General Info

Business Logo

City of Findlay

318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
HAN Blanchard Street Bridge Rehab
The services include preparation of construction contract plans for HAN Blanchard Street Bridge Rehab as well as assisting in obtaining Municipal Bridge Grant Funds.
04/16/2026 06:00 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
35781800 WTP SCADA Upgrade
The selected firm will evaluate and review the existing SCDA and network system for the City of Findlay’s Water Treatment Plant. As well as all process control, development of appropriate back up procedures as well as an efficient method of changing over to local control of each of the process control units. The firm will make recommendations of communication improvements with the plant and all satellite sites. An evaluation of process controls at the reservoir sites will need to be completed as well as recommendations of appropriate upgrades. To include but not limited to additional data points to be monitored at the reservoir location. Upon completion of the evaluation, on-site interviews, and technical discussions a set of recommendations will be developed. The recommendations will include but not limited to the subjects of the overall SCADA supporting networking system architecture, standard hardware and software components and their integration, and data access from off SCADA network system. The desire is for a modern robust SCADA system that has the potential to grow as technology changes and the plant is modified in years to come. Integration of cameras and tablets will be a plus in the consideration of the new system yet maintaining the security and quality of the current system.
08/24/2018 06:00 PM UTC
35782300 WTP Fire Alarm System
The selected firm shall review the current fire alarm systems at the City of Findlay’s Water Treatment Plant. Propose a replacement solution as necessary for the buildings that meets all current fire code requirements. The vendor should provide all labor, equipment and materials for maintenance and testing in accordance to the State of Ohio Fire Code. Install any/all necessary equipment, complete set-up of systems, perform tests and inspections and provide customer training and owner system manuals including completed drawings to show device locations. Vendor will provide monthly Fire Alarm System monitoring service plan and any/ all necessary permits.
08/24/2018 06:00 PM UTC
31984100
The Cube, located in Findlay, Ohio are performing needed Code Updates to the existing building. This project will consist of exterior waterline and storm sewer work, new CMU building structure, Zamboni drainage pit, new HVAC mechanical, plumbing and electrical updates.
08/22/2018 06:00 PM UTC
32852900
Lima Avenue and Western Avenue Intersection Upgrade
07/11/2018 06:00 PM UTC
2018 Waterline Package
City of Findlay 2018 Annual Small Waterline Package: Concord Ct, 6-inch- Parkside to Vincent St Milton St, 6-inch- Hull Ave. to Bernard Ave. Woodworth Dr., 6-inch (8" Alt.)- Fostoria Ave. to Glen Rd Summit St, 6-inch.- Lima St. to Lima Ave Merriweather, 4-inch (Alt.)- Chapel Dr. to Chapel Dr.
05/25/2018 06:00 PM UTC
35780400
City of Findlay: W. Sandusky Street Waterline Extension to Dold Farms
05/22/2018 06:00 PM UTC
Pavement Marking
City of Findlay-2018 Annual Pavement Marking Project. This project consist of pavement marking for various streets in the City of Findlay, markings within the project are Double Yellow Centerline, Dashed Yellow Line, Dashed White Line, and White Edge Line.
05/07/2018 06:00 PM UTC
32556000
City of Findlay- B4/B6 Sewer Separation Phase I & Phase II, Eng. Est.: $ 1,085,000 This Project consist of a sewer separation for Foulke Ave., Allen Ave., Midland Ave., Garfield Ave., and George St. from the railroad track to Blanchard St. This project also consist of a waterline replacement on Garfiled and George. Substantial Completion for Phase II: June 1, 2018 Final Completion for WL and Phase I: August 31, 2018
05/01/2018 06:00 PM UTC
35782000
Fishlock Avenue- Waterline Replacement and Resurfacing Project. City of Findlay will be making improvements to Fishlock Ave. This project will consist of, but not limited to; waterline replacement, curb ramp upgrade, curb replacement, and asphalt paving.
04/30/2018 07:00 PM UTC
35250600
Drainage Improvements for the City of Findlay Airport and Gray St.
04/27/2018 07:00 PM UTC
341 - 350 of 352 Solicitations
1 2 28 29 30 31 32 33 35