General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
26-12 Reconstruct Weather Reporting Equipment
26-12 Reconstruct Weather Reporting Equipment The project includes replacing the existing Automated Weather Observing System (AWOS) with new equipment per specifications. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor. Engineer's Estimate: $279,000.00
04/09/2026 06:30 PM UTC
26-14 Raw Water Booster Pump Replacement
26-14 Raw Water Booster Pump Replacement The project includes the furnishing, installation, testing, and commissioning of two (2) new raw water booster pumps, including all appurtenances, coatings, labor, materials, equipment, and incidentals required for a complete and operational installation. Site visits may be coordinated by contacting WTP Superintendent, Seth Epley at 937.498.8180 or SEpley@SidneyOH.com prior to 1:00 p.m. on Friday, April 10, 2026. The project requires the use of State of Ohio prevailing wage rates. Estimate of Probable Cost: $105,000
04/16/2026 03:30 PM UTC
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste
26-17 Collection & Disposal of Residential Solid Waste, Recyclable Materials and Yard Waste The Contract will include the collection and disposal of all solid waste and collection and processing recyclable materials and yard waste generated by residential units and shall be for a period of three (3) years beginning June 1, 2026 with an option to extend the Contract for up to two (2) additional 1-year terms. A non-mandatory pre-bid information/question meeting will be held at 2:00 pm, EST, April 15, 2026 at the City’s Council Chambers, 1st Floor of PODS, 201 W. Poplar Street, Sidney, OH 45365.
04/22/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
23-08 Alpine Court Reconstruction
23-08 Alpine Court Reconstruction The project consists of the reconstruction of roadway on Alpine Court between the existing curb including pavement & pavement markings. The existing curbs are to remain in place. Engineer's Estimate: $285,370
05/11/2023 07:00 PM UTC
23-07 Pt. Jefferson Road Storm Outlet
23-07 Pt. Jefferson Road Storm Outlet The project consists of erosion repairs of storm water outfall. Engineer's Estimate: $227,390
05/11/2023 03:30 PM UTC
23-06
23-06 Sidney City Airport Apron B, D, & F Rehabilitation The project includes asphalt milling, placement of sand slurry seal and asphalt and pavement markings. Engineer's Estimate: $295,100 ADDENDUM NO. 1 Engineer's Estimate $329,075
05/01/2023 03:30 PM UTC
CDD23-01
Former Wagner Manufacturing Site Building Demolition, Asbestos Abatement, and Site Clearing ADDENDUM #1 ISSUED MARCH 17, 2023 ADDENDUM #2 ISSUED MARCH 23, 2023 ADDENDUM #3 ISSUED MARCH 24, 2023 ADDENDUM #4 ISSUED APRIL 6, 2023 ****An additional site visit will be held March 31, 2023 at 10:00 a.m. EST. This additional site visit is optional and is only for those who attended the mandatory Pre-Bid meeting on March 22, 2023. Those wishing to participate should meet at the site.***** A MANDATORY PRE-BID CONFERENCE will be held for prospective bidders on March 22, 2023, at 10:00 a.m. (EST) at Council Chambers, City Hall, 201 West Poplar Street, Sidney, Ohio 45365. The project includes the furnishing of all material; equipment; and labor necessary in the demolition, removal, including asbestos-containing materials (ACM) abatement, and disposal of the existing building on the former Wagner Manufacturing site. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $3,440,525
04/12/2023 07:00 PM UTC
23-05
23-05 2023 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. Construction Estimate: $144,960
03/16/2023 03:30 PM UTC
23-04
Echo Drive Extension The project includes the construction for the extension of Echo Drive to connect with Folkerth Avenue including sanitary sewer & storm sewer. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $458,104
02/23/2023 04:30 PM UTC
23-03
23-03 2023 STREET RESURFACING The project includes planning of asphalt, placement of asphalt surface course, asphalt concrete surface course, thermoplastic paint markings, and traffic loop. Construction Estimate: $862,982.60
02/16/2023 04:30 PM UTC
23-01
23-01 2023 CURB & GUTTER REPLACEMENT The project consists of the removal & replacement of curb & gutter and curb ramps with truncated domes and also includes the reconnection of drain tiles and site restoration. Construction Estimate: $372,653
02/02/2023 04:30 PM UTC
23-01
Custenborder Pickleball Courts 2023 The project consists of the construction of four (4) pickleball courts at Custenborder Field including site work, seeding & mulching, installation of 6’ chainlink fence, net posts & netting, and pickleball court surfacing per plan specifications. An alternate bid will be accepted for construction of two (2) additional pickleball courts. Construction Estimates Base: $113,892 Alternate: $46,868
01/26/2023 04:30 PM UTC
22-21
22-21 Linden Avenue Sanitary Sewer Replacement The project consists of the replacement of approximately 1,820 l.f. of existing 8” sanitary sewer main on Linden Avenue and Forest Street from Michigan Street to Park Street including 6” sanitary laterals with inspection chambers and sanitary manholes. Also included is site restoration with resurfacing on Linden Avenue. Construction Estimate: $619,560
12/29/2022 04:30 PM UTC
61 - 70 of 108 Solicitations
1 2 3 4 5 7 9 10 11