General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-09 RWPS Generator & Electrical Improvements
26-09 RWPS Generator & Electrical Improvements The project consists of the installation of new standby power system which includes a natural gas-fueled generator and new automatic transfer switch (ATS), electrical system modifications for ATS and new variable frequency drive, vertical turbine pump, motor replacement, piping modification and construction of elevated concrete generator pad as indicated in the Drawings and Technical Specifications. An voluntary alternate is included to possibly abandon/remove existing underground storage tank (UST) system and associated piping/conduit as indicated in the Drawings and Technical Specifications. A NON-MANDATORY pre-bid meeting is scheduled for Monday, May 4, 2026 at 10:00 am located at the WTP, 880 E. Court Street, Sidney, Ohio. State of Ohio Prevailing Wage Rates for Building Construction apply. Estimate: $1,130,000
06/04/2026 03:30 PM UTC
26-14R Raw Water Booster Pump Replacement REBID
26-14R Raw Water Booster Pump Replacement REBID The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, May 29, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
06/04/2026 03:30 PM UTC
26-13 Great Miami River - Sidney Ohio Water Intake Dam Modification
26-13 Great Miami River - Sidney Ohio Water Intake Dam Modification The project includes the construction of a rock riffle downstream of a low-head dam and stabilization of the existing dam. The project is in the Great Miami River, along Custenborder Park in City of Sidney, Shelby County, Ohio. A pre-bid meeting will be held at 2:00 p.m. on Tuesday, June 2, 2026 onsite at 455 Canal Street, Sidney, Ohio. This meeting is not mandatory, but attendance is strongly recommended. Subcontractors, small, minority or women owned enterprises, and other interested parties are invited to attend. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. Participation goals for DBE, SBE, MBE, or EDGE have not been established for this project; however, DBEs, SBEs, MBEs, and EDGE Bidders are encouraged to review the project and consider submitting a Bid. All qualified Bidders will receive consideration without regard to race, color, religion, national origin, ancestry, age, sex, sexual orientation, handicap or disability. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $327,420
06/11/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms. A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365. ADDENDUM #1 ISSUED April 20, 2026
04/29/2026 03:30 PM UTC
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
04/16/2026 03:30 PM UTC
26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor. Engineer's Estimate: $279,000.00
04/09/2026 06:30 PM UTC
26-01 SHE-Spruce Ave -02.27 Bridge Replacement PID 114201
SBE GOAL 10% The project consists of replacement of existing deficient bridge with a 3-span steel rolled beam on semi-integral abutments and t-type piers and increase of vertical clearance over CSX Transportation railroad. Project will include necessary approach and intersection work to accommodate the increase in vertical profile for clearance requirements over CSX Transportation and relocation of watermain under the railroad. BIDDER MUST BE OHIO DEPARTMENT OF TRANSPORTATION (ODOT) PREQUALIFIED FOR BRIDGE LEVEL II AND IN ALL WORK TYPES NECESSARY FOR THE SUCCESSFUL COMPLETION OF THE PROJECT. This project requires the payment of Federal Davis Bacon prevailing wage rates. ADDENDUM #1 Revised Estimate: $4,294,427.60
03/26/2026 03:30 PM UTC
26-03 CURB & GUTTER REPLACEMENT
26-03 26-03 CURB & GUTTER REPLACEMENT The project consists of the removal & replacement of curb & gutter and curb ramps with truncated domes and also includes the reconnection of drain tiles and site restoration. Construction Estimate: $615,857 State of Ohio Prevailing Wages will apply.
03/12/2026 03:30 PM UTC
26-06 Pool Floor Painting
26-06 Pool Floor Painting The project consists of renovation of existing commercial swimming pool including but not limited to: pressure washing and surface preparation; removal and replacement of expansion joints; caulking of pool penetrations and transitions; application of pool coating system; final cleaning and coordination of pool filling. Contractor must have prior pool painting experience with sealing and expansion joints. State of Ohio Prevailing Wage Rates for Building Construction apply. Budget Estimate: $95,000
03/05/2026 07:30 PM UTC
26-07 Raw Water Pump #6 Replacement
26-07 WWTP Raw Water Pump #6 Replacement The project consists of the replacement of existing raw water pump #6 with a new water pump per specifications contained within the online Bidding Documents. A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, February 27, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $79,000
03/05/2026 05:30 PM UTC
26-08 Stewart Subdivision Water & Sewer Replacement PH II
26-08 Stewart Subdivision Water & Sewer Replacement PH II The project consists of the reconstruction of Cheryl Avenue, Robert Place, and Glenn Place cul-de-sacs including replacement of storm sewer, sanitary sewer, waterline, sidewalk, and curb & gutter as needed. State of Ohio Prevailing Wage Rates apply. Estimate: $1,380,636
03/05/2026 04:30 PM UTC
26-02 SIDEWALK PROGRAM
26-02 2026 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. State of Ohio Prevailing Wage Rates apply. Construction Estimate: $370,870
02/26/2026 07:30 PM UTC
26-05 WWTP BIOSOLIDS DISPOSAL
26-05 WWTP Biosolids Disposal Description of Job: The project will include removal and disposal of 500-700 dry tons of Wastewater Treatment Plant biosolids per each year of the Contract. Budget Amount per year $51,000
02/26/2026 04:30 PM UTC
1 - 10 of 111 Solicitations
← Previous 1 3 4 5 6 7 8 9 10 11 12