City of Findlay
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
318 Dorney Plaza Rm 304, Findlay, OH 45840
(419) 424-7121
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
13
Item #13 - Asphalt Concrete - The City of Findlay is accepting proposals for Asphalt Concrete for the period January 1, 2027, to December 31, 2027.
| 11/12/2026 07:00 PM UTC |
|
35664600
This project consists of removing an existing 12” water line and a 15” sanitary line out of the existing 36” storm sewer. To remove the existing 12” water line from the storm sewer it will need to be lowered under the storm sewer. It will need to be lowered roughly 5 feet. To remove the existing 15” out of the storm sewer the manholes on both ends will need to be lowered. The existing manholes will be removed, and the new manholes will be roughly 3 feet lower than the existing ones. There will be a new 18” sanitary sewer that is ran from the two new manholes that goes under the existing storm sewer, that is 408 LF. This project will also include attaching all other existing lines to the new manholes. The south manhole will also need a 58 LF of 18” sanitary sewer to be attached to the existing pipe that is to southeast.
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services.
After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes:
1. Rock Elevation: 781.00’ +/-
2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP.
FINAL COMPLETION DATE: May 28, 2027
ENGINEER’S ESTIMATE: $ 271,380
| 11/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
1
Item #1 - Pebble Lime (BULK) - The City of Findlay is accepting proposals for Pebble Lime (BULK) for the period January 1, 2021 to December 31, 2021.
| 11/05/2020 07:00 AM UTC |
|
35600600
City of Findlay 2020 Annual Sewer and Manhole Lining Program
The project consists of no-dig rehabilitation of several deteriorating sanitary sewer lines in the City of Findlay (hereinafter referred to as “City”). Incidental to the lining shall be the reinstatement of sewer service laterals without excavation.
The Base Bid includes several sewer locations in different areas of the City. Some sewer lines to be lined are in close proximity of each other while others are somewhat isolated. The sizes to be lined include 8-inch, 10-inch, 12-inch, 18-inch, 20-inch and 24-inch sewers. Bidders are requested to provide a unit price per foot based on the size of host pipe. If sizes, lengths, or any other changes significantly differ from the provided information, the City will work with the Contractor to make accurate price adjustments.
Potential Additive Alternates:
Potential additive alternates to the Contract are included and shall be used at the City’s discretion. If project funds are available, the City may designate any of these sewers for lining, manholes to be lined, or additional camera services. Only entire sections (from manhole to manhole) will be considered for lining.
Completion Date: April 9, 2021
Engineering Estimate (Base Bid Only): $382,616
| 08/06/2020 06:00 PM UTC |
|
35702700
City of Findlay Penrose Public Infrastructure Project
This public infrastructure project will include the new construction of 415 LF of 8-inch waterline, and 464 LF of sidewalk located within the Birchaven Complex as a part of the Blanchard Valley Health System.
Waterline Final Completion Date: August 31, 2020
Sidewalk Final Completion Date: December 31, 2021
Engineer’s Estimate: $86,295.00
| 07/16/2020 06:00 PM UTC |
|
32884500
City of Findlay HAN-CR236-0.00, PID100184
This project consist of widening out County Road 236 one lane to the east from Sandusky St. (SR568) to Tiffin Ave. (US224) as well as installing a multiuse path on the east side of the right of way. The widening of County Road 236 will reconfigure the roadway to a three lane road consisting of two drive lanes and a center turn lane. Along with the roadway widening a new 10 ft. wide multiuse path will be installed on the east side of the roadway from Sandusky St. to Tiffin Ave. New curb and gutter will be placed on this section of roadway, which will also include the relocation of existing storm structures. This project consist of, but not limited to; installing 2,450 SF of concrete sidewalk, 56,860 SF of asphalt multiuse path, 1208 CY of Asphalt Concrete Surface Course, 514 CY Asphalt Concrete Intermediate Course, aggregate base, new storm lines and structures, and grading and seeding.
The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%.
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy
Final Completion: on or before October 23, 2020
Engineering Estimate: $ 2,196,661.30
| 05/14/2020 06:00 PM UTC |
|
35293400
City of Findlay Airport Taxiway A (A4 to A6) Rehabilitation
Mill and overlay of Taxiway A from connector A4 through A^ at the Findlay Airport. There will be no geometry changes and the pavement markings will be updated to meet FAA Advisory Circular (AC) 150/5340-1M, Standards for Airport Markings, within the project limits.
Pre-Bid Meeting will be held on Wednesday, May 6, 2020 at 11:00 AM at the Findlay Airport Terminal Building located at 1615 Gary Street, Findlay, OH 45840. The meeting will be held outside.
