2026 03:30 PM UTC |
|
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms.
A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
| 04/22/2026 03:30 PM UTC |
| Number | Deadline |
|---|---|
|
22-20
22-20 Recreational Trail Development Phase V
inclusive of:
COTF-304 Great Miami River Trail
SHEL-005C Great Miami River Recreation Bike Trail
SHEL-006C Sidney Canal Feeder Trail
The project consists of the construction of 3,725 feet of asphalt recreational trail to replace an existing gravel drive. The asphalt trail will pass underneath the I-75 Bridge and tie into the existing asphalt Miami Erie Canal Trail. Two (2) driven steel sheet pile retaining walls will be constructed on the slopes of the I-75 Bridge.
Engineer's Estimate: $1,901,357
| 12/15/2022 04:30 PM UTC |
|
22-18
22-18 Test Drilling, Construction, & Testing of Public Water Supply Wells
The project includes three (3) public water supply wells that are to be drilled and constructed to replace three (3) existing wells (PW-9, PW-10, & PW-7) that have experienced irreversible capacity loss.
A non-mandatory Pre-Bid Meeting will be held at 9:30 a.m. on Monday, November 28, 2022 at the Water Treatment Plant, 880 E. Court Street, Sidney, Ohio. Please RSVP to sepley@sidneyoh.com if you plan to attend the prebid meeting.
Budget Amount: $500,000
| 12/02/2022 08:00 PM UTC |
|
22-19
22-19 Broadway Avenue Water Main Replacement
(Russell Rd to Parkwood St)
OPWC #CM08Z
The project consists of abandoning the existing 8” and 10” cast iron water main and replacing with 10” PVC water main including gate valves, water service branches, fire hydrants, storm and sewer repairs, layout staking, and necessary concrete and pavement removals and restoration.
Engineer's Estimate: $606,776
| 12/01/2022 08:00 PM UTC |
|
22-17
22-17 WWTP CATWALK CONCRETE REPAIR
The project includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, appurtenances, mobilization/demobilization, and bonding necessary to repair and stabilize concrete on an aeration basin catwalk that has separated.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Wednesday, November 23, 2022.
Estimate: $44,364.87
| 12/01/2022 04:30 PM UTC |
|
22-16
Custenborder Pickleball Courts REBID
The project consists of the construction of four (4) pickleball courts at Custenborder Field including site work, seeding & mulching, installation of 6’ chainlink fence, net posts & netting, and pickleball court surfacing per plan specifications. An alternate bid will be accepted for construction of two (2) additional pickleball courts.
Construction Estimates
Base: $70,699
Alternate: $26,607
| 11/17/2022 04:30 PM UTC |
|
22-15
22-15 Fairmont Drive Sanitary Sewer Replacement
The project consists of the replacement of approximately 1,250 feet of existing 8” sanitary sewer with 10” sanitary sewer including laterals, manholes, & surface restoration.
Engineer's Estimate: $383,420.50
| 10/06/2022 03:30 PM UTC |
|
22-14
22-14 Monumental Building Window Repairs
The project consists of repairing windows in the Monumental Building in accordance with the drawings & specifications provided. The contractor will remove storm glass, repair wood windows and trim, replace wood window frames and sash units, re-glaze, and then clean all windows and reinstall storm windows. Some windows are listed for complete replacement and will need to match the existing windows.
Budget Estimate: $210,993
| 08/31/2022 03:30 PM UTC |
|
22-13
Custenborder Pickleball Courts
The project consists of the construction of four (4) pickleball courts at Custenborder Field including site work, seeding & mulching, installation of 6’ chainlink fence, net posts & netting, and pickleball court surfacing per plan specifications. An alternate bid will be accepted for construction of two (2) additional pickleball courts.
Construction Estimates
Base: $70,699
Alternate: $26,607
| 08/10/2022 03:30 PM UTC |
|
22-12
22-12 2022 Sanitary Manhole Replacements
The project will remove deteriorated sanitary manholes in various locations throughout the City of Sidney and replace with structures compliant with new City Engineering Standards. The project also includes excavation, connections to the existing pipes, and asphalt repairs.
| 06/09/2022 03:30 PM UTC |
|
22-11
22-11 Monumental Building HVAC
The project is necessary to install and integrate the front end controls for the HVAC system in the Monumental Building and will include the installation of boiler/chiller plant controls and air handling unit (AHU) controls.
Estimate: $150,000
| 06/02/2022 03:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.