City of Sidney
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
Number | Deadline |
---|---|
22-16
Custenborder Pickleball Courts REBID
The project consists of the construction of four (4) pickleball courts at Custenborder Field including site work, seeding & mulching, installation of 6’ chainlink fence, net posts & netting, and pickleball court surfacing per plan specifications. An alternate bid will be accepted for construction of two (2) additional pickleball courts.
Construction Estimates
Base: $70,699
Alternate: $26,607
| 11/17/2022 04:30 PM UTC |
22-15
22-15 Fairmont Drive Sanitary Sewer Replacement
The project consists of the replacement of approximately 1,250 feet of existing 8” sanitary sewer with 10” sanitary sewer including laterals, manholes, & surface restoration.
Engineer's Estimate: $383,420.50
| 10/06/2022 03:30 PM UTC |
22-14
22-14 Monumental Building Window Repairs
The project consists of repairing windows in the Monumental Building in accordance with the drawings & specifications provided. The contractor will remove storm glass, repair wood windows and trim, replace wood window frames and sash units, re-glaze, and then clean all windows and reinstall storm windows. Some windows are listed for complete replacement and will need to match the existing windows.
Budget Estimate: $210,993
| 08/31/2022 03:30 PM UTC |
22-13
Custenborder Pickleball Courts
The project consists of the construction of four (4) pickleball courts at Custenborder Field including site work, seeding & mulching, installation of 6’ chainlink fence, net posts & netting, and pickleball court surfacing per plan specifications. An alternate bid will be accepted for construction of two (2) additional pickleball courts.
Construction Estimates
Base: $70,699
Alternate: $26,607
| 08/10/2022 03:30 PM UTC |
22-12
22-12 2022 Sanitary Manhole Replacements
The project will remove deteriorated sanitary manholes in various locations throughout the City of Sidney and replace with structures compliant with new City Engineering Standards. The project also includes excavation, connections to the existing pipes, and asphalt repairs.
| 06/09/2022 03:30 PM UTC |
22-11
22-11 Monumental Building HVAC
The project is necessary to install and integrate the front end controls for the HVAC system in the Monumental Building and will include the installation of boiler/chiller plant controls and air handling unit (AHU) controls.
Estimate: $150,000
| 06/02/2022 03:30 PM UTC |
22-10
22-10 COURTVIEW CENTER PARKING LOT
The project includes the 1-1/2” milling and resurfacing of parking lot at the Courtview Center, 100 S. Main Avenue including paint striping and parking stall numbering per specifications.
Construction Estimate: $90,626
ADD #1 Construction Estimate $103,546
| 03/17/2022 04:30 PM UTC |
22-09
22-09 Marilyn Drive & Ann Place Sanitary Sewer Replacement
The project includes the replacement of existing sanitary sewer and laterals; reconstruction of curb and roadway; and associated storm sewer work.
Estimate: $612,019
| 03/17/2022 03:30 PM UTC |
22-04
22-04 WATER WELL #9 REHABILITATION
The project includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, and appurtenances necessary for the repair and redevelopment of the City's #9 Water Well.
A non-mandatory Pre-Bid Meeting will be held at 9:30 a.m. on Wednesday, February 23, 2022 at the Water Treatment Plant, 880 E. Court Street, Sidney, Ohio. Please RSVP to sepley@sidneyoh.com if you plan to attend the prebid meeting.
Construction Estimate: $60,000
| 03/10/2022 09:00 PM UTC |
22-06
22-06 2022 Sidewalk Program
The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching.
Construction Estimate: $209,788
| 03/10/2022 04:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.