City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2027, to December 31, 2027.
| 11/12/2026 07:00 PM UTC |
|
35664600
This project consists of removing an existing 12” water line and a 15” sanitary line out of the existing 36” storm sewer. To remove the existing 12” water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15” out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18” sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18” sanitary sewer to be attached to the existing pipe that is to southeast.
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes:
1. Rock Elevation: 781.00’ +/-
2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP.
FINAL COMPLETION DATE: May 28, 2027
ENGINEER’S ESTIMATE: $ 271,380
| 11/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
2018 Waterline Package
City of Findlay 2018 Annual Small Waterline Package:
Concord Ct, 6-inch- Parkside to Vincent St
Milton St, 6-inch- Hull Ave. to Bernard Ave.
Woodworth Dr., 6-inch (8" Alt.)- Fostoria Ave. to Glen Rd
Summit St, 6-inch.- Lima St. to Lima Ave
Merriweather, 4-inch (Alt.)- Chapel Dr. to Chapel Dr.
| 05/25/2018 06:00 PM UTC |
|
35780400
City of Findlay: W. Sandusky Street Waterline Extension to Dold Farms
| 05/22/2018 06:00 PM UTC |
|
Pavement Marking
City of Findlay-2018 Annual Pavement Marking Project.
This project consist of pavement marking for various streets in the City of Findlay, markings within the project are Double Yellow Centerline, Dashed Yellow Line, Dashed White Line, and White Edge Line.
| 05/07/2018 06:00 PM UTC |
|
32556000
City of Findlay- B4/B6 Sewer Separation Phase I & Phase II, Eng. Est.: $ 1,085,000
This Project consist of a sewer separation for Foulke Ave., Allen Ave., Midland Ave., Garfield Ave., and George St. from the railroad track to Blanchard St. This project also consist of a waterline replacement on Garfiled and George.
Substantial Completion for Phase II: June 1, 2018
Final Completion for WL and Phase I: August 31, 2018
| 05/01/2018 06:00 PM UTC |
|
35782000
Fishlock Avenue- Waterline Replacement and Resurfacing Project.
City of Findlay will be making improvements to Fishlock Ave. This project will consist of, but not limited to; waterline replacement, curb ramp upgrade, curb replacement, and asphalt paving.
| 04/30/2018 07:00 PM UTC |
|
35250600
Drainage Improvements for the City of Findlay Airport and Gray St.
| 04/27/2018 07:00 PM UTC |
|
32880100-A
City of Findlay 2018 Annual Resurfacing Program-Contract A (Concrete)
| 04/11/2018 06:00 PM UTC |
|
32880100-B
City of Findlay 2018 Annual Resurfacing Program-Contract B (Asphalt)
| 04/11/2018 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.