There is a DBE Goal of 6% for the project
Engineer's Estimate (Base Bid)- $397,937.00
Completion Date: October 23, 2020
| 05/14/2020 06:00 PM UTC |
|
32876000
City of Findlay HAN-Lincoln & Blanchard Paths, PID104247
This project consist of a lane configuration of Blanchard Street between Sixth Street and Center Street to add dedicated bike lanes on the east and west side, reconstructed traffic signals at five signalized intersections, ADA compliant curb ramps, and resurfacing. In addition to the Blanchard Street lane configuration, a multi-use path will be constructed on the north side of Lincoln Street from Cory Street to Blanchard Street. The Lincoln Street portion of the project will also include upgrades to signalized pedestrian controls at 2 intersections and ADA compliant curb ramps. This project consist of, but not limited to, installing 30,000 SF of concrete sidewalk, 46,381 SY of pavement planning, 1933 CY of Asphalt Concrete Surface Course, 1200 LF of curb replacement aggregate base, new signs, upgrade 5 intersections, and grading and seeding.
The 2019 Ohio Department of Transportation (ODOT) Construction and Materials Specifications shall be followed. Required modifications to the ODOT specifications are noted herein. City of Findlay Specifications and Standard Drawings shall also be adhered to where applicable and are available at the City of Findlay Engineering Department, 318 Dorney Plaza, Findlay, OH 45840. Federal prevailing wages shall apply. The DBE goal for this project is 7%.
All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at:https://odot.formstack.com/forms/dbe_copy
Substantial Completion: on or before October 23, 2020
Final Completion: on or before August 13, 2021
Engineering Estimate: $ 2,170,854.00
| 05/13/2020 06:00 PM UTC |
|
35600100 - 2020 Annual Sewer Televising Program
City of Findlay 2020 Annual Sewer Televising Program-This program consists of performing closed circuit television inspection on various storm and sanitary sewers located within the City of Findlay. This program will assess the condition of the selected sewer lines, and present the information to the City of Findlay so that the information can be used to make decisions regarding rehabilitation and/ or replacement. The sewers will be rated by using a standardized field investigation approach to efficiently utilize time and resources when evaluating the selected sewers. This project shall consist of, but not limited to, sewer cleaning as necessary for proper sewer evaluating, CCTV recordings, evaluating and rating of recorded sewers, and electronic format submission of recorded/ evaluated sewers.
Completion Date: April 10, 2021
Engineering Estimate (Base Bid Only): $730,000
| 05/12/2020 06:00 PM UTC |
|
35691700
Madison Street and Monroe Avenue Sanitary Sewer Replacement
This project consists of replacing an existing 8-inch Vitrified Clay Pipe with new 8-inch SDR35 pipe on the South side of both Madison Street and Monroe Avenue between North Main Street and Morey Avenue. There are 89 existing laterals that will need to be tied into the new Sanitary Sewer. The existing 8-inch sewer will need to remain operational until all the existing lateral are tied into the new sewer. Upon completion, the existing 8” sanitary sewer will be abandoned by grouting.
Final Completion Date: August 14, 2020
Engineer’s Estimate: $426,500
| 04/14/2020 06:00 PM UTC |
|
35795300
City of Findlay Sixth Street Waterline Replacement.
This project consists of replacing a 10-inch waterline on Sixth Street from Main Street to Eagle Creek. The project consist of two sections of 10-inch waterline and one section of 16-inch waterline. The 10-inch sections will run from Main Street to Park Street (waterline will be ran on the north side in the grass) and from Blanchard Street to Eagle Creek (waterline will be ran in the westbound lane). The section from Park Street to Blanchard Street will consist of a 16-inch waterline install that will be ran in the westbound lane of Sixth Street. The 16-inch waterline will be tied onto an existing 16-inch stub at Blanchard Street and will be jack and bored under the CSX railroad tracks to Park Street.
This project shall consist of, but not limited to, 695 LF of 16-inch C900 waterline, 60 LF of 22-inch casing jack and bore, 1680 LF of 10-inch Type B C909 waterline, 1350 LF of 10-inch Type C C909 waterline, 200 LF of 6-inch C909 waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
Substantial Completion Date: August 7, 2020
Final Completion Date: August 21, 2020
Engineer’s Estimate: $550,000.00
| 03/11/2020 06:00 PM UTC |
|
35793300
City of Findlay Olive Street 16-inch Waterline Extension.
This project consists of installing a new 16-inch C905 waterline on Olive Street, running in the eastbound lane of Olive Street. The waterline will start from a 16-inch stub on Park Street and will extend to an existing 16-inch stub at Brookside Drive. The new waterline will need to be jack and bored under the CSX Railroad and Horizontal Directional Drill under Eagle Creek. This project shall consist of, but not limited to, 1760 LF of 16-inch C905 waterline, jack and bore 60 LF of 22-inch casing pipe, 225 LF of 16-inch directional drill, 60 LF of 8-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.
Final Completion Date: August 21, 2020
Engineer’s Estimate: $525,000.00
| 03/04/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.